MARTIN RONALD F. MARIANO
CURRICULUM VITAE
PROVINCIAL ADDRESS:
Lot 9, Block 13, Mountain View Subd.
Kalunasan, Cebu City, Philippines, 6000
E-mail Ad: **********@*****.***
Mobile# +639*********
CITY ADDRESS:
523-A Manuel L. Quezon St., Barangay Bagumbayan
Taguig City, Metro Manila
E-mail Ad: **********@*****.***
Mobile# +639*********
PERSONAL PARTICULARS:
Sex : Male
Status : Married
Nationality : Filipino
Dependents : 2
Date and Place of Birth : November 12, 1960/ Metro Manila, Philippines
Passport No. /Date of Expiry : P6947711A/APRIL 25, 2028
SSS ID NO. : 06-0852454-8
TIN ID NO. : 102-592-093
Phil. Health ID No. : 19-0888159241-3
HDMF ID No. : 076*********
EDUCATION:
Primary : Saint Paul College of Manila/ Metro Manila, Philippines (1966-1967)
Elementary : University of San Carlos for Boys/ Metro Cebu, Philippines (1967-1973)
Secondary : Saint Louis School of Mandaue/ Metro Cebu, Philippines (1973-1977)
College Degree : Bachelor of Science in Mechanical Engineering
University of San Jose-Recoletos/Metro Cebu, Philippines (1977-1982)
SKILLS:
1.PC Knowledge: Word, Excel and Outlook
2.Plastic Injection Machine (Operation/Maintenance/Installation & other components).
3.Could manage in Marine Engineering, MachineShop, and Ship Breaking & Ship Building Process & Fabrications and could even manage 25-50 personnel.
4.Could Manage & set up production planning & schedule Outdoor, Indoor High End Furniture In-Process & Wrought Iron Furniture’s. Also could train QA/QC personnel & set up quality standard.
5.Knowledgeable in doing negotiation with clients and buyers in terms in getting new contract, job order or purchase order. Also, this includes product development, shipment or shipping documents and other pertinent documents that may require.
6.Could undergo pressure with less supervision, manageable in different operations as a manager, could communicate fluent with clients/buyers and team minded person.
7.Could manage personnel 50 – 100 workers which includes setting up the production line equipments/machineries and even the management set up.
8.Language: Can write & speak fluent English, and speak Nipponggo & Bahasa Indonesia.
Dialects: Tagalog, Cebuano & Ilonggo
TRAINING AND SEMINARS ATTENDED:
1. Plastic Injection Molding and Metal Bending Production Process in Fukaya City, Saitama, Japan
2. Plastic Injection Machine and Robotic Maintenance & Trouble Shooting Repair in Fukaya City,
Saitama, Japan
3. Seminar in Safety, Housekeeping and Material Planning in Cebu City, Phil.
4. Product Familiarization, Orientation and Standard requirements for Century Furniture products in
North Carolina, USA
5. Product Familiarization, Orientation and Standard requirements for Platt Collection products in
LA, California, USA
6. Laboratory Testing and Finishing Seminar for William Sonoma Products in New Delhi, India
REFERENCE:
1.Mr. Thelma Gulle (Marketing Manager/Coast Pacific Manufacturing, Inc.)Mobile # +639*********
2.Mr. Walter C. Lucero (FFE QA Manager/8 Space Asia) Mobile# +639*********
3.Ms. Michelle Araujo (Project Manager/Cairncross Martin Phil., Inc.)Mobile# +639*********
4.Arch. Jason Andrada (Project Manager/ RS CARSON Gen. Construction Corp.) Mobile #091********
5.Mr. Romero Labares (QC Head/RS CARSON Gen. Construction Corp.) Mobile# 093********
WORK EXPERIENCE:
1.Position Held : FACTORY MANAGER / PROJECT MANAGER
Date : October 21, 2019 – August 30, 2020
Company : Premiere Alliance Property Construction Corp.
Location : Ibo, Lapu-lapu City, Cebu
Job Nature:
Assigned in Manila Project Construction site works and Factory.
