Post Job Free
Sign in

Drilling Welding

Location:
Alexandria, Egypt
Salary:
6000$
Posted:
August 16, 2020

Contact this candidate

Resume:

MOHAMED GOMAA ABD RABO

Diving

Certificates

Achieved:

Offshore

Work

Experience:

** ***. **** ** **

Feb. 2020

** ***. **** ** **

Dec. 2019

Certificate of Diving System Technician.

Certificate of IMCA for Commercial Diving.

Certificate of Diver Medical Technician (DMT).

Certificate of hyperbaric oxygen therapy.

Certificate of First Aid.

Certificate of Diving and Life Saving.

Certificate of Surface Supply.

Certificate of Welding and Cutting.

Certificate of Basic Firefighting and Damage Control Course. Diving Company : Salasell of shore

Client: Aramco K.S.A.

Position : DMT Air diver

Location : Jizan spm

Job Description: S / B / M

Open 24 valve on plem

Recover sink Houser and chain surface attached to sink Houser. Diving Company : Salasell of shore

Client: Aramco K.S.A.

Position : DMT Air diver

Location : Jizan spm

Job Description: Create a dock.

Punching the steel blinds using the punching machine and installing the fender using different equipment

Anode welding.

Open 24" valve on plem.

Recover sink Houser and chain surface attached to sink Houser. ELQUDES ST., ELSALAMLEK

BUILDUNG IN FRONT OF

CARFFOUR, ELSEUOFF

SHAMAA,

ELMONTAZAH, Alexandria,

EGYPT.

Mobil: +201*********.

+201*********.

E-mail: mohamed.gomaa475sael

@gmail.com.

25 Sep. 2019 to 13

Oct 2019

01 Jan. 2018 to 31

Dec.2018

Drilling new hole to install cornal fenaar .

Continue installing

Align corner fender’s back hanging plat

Securing with locking not’s

Taking measurements for proposal template for fender Drilling for align new fender miss alignment of portholes Installation fender sat station

Hydraulic impacting bolts fenders

Drilling shit pllye and secure locking nuts

Diving Company : Salasell of shore

Client: Aramco K.S.A.

Position: DMT Air diver

Location: (Ras Tannurah)

Job Description : Ship bottom cleaning

And clear the propellers

And wiring and cleaning refineries.

Stanted cleaned poal veaticexste.n

Scraper – hull clean for vassal Aurelia.

Cleaned u pro 10 MH

Diving Company: Aqualia B Tech and Mediterraneo Co. Job Description: Building a pier and align blocks for building a breakwater in El Alamien Elgedieda.

Installing El Alamien water station with hydraulic power of 300 m3 on daily basis.

Debris removed.

Insp.preparatuion at 18 mu.

Video recording after cleaning bowleg.

U / w visual inspection anode survey.

U / w risud inspection mea umentsat B.M. 15

Repair clamp installation tight bolts.

Ww shill camer copturestil photo 1 m. pltcstiming assistin Inspection for the neu cleitric cables.

U /w is a uninspection & bottom walk survey got 103 m/8/20 p/f.

Cover sub seleles using sand bags.

Lig penetration check.

Fixing the connection by hydraulic geen.

Photographing 2 connections.

Sinking pipe line stretch.

Sinking the six stretch 314 m.

Sinking the 2nd stretch 314 m.

Sinking the first 2 km offshore 314 m.

Installing concrete 13 locks for 130 gengo.

Taking soil symbols for the pipe line installation. Fixing connections 134 the hydraulic gun.

Fixing the intake clam per connection.

Inspecting the pipe line connection.

29 Mar. 2017 to 7

Dec.2017

10 Feb. 2017 to 15

Mar. 2017

6 Nov. 2016 to 1

Dec. 2016

1 Jan.2016 to 5

July 2016

15 Nov. 2015 to 20

Nov.2015

10 Nov 2015

9 Mar.2015 to 20

Aug 2015

Diving Company: Mediterraneo servicios marinos

Location: Hurghada Egypt.

Job Description: Fixing the 3rd connection 134 the hydraulic gun. Pha to gra phing 2 connections.

