MIDDLE MANAGEMENT PROFESSIONAL: OPERATION/COMMISSIONING

PROFILE SUMMARY

A result-oriented professional with experience of 10+ years in Operations, Documentation and commissioning.

Currently associated with ACB INDIA LIMITED As a Asst.Manager 2x135MW (Operation) which have thermal Power Generating unit.

Adept at ensuring cost parameters as well as effective resource utilisation, exposure in administering overall plant operation.

An effective communicator with good coordination & problem solving skills.

ORGANISATIONAL EXPERIENCE

Current Employer

Present time working in ACB INDIA LIMITED as an Asst.Manager from November 2015.

Key Result Areas:

Operation/Commissioning/Middle Management

Well experience of operation of 2x135, 1x300, 1x63 and 3x130 MW units.

Knowledge & ability for safe, reliable and efficient operation of units (BTG & Offsite) by quick decision making & appropriate actions.

Responsible for smooth Start-up and Shutdown of Unit (Boiler/Turbine & Other auxiliaries) whenever required and for giving proper instructions & guidance to Subordinates of various areas such as Boiler, Turbine, ESP, Ash plant & Coal Handling Plant, Vacuum system (ACC & water cooled).

Commissioning of Boiler, Turbine lubes oil system and auxiliaries etc.

Ensure healthiness of all equipment of BTG Unit & Offsite and rising of defect notifications for any defects to the concerned maintenance departments and coordinate for its rectification.

To prepare the plant performance report for the shift/day during the shift operation.

Ensure proper logging of all critical parameters is being done at all locations by respective operators and engineers.

Responsible to preparing an annual budget, analyzing variances & initiating corrective actions.

Monitors and maintain process equipment to ensure continuous production.

Adherence review and tracking of long term maintenance planning.

Responsible for performed Job work order and support Engineer in SOP writing.

Interacts with management, engineers and quality assurance to resolve complex failure trends.

Responsible for budget preparation for function and tracking the expenses on monthly basis.

As a Management Team Member

Prepare daily generation report, fuel management report, water management report& fault analysis report if required, yearly plant budget report, defect management.

Successfully Conducted Energy audit in power plant. Recommends plant modifications as needed.

Coordination with every dept. to ensure full achievement in PLF & Plant Equipment availability on time.

Prepares daily and monthly reports of power plant operation, power usage, and costs.

Make necessary decisions for smooth operation of the plant.

Ensure that Safety Procedures are carried out at all times on all areas in the power plant premises Safety Health Environment (SHE).

Ensure in implementing of company policies, SOPs, safety procedures, good housekeeping.

Achieving maximum efficiency of the plant, ensuring smooth start-up & shutdown of emergency conditions in plant, ensuring proper management of Ash Handling System.

Previous Employer

1.) Since October2010: Bhushan Power & Steel Ltd., Sambalpur, Odisha

Power Plant (3x 130MW Operations)

Key Result Areas:

Operation

Involved in Commissioning activities like Pre commissioning checks, Hydro test, Refractory dry out, Chemical boil-out &Steam blowing of 210tph cfbc boiler (IJT make) and 390tph cfbc boiler (ThyssenKrupp).

Well experience of operation through D.C.S. (EMERSON) system, 3x130MW units which have three TG sets (130 MW each) provided by SIEMENS.

2.) Since January 2009: Sarth Engineering And Construction Pvt. Ltd.

Engineer - Power Plant (Project)

Key Result Areas:

Project

Supervision of erection and fabrication of Boiler structure, 2x250 MW U.P. Government Power Project at Aligarh site.

EDUCATION

Diploma in Mechanical Engineering in 2008

Sardar Vallabh Bhai Government Polytechnic College, Bhopal (Autonomous)

Affiliated from R.G.P.V. (Rajiv Gandhi Proudyogiki Vishwavidyalaya), Bhopal

Certification:

Diploma in Mechanical CAD (AUTO CAD, PRO/E and CATIA) from cadd centre Bhopal.

INDUSTRIAL TRAININGS

Title: Mechanical Activities and Thermal power plant

Duration: 15 days

Organization: ACC Ltd. Kymore, Katni District (M.P.)

Key Learning: Operations

PERSONAL DETAILS

Date of Birth: 15th May, 1987

Address: Q. No.-A/ 404, ACB INDIA LIMITED Township, Batari, Tiwarta, Korb (C.G)

Permanent Address: Village & Post: Taleya, City: Daltongunj, District: Palamu (Jharkhand)

Marital Status: Married

Nationality: Indian

Languages Known: Hindi & English

D E C L A R A T I O N

I hereby declare that all the statements given in the application are true and correct to the best of my knowledge and belief. I promise to submit the originals if necessary.

Date:

Place: (ROSHAN KUMAR DUBEY)



Contact this candidate