It is my sole responsibility in handling all 150 personnel, sub-contractor in-house and job out contractors.
I am responsible in the setting up of the New Factory for the fabrication of loose furniture requirements for the construction site which includes machine set up and factory process flow and procedures.
Over-all responsible for training of staff and factory workers on production process, quality management and material planning.
It is my sole responsibility in doing the Production Schedule and Planning which includes coordination with Project Managers in site for delivery schedules.
Doing some responsibility as Project Manager.
REASON FOR LEAVING: Factory was closed due to PANDEMIC.
2.Position Held : QUALITY ASSURANCE & QUALITY CONTROL MANAGER
Date : March 15, 2019 – August 31, 2019
Company : BASANT FURNITURE
Location : Khasa No. 129/131, Bhandu Kalla, Bhandu, Jodhpur, India
Job Nature:
Over-all In-charge of the Blue File Room, Laboratory Testing Room, Color Laboratory and the whole operations in the Quality Assurance and Engineering aspect of the company.
I am responsible in the setting up of the Quality Process Control of the factory for each Hall and department which includes the Incoming Raw Material.
Setting up of the Step Panel System in the Finishing Cart Line check points.
Meeting up with 3rd Party Quality Control Inspector.
I am responsible for the setting up of the QC Inspector Daily Activity Report including checklist in the Incoming Raw Material.
I am responsible in the revision of the engineering construction and packaging.
Implemented the Weekly and Monthly report for the Defect points in every department and implementing the CORRECT ACTION AND PREVENTIVE ACTION on every defects.
Implemented the Departmental Performance base on efficiency base on defects accomplishment.
REASON FOR LEAVING: Salary and Compensation was not given base on the Agreement prior to departure.
3.Position Held : PLANT MANAGER/CONSULTANT
Date : March 01, 2018 – March 15, 2019
Company : Coast Pacific Manufacturing Corp.
Location : Coast Pacific Drive, Banilad, Cebu City, Cebu, Phil.
Job Nature:
Recalled by the owner due to back log orders and quality issues.
It is my sole responsibility in handling all 70 personnel, sub-contractor in-house and job out contractors.
It is my sole responsibility in running the production manufacturing in the factory which includes Manpower requirements, Material Purchasing, Outsourcing, Quality Standards, Packing, Maintenance and Production Schedule & Planning (PPIC).
I am directly reporting to the owner and communicating to the buyer in the USA/LOCAL for the update of orders.
To make sure that the labor cost and material cost is well controlled to make sure the profit being set by the management is maintained or more than being required.
Responsible in Product Development and Engineering construction.
Warehousing and Material Incoming is my full responsibility.
I am the Over-all In-charge in the Job out sub-contractor such as the Stone Cast, Wrought Iron works, Fiberglass; leather Inlay, Shell Inlay & wood furniture. I am the Over-all In-charge in the issuance of Job Order, price negotiation, schedule of deliveries and quality standards implementation.
I am the Over-all In-charge in Issuance of Piece Contract to Sub-contractor, Production Cost and Material Consumption & Budgeting.
It is my sole responsibility in monitoring and communicating the update of the project, correct specifications and quality of the clients/ buyer’s project.
REASON FOR LEAVING: To set up the correct production flow, system and to train personnel such as Production Manager, QC Supervisor and Product Engineer. (1 year consultancy project with the owner)
4.Position Held : OPERATIONS & QUALITY ASSURANCE DIRECTOR (CONSULTANT)
Date : January 01, 2015 – March 15, 2019
Company : Viktorian Luxquiste Furniture
Location : Blk. 13, Lot 9, Mountainview Subd., Kalunasan, Cebu City, Phils.
Job Nature:
It is my sole responsibility in out sourcing of sub-contractors or vendors as required by the client, designers and buyers; Negotiating the price cost and project cost between vendors and buyers.
It is my sole responsibility on the operations of projects to the project site, hiring of manpower, product development and Logistics operations.
It is my sole responsibility in monitoring and communicating the update of the project, correct specifications and quality of the clients/ buyer’s project.