Sinking pipeline stretch 314 m.

Seubed survey.

Fixing connection 134 the hydraulic gun.

Inspecting the pipe line connection.

Diving Company: Mediterraneo servicios marinos

Location: Alamine Egypt.

Job Description: Fixing the intake chamber connection. Inspecting the pipe line connection.

Diving Company: U.M.P

Location: Khafji. O/F

Job Description: Circles seabed survey for 65 M front of P/F. Circles seabed survey for 50 M front of P/F.

Circles seabed survey for 30 M front of P/F.

Circles seabed survey for 15 M front of P/F.

Marking the P/L marked buoy at ts og P/F.

Marking the P/L at P/F.

Diving Company: U.M.P

Location: ALAML (A)

Job Description: Seabed survey alamat B D/F.

U / W marinling P/L muril calle wig marlen buoy’s. Fin up penetration for rig B P/F.

Deleting at almal a P/F.

Sea bed survey for elamal a P/F.

Video survey for bowleg.

U/W burn hole through H. piles using proco tools.

N/U R removing debris at alamal (a).

Diving Company: INW

Location: Gapletziet

Job Description: Visual inspection for star bar side. Video survey for bowleg.

Diving Company: INW

Location: Rea sea.

Job Description: Sea bed survey for jack up rigs & jack up barge. Diving Company: INW

Location: Khafji. O/F

Job Description: U/W bottom walk survey at TS-62 P/F. U/W install marker buoy’s at TS-02 8” P/L.

2012-2015

14 Dec.2011 to 25

Dec.2011

10 Nov. 2011 to 24

Nov. 2011

20 Oct.2011

U/W bottom walk survey at TS-02 P/F.

U/W bottom walk survey at TS-7a P/F.

U/W bottom walk survey at IWS-7 P/F.

U/W bottom walk survey at NR-09 P/F.

U/W bottom walk survey.

U/W bottom walk survey at TS-30 P/F.

U/W bottom walk survey marker buoy’s at TWS 7 P/F. U/W install marker buoy’s at B PL2 at given coordinator. U/W bottom walk survey at TWS-7 P/F.

U/W bottom walk survey at TWS-73 P/F.

U/W bottom walk seabed survey at TWS-7 P/F.

Seabed survey.

Debris removal.

U/W bottom leg penetration atieb check for AD 30 rig at TWS-6 P/F.

U/W bottom walk survey at TS-16 P/F.

Debris clearance.

U/W bottom leg penetration check for AD-30 rig at TWS-6 P/F. U/W bottom walk Seabed survey at given coordinator. U/W bottom walk leg penetration check for jack up rig. U/W bottom walk installing the marker buoy’s at pipe lines. U/W bottom walk survey marker buoy’s at TWS-7 P/F. U/W install marker buoy’s at 8 PL2 at given coordinator. U/W bottom walk leg penetration check for jack up rig AD-8 U/W bottom walk fixed marker 13 buoy’s at pipe line at 30 P/F. U/W bottom walk seabed survey at 73 P/F.

Working in Saudi Arabia in Khafji sector “Aramco”. Working at PETROBEL - Balaeim Petroleum Co. for Maintaining petroleum pipelines and separating, installing and changing some pipelines. Diving Company: I.M.W.

Location: Alex EL-Dekhalia Port.

Job Description: bottom walk survey inhale circle. Using L.P. Water jet.

C.P. Water jet air left.

Using jack hammer.

Assist in welding.

Diving Company: I.M.W.

Location: Seaberth24.

Job Description: Hoses configuration check at sea berth 24 for M/T. Hoses configuration check at sea berth 24 for M/T separci. Hoses configuration check at sea berth 18 for M/T. Diving Company: I.M.W.

Location: CL-23.

Job Description: Bottom survey for CL-23.

18 Oct.2011

27 Sep. 2011 to 05

Oct.2011

13 Sep. 2011 to 18

Sep 2011

15 June 2011 to 22

Aug 2011

11 May 2011 to 27

May 2011

24 April 2011

21 April 2011

15 April 2011

15 Feb.2011 to 28

Mar.2011

Diving Company: I.M.W.

