PATRICK PACETE PALAGANAS
Hamdan St., Abu Dhabi, UAE
Mobile # +971********* / +971********* (UAE)
E-mail:*******.***********@*****.***
DETAILS OF WORKING EXPERIENCED:
Project Engineer (Lindner Group) (UAE pavilion Museum) June 2019-Present
Client: Department of Culture and Tourism (80M AED project cost)
Site supervision for the roof and façade contractor on the UAE pavilion project
Check the variation, Present quotation for the different vendor and site implementation
Site coordination meeting with other trades (MEP, Civil, Planning.), Progress meeting with clients
Review design and schedule of program, evaluate subcontractor progress billing.
Civil Site Engineer (Expolink Route 2020 Dubai Metro) (Alstom Gulermak And Acciona) EPCM (February 2018-June 2019)
Client: Roads And Transportation Authority RTA (10.6Billion AED project cost)
Site Supervision for the Jebel Ali Metro Depot Building Enhancement
Supervising the works of subcontractor for civil, steel structures and facade cladding works.
Conduct weekly meeting for the site progress, designs status, quality and status of submittals.
Monitor the progress, quality of works of the contractors, Health, safety and environment compliance.
Supervise and Monitor the construction per contract duration and budget allocated in each item.
Checks the variations and new proposals of the sub-contractor.
coordination with the QA/QC, Parsons Systra Engineers and RTA for inspection and progress.
Conduct factory visit for the subcontractor materials supply
Review and approved Monthly Progress Payment of subcontractor
Site coordination for both MEP and rail system to civil works activity
Section Engineer (Emirates Global Aluminum) Al Taweelah Aluminum Plant (EPCM Bechtel Petrofac Joint Venture)
Power and Steam Integration Project (EPCM HATCH)
Nass Contracting Corporation (April 2016 -February2018)
Permit To Work Receiving Authority both brownfield and greenfield
Site Supervision and Management of Infrastructure project in EMAL
Monitoring Rebar, Shutter installation and Concreting of Pile Cap for Tank, conveyor support and equipment foundations and pedestals,
Waterproofing works on pile cap Raft slabs, Foundations prior to backfilling
Foundation excavation, compaction and ground improvement prior to blinding.
Concrete to Foundations, Grade Slabs, Footings, Foundations including pedestals with anchor bolts, embedded plates, Angles and Sump
Open Tunnel works rebar shuttering and concreting works.
Handing over and closing out punch list for the next contractor the steel structure
Site Engineer (Mohamad Bin Rashid Al Maktoum City) District One
Meydan-Sobha Construction LLC (2.5Billion US dollor project cost)
April 2015 – April 2016
• Site Supervision and management of blockworks, plastering, fit-out, painting, tiles and erection of steel structure also fireproofing, Shuttering works and installation of precast walls. Villas project
• Concreting engineer, monitoring posttension slabs as per drawing and QA/QC Engineer
• Façade stick wall and stone cladding engineer
• In Charge on Manpower Monitoring and Deployment of Workers and Subcontractor
• Assisting seniors project engineer and construction manager for shop drawings, planning and construction documentations.
• In-charge of evaluation of billings and accomplishments of sub-trades, daily manpower reports
• In charge of land development (excavation and hauling – out), external and landscaping
• Monitors Quality works thru Work Inspection Request. Handover area for other sub trades MEP
• In-charge on materials, tools and equipment requisition and monitoring
• Work with safety condition of site, conduct toolbox talk
Site Engineer (Midfield Terminal Building) Abu Dhabi Airport Company ADAC
Arabtec Construction LLC (Joint Venture of Consolidated Contractors Company and TAV Construction)
May 2013 – April 2015 (10.8Billion AED project cost)
• Site Supervision of Steel structure for fit-up, welding and erection also fireproofing, Shuttering works and installation of precast walls and all civil works in Airport project
• Concreting engineer and Steel Structure Engineer
• Rebar engineer cutting list on steel and all civil works, raft slabs, retaining walls and beam and slabs
• In Charge on Manpower Monitoring and Deployment of Workers
• Assisting seniors project engineer for shop drawings, and construction documentations.
• In-charge of evaluation of billings and accomplishments of sub-trades, daily manpower reports.
• In charge of land development (excavation and hauling – out) and external works.