To make sure that no delays on the accomplishment of buyers/clients project and even include in assisting vendors on how to lessen the no. of days to meet the deadline.
Doing a product development monitoring prior to approval and implementation to project sites.
Doing 3rd Party Quality Services local or Buyers.
REASON FOR LEAVING: Still Connected and doing Outsourcing projects (Family Business).
5.Position Held : PRODUCTION MANAGER/PROJECT MANAGER
Date : JULY 12, 2016 –March 01, 2018
Company : RS CARSON GENERAL CONSTRUCTION CORP.
Location : Franco Drive, Manalac Industrial Estate, Bagumbayan, Taguig City, Phil.
Job Nature:
It is my sole responsibility in handling all 212 personnel, sub-contractor in-house and job out contractor.
I am the Over-all In-charge in Production Planning & Scheduling, Issuance of Piece Contract to Sub-contractor, Production Cost and Material Consumption & Budgeting.
It is my sole responsibility in monitoring the Project Site requirements which includes the required items to be installed and no. of manpower requirement for site service.
It is my sole responsibility to review items and products prior to production process.
I have change the finishing system to make sure that finishing issues of adherence would not reoccur when installed to site.
Sole responsibility in trouble shooting items being left out by sub-contractor or take over projects.
REASON FOR LEAVING: I was recalled by previous employer in Cebu (Coast Pacific Manufacturing).
6.Position Held : PLANT MANAGER
Date : August 01, 2013 – June 30, 2016
Company : Coast Pacific Manufacturing Corp.
Location : Coast Pacific Drive, Banilad, Cebu City, Phil.
Job Nature:
It is my sole responsibility in handling all 70 personnel, sub-contractor in-house and job out contractors.
It is my sole responsibility in running the production manufacturing in the factory which includes Manpower requirements, Material Purchasing, Outsourcing, Quality Standards, Packing, Maintenance and Production Schedule & Planning (PPIC).
I am directly reporting to the owner and communicating to the buyer in the USA/LOCAL for the update of orders.
To make sure that the labor cost and material cost is well controlled to make sure the profit being set by the management is maintained or more than being required.
Responsible in Product Development and Engineering construction.
Warehousing and Material Incoming is my full responsibility.
I am the Over-all In-charge in the Job out sub-contractor such as the Stone Cast, Wrought Iron works, Fiberglass; leather Inlay, Shell Inlay & wood furniture. I am the Over-all In-charge in the issuance of Job Order, price negotiation, schedule of deliveries and quality standards implementation.
REASON FOR LEAVING: Career Advancement since it is another challenge in construction business.
7.Position Held : PRODUCTION MANAGER
Date : May 10, 2012–July 30, 2013
Company : Estetika Home Accessories, Inc.
Location : H. Abellana St., Pagsabungan, Mandaue City, Phils.
Job Nature:
It is my sole responsibility in running the production manufacturing in the factory which includes Manpower requirements, Material Purchasing, Outsourcing, Quality Standards, Packing, Maintenance and Production Schedule & Planning (PPIC). Also, includes Logistics such as shipment, preparing documents and coordinating with shipping booking agent.
I am directly reporting to the owner and communicating to the buyer in the USA for the update of orders.
Doing payroll for the Job out and In-house contractors.
To make sure that the labor cost and material cost is well controlled to make sure the profit being set by the management is maintained or more than being required.
Purchase Order was improved from 3 months processing for 1 x20 Container full loads to 1 month processing increasing the loadability using same personnel and equipments. The Importation of some imported materials was reduced due to outsourcing available locally without sacrificing the quality standards.
Handling 5 daily workers and 6 Job out contractors.
REASON FOR LEAVING: Career Advancement.
8.Position Held : QA Manager/ ASST. PLANT MANAGER
Date : October 15, 2010 to April 30, 2012
Company : Tala Cebu Furniture Manufacturing, Inc. (Hotel Project)
Location : Mandaue City, Cebu, Philippines
Job Nature:
Made some improvement and changes in the operations and processing in the Veneering Department since this is the bottle neck of the factory processing which include the labor cost & material usage and cost per PO.