Location: 113 M-3.

Job Description: Leg check for Rig GSF/24 be for e final approach to 113 M3 PL/F. Diving Company: I.M.W.

Location: Ras Ghareb.

Job Description: Removing med from posst side leg spud can tank using LP hoses. Video recording survey sand blasting for bowleg.

Sand blasting bowleg welds sohrd A/B.

Wlnys & blasting leg weld sohord SAB

Diving Company: I.M.W.

Location: Alex ELDekhalia Port.

Job Description: L.P water jet air left.

Using jack hammer.

Diving Company: I.M.W.

Location: K-O-F. Saudi Arabia.

Job Description: U/W bottom walk survey at TS-30 P/F. U/W bottom walk survey at NR 09 P/F.

U/W bottom walk survey.

U/W bottom walk survey marker buoy’s at TWS-7 P/F. U/W install marker buoy’s at 8” PL2 at given coordinator. U/W bottom walk survey at TS-73 P/F.

Diving Company: I.M.W.

Location: Alex ELDekhalia Port.

Job Description: HP water jet flang task.

Disk cutter on pipe line.

Burning oxd arc steal rops 400 mm pipe mm thick.

Assist in welding.

Diving Company: I.M.W.

Location: Ras Ghareb.

Job Description: Bottom survey.

Diving Company: I.M.W.

Location: Alex.

Job Description: Cctr video recording for M/V rudder pilgued &hell & ches2s. Diving Company: I.M.W.

Location: Red sea.

Job Description: U/W drilling.

Diving Company: I.M.W.

Location: Ras Ghareb.

Job Description: Debris removal.

Debris removed.

23 Jan. 2011 to 29

Jan. 2011

9 Jan. 2011 to 17 Jan

2011

03 Dec 2010 to 11

Dec. 2010

17 Sep. 2010 to 21

Nov.2010

12 Sep 2010

01 Aug. 2010

12 July 2010 to 21

July 2010

15 April 2010 to 25

May 2010

Diving Company: I.M.W.

Location: Ras Seadr.

Job Description: Marin growth removal by H.P. water jet. Insp. Preparation at 18 Mol.

Diving Company: I.M.W.

Location: Red sea.

Job Description: U/W drilling.

U/W cutting to remove conductor from damaged.

Diving Company: I.M.W.

Location: Abu Rudis.

Job Description: Bottom walk survey anode survey.

Bottom walk survey.

Diving Company: I.M.W.

Location: Zeit boy.

Job Description: Removing stut by ufting bags.

Seabed survey.

Assist in riser fixation.

U/ W still photograph for (lb) oil riser (u/w) clamps. Inspection for the hlu electric cables.

Hull inspection.

Sea bed survey u/w cleaning for leg welding.

Diving Company: I.M.W.

Location: Swis port.

Job Description: Repair clamp installation tight bolts. Diving Company: I.M.W.

Location: Zeit boy.

Job Description: Sea bes cleaning & clamp fixation. Diving Company: I.M.W.

Location: Swis port.

Job Description: Les penetration check.

Repair clamp installation tight blots.

Diving Company: I.M.W.

Location: Zeit boy.

Job Description: Removing steel by lifting bogs.

Sea bed survey U/W cleaning for leg welding.

Inspection for the nui electric cables.

Hull inspection.

Bottom walk survey.

U/W still photograph for (B) oil riser (u/w) clamps. 10 Mar.2010 to 01

April 2010

07 Feb. 2010 to 19

Feb. 2010

23 Jan. 2010 to 25

Jan. 2010

20 Jan. 2010 to 22

Jan. 2010

11 Jan. 2010 to 17

Jan. 2010

21 Dec. 2009 to 28

Dec.2019

04 Dec.2009

25 Nov. 2009

13 Nov. 2009 to 15

Nov. 2009

Diving Company: I.M.W.

Location: Abu Rudis.

Job Description: Bottom walk survey anode survey.

Bottom walk survey.

U/W still camar capture still photo / m.p.i testing assisting. Capture still photo

Diving Company: I.M.W.

Location: Ras Ghareb.

Job Description: U/W visual inspection on the port side leg. U/W visual inspection on the star port side leg.