• Monitors Quality works thru Work Inspection Request. Handover area and NDT and bolting inspection
• In-charge on materials, tools and equipment requisition and monitoring
Site Engineer / QC Engineer Habtoor Leighton Group
Arzanah medical Complex Abu Dhabi UAE Health Care project Hospital and Clinic
(September 2010-March 2013) Client: Mubadala (700Million aed)
Monitors subcontractors on Scaffoldings for the safe platforms to be used
Monitoring the Fascade subcontractor working on Glass and Aluminum
Daily Manpower Allocation Sheet Reports and Production Reports.
Supervise Formworks, Steel works and concreting works using Tabla system on beams and slabs, Columns and Shearwalls structural and architectural works.
Supervise Masonry works and Carpentry works in Finishings and waterproofing
Work as a Production Engineer using the Contract System during structural works
Works as QC office documentations for Inspection Request, Handovers, MEP clearances Coordination and snagging reports.
Notify the RE and/or senior management when an event occurs that has been previously identified as requiring notification.
Review quality of workmanship, identify problems and facilitate corrections.
Conduct initial/internal inspection for snagging architectural works.
Conduct safety Job Safety and environment Assessment (Risk Assessment) each specific works description in different areas.
Civil Supervisor Al Habtoor Leighton Engineering
Dusit Thani Hotel, Residential and Commercial Complex Abu Dhabi UAE
(June 2008-September 2010) (1.20 Billion aed)
Daily Manpower Allocation Sheet Reports and Production Reports
Daily Total Manpower Report and Manpower Distribution Reports
Assist Logistics Department on the Inventory of Materials at stockyard
Coordinates and check materials Delivered on site
Materials Hauling and Supply to site
Scaffolding supervision on Core walls, Slabs and Stairs Access for Safety.
Following safety guidelines in site 278
Supervise Formworks Fabrication and Installation of Doka for Walls and Table Forms for Slabs
Steel Rebar Fabrication and Installation supervisions.
Formworks/Concreting Engineer Makati Development Corporation (MDC)
The Columns at Legazpi Village General Contractor (Manila, Philippines)
(2008-June 2008)
The columns is a two towers of 43 storey each building with a 7th storey Parking.
JOB DESCRIPTION:
Takes charge of proper installation and dismantling of formworks prior to concreting;
Coordinates and implements with the different subcontractors the proper execution of works.
Assists in concreting works;
Ensures proper stock filling and safekeeping of formworks;
Ensures the implementation of the quality plans and objectives of the department and project assignment.
Site Supervision of rebars, formworks of Beams and Slabs, columns and shearwalls, Stairs and Reinforce concrete wall.
Site Inspection and monitoring of Precast Installation.
Weekly scheduling of concrete pouring look ahead and Weekly Productivity reports
Site Engineer New Golden City Builders & Development Corp.
(SM Mezza Residence) General Contractor (Manila, Philippines)
(2006-2008) Client: SM Development Corporation (1.0Billion php)
The Mezza Residence is a four Towers of 42 storey each building with a five storey high common podiums built on a 13,000m2 land area. Total Gross Floor Area is 130,779 m2. The Structural System of the Building Based on the Architectural and Structural Drawing provided is combination of RC shearwall and Moment Frame System. The Foundation has a combination of Bored Piling and Mat Footing.
JOB DESCRIPTION:
Site Supervision and equipment requisition and monitoring Site Supervision of rebar, formworks conventional and table forms and installation of precast parapet, drop wall and stairs.
Concreting engineer
Rebar cutting list on Beams and Girders
In Charge on Manpower Monitoring and Deployment of Workers
Assisting seniors project engineer for shop drawings, memorandum and letters, and construction documentations.
In-charge of evaluation of billings and accomplishments of sub-trades, daily manpower reports.
In charge of land development (excavation and hauling – out).
Preparing Daily and Weekly report with total accomplishment for the week.
In-charge on materials, tools.
TECHNICAL ASSISTANT Techno-Trade Resources (DAVAO) Inc.
Manila, Philippines (Manufacturing of Thermoplastic Roofing, PE and Blue Pipes,
(Manufacturing Industry) Sanitary Pipes, Conduit and Flexible Electrical Conduits, and PVC Fittings) (2005-2006)
JOB DESCRIPTION:
Preparing materials and cost estimates for Roofing materials including installation, Freight and Delivery charges, work as a Quantity surveyor, and Quality Control Engineer.