I have implemented some changes in improving the manufacturing flow in the Finishing Dept., Packing Dept. Product Development Dept. and Wood working Dept. which we had improved our shipment deliveries,
Material cost & Labor cost had been lowered and Container shipment from 2 Containers per week to 6-8 containers. I have trained Quality Inspectors taken from production line to do monitoring on quality standards per production process to eliminate delays, material wastage and to maximize the man hour output to maintain the container output of 6-8 (1 x40 full Container load).
Trained and set-up QA Dept. which includes in the setting up Quality Assurance standard and check list.
Handling the Finishing Dept. to improve its process flow and quality.
Assisting the Plant Manager in the process flow and container delivery.
Manpower of 150 personnel.
REASON FOR LEAVING: End of Project since employment is Project Based.
9.Position Held : Quality Control Manager/HDM Account
Date : April 16, 2008 – November 06, 2009
Company : Furniture Brands – Philippines/FBN Asia (Distributor/Retailer/Buyer)/
TOBAMA Corporation (Registered name in the Phils.)
Location : Main – North Carolina, USA; Branch – Mandaue, Cebu, Phils.
Job Nature:
I am the Over-all In-charge in supervising & training of QA Inspectors for all FBNproducts.
I am the Over-all In-charge in reviewing & evaluating the product sample such as product engineering, finishes and packing.
I am the Over-all In-charge in sending Quality Call outs, issues and other documents in regards of product assurance and quality standard implementations.
Sole responsibility in doing the testing of items such drop test, material test, lacquer test, packaging test and other testing being done in FBIS.
I am the Over-all In-charge in monitoring of all orders especially in delivery schedules, documentations &communications. I am responsible in setting Quality Program, Process Flow Chart & Check listand to cover & check items inManila & Cebu (Phils.), China, Indonesia, & USA.
Responsible in doing a QA Manual for all FBN products being inspected here in the Philippines.
Doing QA inspections in Manila, Taytay and Pampanga vendors.
Handling 12 Quality Assurance personnel.
REASON FOR LEAVING: Philippine office was closed due to Global Crisis in the US.
10.Position Held : Quality Assurance Manager
Date : March 15, 2004 – April 15, 2008
Company : Furniture Brand Import Services/Outlook International, Ltd.
(Exclusive Furniture Agent Representative)
Location : Mandaue City, Cebu, Phils.
Job Nature:
To provide service and product support for all vendors in the Phil. To assist the Foreign consultant in Technical aspects and process.I am the Over-all In-charge in quality standard implementation, new quality standard procedures, Pre-production review, Sample Review, monitoring of PO’s in different stages of the in-process and recruitment & training of QA Inspector.In-charge in approving a first run color finishes and pilot run finish of factories as base on the approved finish by the clients.Involve in discussion and trouble shooting of quality issues occurring in customer complain with the vendor.Supporting the Product Development and Laboratory testing of items which includes finishes, construction and even the design. Also, coordinate with the buyer in terms of technical & status monitoring.2 weeks training and orientation in FBIS China Laboratory on the different furniture testing.
Handling 15 QA Inspectors.
REASON FOR LEAVING: I was transferred to FBN since FBIS contract had expired.
11.Position Held : Overall Admin. Officer (Cebu Office)/Technical Services Manager)
Date : April 09, 1999 – March 01, 2004
Company : Casa Pacifica, Inc. (Buyer Representative Agent)
Location : Cebu City, Cebu, Phils.
Job Nature:
I am the Over-all In-charge in Cebu Operations.
I am the Over-all In charge in product development, outsourcing of vendors in the Phil., trouble shooting in different quality issues occurred in the delivery of items to buyers which sometimes had to go to the States (Los Angeles & North Carolina).
I amresponsible in communicating directly to the buyers regarding, product development, product approval, quality issues which is not included in the quality standards as set up.