U/W visual inspection on the star port side leg / sea bed. Diving Company: I.M.W.

Location: Alex.

Job Description: U/W visual inspection & Bottom walk survey at 11 M/ B / 20 P/F. Bottom walk survey in pil at w/b p/f.

Diving Company: I.M.W.

Location: Swis port.

Job Description: Repair clamp installation tight blots. Clamp support using grout bags.

Diving Company: I.M.W.

Location: Port said.

Job Description: Inspection anodes rofls no., (4). Attach morning rope to anchor pile no., (5).

Attach morning to anchor pile no., (6).

Survey on pile cheun of s.p.m.

Diving Company: I.M.W.

Location: Zeit boy.

Job Description: Leg penetration check.

Diving Company: I.M.W.

Location: Alex.

Job Description: Bottom survey.

Diving Company: I.M.W.

Location: Red sea.

Job Description: Cargo hoses checking.

Diving Company: I.M.W.

Location: Abu Rudis.

Job Description: Assist in video survey.

03 Sep. 2009 to 22

Oct.2009

25 Aug. 2009

12 Aug. 2009 to 13

Aug 2009

20 July 2009 to 06

Aug.2009

10 June 2009

1 June 2009 to 5

June 2009

02 May 2009 to 10

May 2009

11 April 2009 to 26

April 2009

Diving Company: I.M.W.

Location: Ras Ghareb.

Job Description: cleaning the spud can using water jet. Inspect preparation at 18 mgt.

Debris removal.

Defited anodes shades contimety cables cont boltsat us-os. Sea bed survey at 2 pilot lines.

Comect wive to recover dead wight.

Diving Company: I.M.W.

Location: Alex port.

Job Description: Bottom survey.

Diving Company: I.M.W.

Location: Abu Zenima.

Job Description: Bottom survey.

Cleaning the spud tank using water jet.

Diving Company: I.M.W.

Location: Zeit boy.

Job Description: Assisting m.p.i. testing.

Using sand bogs to pill between cables & seabed.

Diving Company: I.M.W.

Location: Abu Rudis.

Job Description: Cover seabed cables using cl sand bags. Diving Company: I.M.W.

Location: Alashrafy.

Job Description: Instaining plid co clamp at pil.

Checking leak press.

Diving Company: I.M.W.

Location: Alex port.

Job Description: Cutting / Lifting ((Zeus)) boat.

Cutting & Lifting ((Zeus)) m/v using electric arc. Cutting m/v ((Zeus)) using electric arc.

Cutting & Lifting m/v ((Zeus)).

Diving Company: I.M.W.

Location: Red sea.

Job Description: Marine growth removal by water jet. Brash pil surf ale using hgd brash.

Seabed execution using hgd jack hammer.

U / W Drilling.

U / W cutting to remove conductor from jameged member. Marin growth removal by lap water jet.

29 Mar. 2009

20 Mar. 2009

13 Mar.2009 to 15

Mar 2009

07 Mar.2009 to 09

Mar.2009

30 Feb 2009 to 05

Mar. 2009

21 Feb. 2009 to 28

Feb.2009

11 Feb.2009 18

Feb.2009

01 Feb.2009 to 09

Feb. 2009

20 Jan.2009 to 25

Jan. 2009

10 Jan.2009 to 11

Jan.2009

Diving Company: I.M.W.

Location: Alex.

Job Description: Bottom survey.

Diving Company: I.M.W.

Location: Red sea.

Job Description: Cargo hoses checking.

Diving Company: I.M.W.

Location: Red sea.

Job Description: Assist in video survey.

Diving Company: I.M.W.

Location: Alashrafy.

Job Description: Fixation for clamp pile.

Check leak pressure.

Diving Company: I.M.W.

Location: Eltour.

Job Description: Cover subsea cables using sand bags. Diving Company: I.M.W.

Location: Zeit boy.

Job Description: Leg penetration check.

Diving Company: I.M.W.

Location: Port said.

Job Description: Attach moring to anchor pil no 6. Survey on pile chcewn of s.p.m.

Instatction anodes rofls no. (4).