Conduct Actual Measurement at Site and visitation of finish projects for quality assurance.
Preparing Cutting List for Production includes roofing accessories and hardware materials
Requesting Work Order and Cash Advance for Projects.
Preparing Progress Report and Billings.
Coordinating with the Installer the details and scope of works of the project
EDUCATIONAL BACKGROUND
COLLEGE
Name of School: Adamson University (1999-2004)
Address : 900 San Marcelino St. Ermita, Manila Philippines
Course : Bachelor of Science in Civil Engineering
QUALIFICATIONS:
Computer literate (proficient in windows Microsoft Office and Internet Explorer), Basic Autocad,
Wrench, Snagging Management System HLG, Aconex basic, Dashboard, FDCT
Able to work with minimum supervision
Has ability to make independent decisions
Able to communicate in English
Fast learner
SEMINARS/ TRAINING ATTENDED:
Construction Management Career Orientation Seminar
OZ Audio Visual Room, OZ Bldg. Adamson University
November 17, 2003
Association of Concrete and Asphalt Producers of the Philippines Foundation Inc.
OZ Audio Visual Room, OZ Bldg. Adamson University
November 17, 2003
Time Management Seminar
OZ Conference Room, OZ Bldg. Adamson University
October 15, 2004
Hilti Tool Operator Training (DD-EC 1 Diamond Drilling)
The Columns @ Legaspi Village (Makati Development Corporation)
February 05, 2008
Introductory Award in Health and Safety (British Safety Council)
Site 278 Conference Site Conference Room (Al Habtoor Leighton Engineering Abu Dhabi)
August 14, 2008
Scaffolding Training (Mirdif Security & Safety Consultants)
Site 278 Conference Site Conference Room (Al Habtoor Leighton Engineering Abu Dhabi)
September 4, 2008
First Aid Training (Mirdif Security & Safety Consultants)
Al Quoz Camp 1 Training Room (Al Habtoor Leighton Engineering Dubai)
February 9, 2009
Supervisor Behavior Training (The Renior Group)
Site 278 Site Conference Room (Al Habtoor Leighton Engineering Abu Dhabi)
March 20, 2009
Heat Stress Training (Al Habtoor Training School)
Site 278 Safety Training Room (Al Habtoor Leighton Engineering Abu Dhabi)
July 11, 2009
Risk Assestment Level 2 (British Safety Council)
Site 278 Conference Site Conference Room (Al Habtoor Leighton Engineering Abu Dhabi)
September 24, 2009
Supervisor Management (Al Habtoor Production Department)
Site 280 Arzanah Medical Complex (Al Habtoor Leighton Engineering Abu Dhabi)
March 24, 2011
IOSH Managing Safely Training
Habtoor Leighton Group – CETA in Al Qouz Dubai
December 10-14, 2011 (Covers Risk assessment, COSHH, Confined Space, Excavation, Equipment, Fire hazards and Working at Height
Estidama Training & Workshops delivered by UPC Estidama introduction
Midfield Terminal complex (TAV CCC Arabtec JV Conference room)
November 3, 2013
Heat Stress Awareness Training
Midfield Terminal complex (TAV CCC Arabtec JV Conference room)
June 16, 2014
Rigging & Slinging, Lifting Procedure Risk Assessment for Lifting Supervisors
TUV SUD Middle East LLC, Meydan District 1 Project
April 2, 2015
Receiving Authority of Permit to Work System in Both Greenfield and Brownfield Area in Emirates Aluminum Plant (Emirates Global Aluminum and Hatch EPCM)
August 15, 2018
Serco Trained Line Side Person In Charge (LPIC)
Al Quasais Metro Depot.
February 27-28, 2018
Field Data Collection Tool (FDCT)
Initiator Inspection Test Request
DIP, Arenco Office Bldg. 3, Office 511 Dubai, UAE
September 17, 2018
Lifting Supervisor
Safe World Specialists
UAE pavilion Site Al Manarat Al Sadiyat Abu Dhabi
June 29, 2019
Primavera P6 18.8
Regional Educational Institute
Abu Dhabi UAE
July 5, 2020
PERSONAL INFORMATION:
BIRTHDAY : October 14, 1982
AGE : 38
BIRTHPLACE : Manila
SEX : Male
NATIONALITY : Filipino
CIVIL STATUS : Married
RELIGION : Roman Catholic