I am responsible in accompanying the buyer in different factories where items beingmanufactured. I have to make a yearly consultation visit with the US Buyers factories in the USA to improve product quality standards.I am helping out our buyer in training and to set up of new QA personnel in China factories. Negotiating the price cost with vendors based on buyers required price cost.
Handling 24 QC Inspectors and 6 Office Staff.
REASON FOR LEAVING: Career Advancement
12.Position Held : Production Manager
Date : August 16, 1993 – April 01, 1999
Company : Bruce Fossilstones International Corp. (Furniture Manufacturer)
Location : Cebu City, Cebu, Phils.
Job Nature:
I am the Over-allIn-charge in the Job out sub-contractor such as the Stone Cast, Wrought Iron works, Fiberglass; leather Inlay, Shell Inlay & wood furniture. I am the Over-allIn-charge in the issuance of Job Order, price negotiation, schedule of deliveries and quality standards implementation.
I had improved the production output from $250,000 to $500,000 worth of shipment in which the management had decided to be relocated to new factory site due to decongestion of production layout.
Had made a new production lay out in the new factory to have a higher production shipment and delivery.
Handling 50 daily workers and 30 job out sub-contractors.
REASON FOR LEAVING: Plant was relocated to Tungcop, Minglanila a 2 hrs. Drive
13.Position Held : Injection Department Manager
Date : January 28, 1990 – August 15, 1993
Company : Philippine Tonan Corporation (Kitchen System & Metal Furniture)
Location : MEPZ, Lapu-lapu, Cebu, Phils.
Job Nature:
I am the Over-all In-charge in the plastic injection operation such as In-process, Schedule, Maintenance, training of personnel, QA standards and applications.I have to do an Annual training in Japan for machine maintenance, trouble shooting and processing updating in which we do not have any Japanese Technician in my department.I am one of the pioneering in the core group of Management staff and the new product development consultant in the business of metal furniture process.I am responsible in approving the new item being develop in the product development prior to wrought iron furniture process. I was trained in Japan for different manufacturing processes especially in stainless material for kitchen equipment such as kitchen sink using NC Punching, Hydraulic Power Press, Bending Machine and Spot welding machine.
Handling 60 personnel working in a 24 hours operation.
REASON FOR LEAVING: Change of Management & was hired as Production Manager.
14.Position Held : Woodworking & Carpentry Supervisor
Date : December 2, 1987 – January 15, 1990
Company : Pacific Traders and Manufacturing Corp. (Furniture Manufacturer)
Location : Mandaue City, Cebu, Phils.
Job Nature:
I am the Over-all In-charge in woodworking and carpentry in-process. Also, In-charge in Planning & Production schedule, issuing Job Order to the In-house Contractor and Job-out Contractor which includes approving the percentage accomplishment of In-house and Jo-out Sub-contractors for payroll. I was trained as Management Trainee prior to Supervisory position for 3 months in the production process for trouble shooting and to make report to the Operation Manager on different changes to be implemented.3 months assigned to the R&D department for Full size drawing, line sketch, jig making & pattern and construction details.
Handling 30 daily workers and 10 sub-contractors.
REASON FOR LEAVING: Career Advancement due to Department Manager Position.
15.Position Held : Team Leader/Staff Engineer, Machine Shop Supervisor,
& Project Engineer
Date : November 12, 1982 – November 30, 1987
Company : Filipinas Fabricators and Sales Inc. (Eng’g. works & Fabrications)
Location : Loyola Heights, Quezon City, Phils.
Job Nature:
For 2 yrs. as a Project Engineer in Metal & Structural Fabrication and Diesel Engine Repairs in Manila main office where I am handling 12 personnel.
For 2 yrs. as Team leader in repair and fabrication of Marine and Stationary Diesel Engine. Also, I am the Team Leader in Overhauling, planning & scheduling and trouble shooting. I had undergone 6 mos. Apprenticeship and 1 yr & 6 mos. as Staff Engineer prior to promotion as Team Leader where I am handling 6-8 personnel
REASON FOR LEAVING: Company was closed due to government projects and it was People Power Revolution.
MARTIN RONALD F. MARIANO