Attach moring rpe to anchor rile no (5).

Diving Company: I.M.W.

Location: Swis port.

Job Description: Repair clamp installation tight blots. Clamp support using grout bugs.

Diving Company: I.M.W.

Location: Alex.

Job Description: U/W visual inspection & Bottom walk survey at 103 M/ B / 20 P/F Bottom walk survey in ril at “wpb P/f”.

Diving Company: I.M.W.

Location: Ras Ghareb.

Job Description: U/W visual inspection on the port side leg. U/W visual inspection on the star port side leg.

19 Nov. 2008 to 09

Jan. 2009

27 Oct. 2008 to 14

Nov. 2008

22 Oct. 2008 to 25

Oct.2008

12 Oct. 2008 to 19

Oct. 2008

14 Aug. 2008 to 29

Aug.2008

13 Aug. 2008

01 Aug. 2008 to 11

Aug. 2008

21 July 2008 to 28

July 2008

13 June 2008 to 29

Aug. 2008

Diving Company: I.M.W.

Location: Abu Rudis.

Job Description: U/W still camer capture still photo / m.p.i. testing assisting. Capture still photo.

Bottom walk survey & anode survey.

Bottom walk survey.

Diving Company: I.M.W.

Location: Ras Ghareb.

Job Description: U/W visual inspection on the port side leg. U/W visual inspection on the star side leg.

U/W visual inspection on the star port side leg / sea bed. Diving Company: I.M.W.

Location: Alex.

Job Description: U/W visual inspection & Bottom walk survey at 113 M/ B / 20 P/F Bottom walk survey in pil at “wpb P/f ”.

Diving Company: I.M.W.

Location: Swis port.

Job Description: Repair clamp installation tight blots. Clamp support using grout bugs.

Diving Company: I.M.W.

Location: Eltour.

Job Description: Cover seabed cables.

Cover subsea cables using cl sand bags.

Cover subsea cables.

Cover subsea cables bags.

Cover subsea cables using sand bags.

Diving Company: I.M.W.

Location: Abu Rudis.

Job Description: Cover seabed cables using sand bags. Diving Company: I.M.W.

Location: Port said.

Job Description: Installation anodes rafls no (4). Attach maring for to anchor pil no. (5).

Attach maring for to anchor pil no. (6).

Survey on pile chawn of s.p.m.

Diving Company: I.M.W.

Location: Zeit boy.

Job Description: Leg penetration check.

Diving Company: I.M.W.

Location: Eltour.

Job Description: Cover subsea cables using sand bags. 12 April 2008 to 11

June 2008

21 Mar. 2008 to 05

April 2008

03 Jan 2008 to 18

Jan. 2008

Pervious Work

Experience:

Diving Company: I.M.W.

Location: Zeit boy.

Job Description: Assist in riser fixation.

U / W still photography for ibl oil riser (U/W) clamps. Inspection for the nev electric cables.

Cover subsea cables using sand bags.

Removing stul by ufting bags.

Sea bed survey U/W cleaning for leg welding.

Leg penetration check.

U/W still photography for oil riser.

Assist in riser fixation.

Video survey for 181 line 3

Seabed cleaning & clamp fixation.

Diving Company: I.M.W.

Location: Belaiem.

Job Description: U/W visual inspection at ilol oil riser. Video survey & thick ness gouging.

U/W visual inspection measurements at B.M.15.

Anodes survey / catholic protection survey.

U/W visual inspection cathode protection survey.

U/W visual inspection anode survey.

Diving Company: I.M.W.

Location: Damietta port.

Job Description: Video recording after cleaning bowleg. Video recording after cleaning st-bleg.

Cleaning chord (D) at bowleg using sand plasting.

Cleaning chord (A) at bowleg using sand plasting.

Cleaning chord (A) using sand plasting at port-said leg. Cleaning chord (D) using sand plasting at st-b leg. Working in Navy, diving major:

1) Building marine piers and ports for warships.

2) Align blocks for building a marine breakwater with 4 kilometer length. 3) Developing the port and lift shipwrecks from it. 4) Doing all diving works in Navy.



Contact this candidate