Post Job Free
Sign in

Engineer Power Plant

Location:
Hayy ar Rashid, Kirkuk, Iraq
Posted:
August 17, 2020

Contact this candidate

Resume:

*

AYDEN WAYES Senior I &C Engineer

PERSONAL Information

Name: Ayden Wayes Mahmood.

Nationality: Iraq

Birth Date: 1981

Gender: Male

Marital Status: Married

EDUCATION

• BSc. Electrical Engineering

LANGUAGES

1. Arabic : fluent

2. Kurdish : fluent

3. Turkmen: Native

4. Turkish : fluent

5. English : Very good

Trainings

• Training courses in Mark VIe Gas Turbine controlr in Erbil.

• Training courses in Mark VIe Steam Turbine controlr in Erbil.

• Training courses in DCS Ovation software project course in Dubai.

• Training courses in DCS Ovation engineering and maintenance course in Dubai.

• Training courses in operation frame 9E by ENKA Power.

• Training courses in CMMS (Computerizes Maintenance Management system).

• Training courses in Work Authorization Program (work request, work order and permit to work) by ENKA Power.

• Training courses in general safety awareness by ENKA Power.

• Training courses in Confined Space Entry by ENKA Power.

• Training courses in R.C.A (Root Cause Analysis)by ENKA Power.

• Training in hot gas bath inspection

• Training in combastion chamber inspection.

• Training in LOTO (Lock Out Tag Out) and permit to work system.

• Training courses in operation Steam Turbine.

• Training course in electric and electronic technology for education and technical development in kirkuk.

• Training course for elictric and elctronic systems by North Oil Company in Kirkuk.

• ABB MUX Introdection to FOX516 SDH Platform (29-30, August 2019) in Baden, Switzerland. 2

AYDEN WAYES Senior I &C Engineer

• ABB MUX FOX516 Multiservice Platform for SDH Networks (2-6, September 2019) Baden, Switzerland. EXPERIENCE RECORD

Dates: Aug. 2016 till present

Employer: Mass group holding

Project: 4500 MW Besmaya power plant project

Job title: I&C Manager

Job Description:

• Following I&C activities, Installation, Erection, commissioning.

• Inspecting for daily activities of NFI’s (notice for Inspection).

• Release the ITR’s (Inspection Test Reports).

• Inspecting for Cable pulling and termination activities.

• Following commissioning daily activities.

• Following cold loop checks.

• Following Hot loop checks.

• Following installation and energizing firefighting and fire detection system.

• Following installation and energizing HVAC system.

• Following installation and energizing Water treatment plant system.

• Following P&ID`s to inspect the installation Control valves, motorized valves, transmitters, …. etc.

• Following the turnover documents for construction and commissioning.

• Following the punch items clearance.

• Following all the FDS & FFS installation and commissioning activities of the switch yard.

• Following all the telecommunication system installation and commissioning activities of the switch yard. Dates: Feb. 2014 till Aug. 2016

Employer: Mass group holding

Project: Combined Cycle Project

Job title: I&C Team Leader

Job Description:

• Following I&C activities, Installation, Erection, commissioning.

• Inspecting for daily activities of RFI’s (Ready for Inspection).

• Release the ITR’s (Inspection Test Reports).

• Inspecting for Cable pulling and termination activities.

• Following commissioning daily activities.

• Following cold loop checks.

• Following Hot loop checks.

• Following installation and energizing firefighting and fire detection system.

• Following installation and energizing HVAC system.

• Following installation and energizing Water treatment plant system.

• Following P&ID`s to inspect the installation Control valves, motorized valves, transmitters, …. etc.

• Also, I joined Factory Acceptance Test for DCS Ovation v3.5 for checking the system.

• Following the turnover documents for construction and commissioning. 3

AYDEN WAYES Senior I &C Engineer

Dates: Feb 2012 to Feb. 2014

Company: Mass group holding

Job title: I&C Maintenance Engineer

Job Description:

• I&C maintenance engineer for preventive, corrective maintenance activities.

• Follow preventive, corrective maintenance by using CMMS

• Follow all required operational spare part for I&C department.

• Troubleshooting the problems and solve it.

• Follow the TILs and apply it with I&C Team.

Dates: July 2010 to December 2010

Employer: Keral İnşaat

Project: Erbil airport

Job title: side engineer

Job Description:

• Following side activities for installation firefighting system and energizing, commissioning, handover the system.

• Following the activities for cable pulling and termination. Dates : December 2011 to February 2012

Employer : Burhan Company

Project : Kirkuk Technical Institute project

Job title : side engineer

Job Description:

• Following daily works and make sure the actual work is matching with drawing.

• Installing CCTV system.

• Fire detection System installation

• Firefighting System installation.

Contacts

Mobile: +964 (0-770-****-***

+964 (0-781-****-***

E-mail: *********@*****.***

*****.****@*****.***



Contact this candidate