SRINIVASARAO.ALLU
E-mail: *******@*****.***
Nationality: Singaporean
SYNOPSIS
A result-oriented Electrical & Instrumentation engineer with over 20 Years of experience in Marin & Oil and Gas construction sector currently working with as Lead Electrical & Instrumentation Engineer (Construction) for FPSO PROJECT and looking forward to accept a new role in Marine & Offshore Ship building, Ship conversion, Ship Repair & FPSO Topside Module Construction as E&I Construction Engineer. Having hands work experience on installation, inspection, commissioning & trouble shooting of on-board electrical & Instrumentation systems shall be at par advantage of my career till date. My core competencies & job profile is briefly listed below for your consideration. International standard IEC, IEEE, NEC and ABS Rules and DNV (MODU, FPSO & Steel Vessel).
KEY SKILLS
Category
Subcategory
Ability
Experience
Engineering
Construction (Marine/topside)
Experienced
18 years
Engineering
Commissioning (+ Pre-)
Experienced
18 years
Engineering
Electrical/Instrument Controls
Experienced
18 years
Engineering
QA/QC/wastewater
Experienced
07 years
KEY ACHIEVEMENTS:
Highly skilled in network planning and analysis with strengths in project management. Strong technical and methodical aptitude with an innate ability to analyse, coordinate and synthesize data. Aggressive in identifying and resolving inefficient operational processes.
Reliable, resourceful and avid team- based player with the ability in looking at the big picture and providing consistent follow-up work. Confident and passionate in training and mentoring individuals. Strong believer of effective two-way communication and great working relationships. Recognised skills and competencies in coaching, mentoring, problem-solving and root cause analysis.
Excel in unpredictable and hectic environments. assisted by a supervision/inspection team, he shall ensure that Topsides Contractor mechanical, architecture construction and pre-commissioning achievements are in accordance with the Contract. This is including prefabrication and construction activities performed both in subcontractors’ workshops yard.
Detail Professional Experience
Company : MV JUMBO JAVELIN.
Designation : E&IT Construction Commissioning Engineer
Projects : jumbo WIND FARM Project TAIWAN (Mar2020-June2020)
Fully responsible for Electrical Construction scope for Marine and Topside.
Leading the team member and Provide Supervisory/technical hands on electrical Construction & commissioning works and inter-connection between top side 6generators & trustor motors additional chiller units, frag unit’s modification works, control room and field activities.
Supervise and ensure that all cable ladder installation, electrical equipment switchboard installation, cable laying 240sqmm MV & LV& Controls cable spacing, cover, cable identification and protection complies with the project specifications
Switchboard modification & soft starter internal additional wirings.
Testing & commissioning works.
Company : YINSON PRODUCTION PTE LTD.
Designation : E&IT Construction Supervisor
Projects : HELANG FPSO NIPPON Project (Feb2018-Aug2019)
Description:
Fully responsible for Electrical Construction scope of FPSO for Marine and Topside.
Issuing site instruction to module fabrication contactor and shipyard based on project specification.
Monitoring and verifying for installation of Control systems, power distribution, and inter-cabinet cabling installation and termination
Involved in safety walk about with other departments, shipyard for general safety implementation requirements.
In charge of various systems Installation and commissioning of like Power generation system, Emerson Tank level monitoring, Ballasting and Bilge system.
Electrical isolation and security scope management
Monitoring and verifying for installation of Control systems, power distribution, and inter-cabinet cabling installation and termination
Supervision Electrical of Marine Navigation and Communication Systems such as GMDSS, AIS, S- Band & X-Band radar, ECDIS, Inmarsat F, VSAT, DGPS and Gyro etc.
Supervision and Installation of ICCP, ICAF, Galvanic Sacrificial Anode and Propeller Shaft Earthing system.
Involved in safety walk about with other departments, shipyard for general safety implementation requirements.
Participate in all Electrical, coordination, progress and safety meetings related to the assigned project regularly.
Supervision for installation of Main switch board, Electrical panels and all other E&I Equipment’s.
Supervise and ensure that all cable ladder installation, electrical equipment installation, cable laying, cable spacing, cover, radii, cable identification and protection complies with the project specifications
Capitalize on POC process activities during design to compensate the limited vendor and engineering documentation developed according to standard equipment/package purchasing philosophy and fit for purpose approach requested by project during EP.”
Ensure the preparation of process utility / HC and safety (Firewater) systems commissioning and start up including
Support development of operating and start-up procedures especially for packages (GTG, FGC, SGC) developed under POC scope,
Reviewing and approving of shipyard drawings
Reviewing and approving of TQR and Job confirmation form
Conducting weekly progress meeting with Shipyard and DDO contractors
Reviewing assigned project planning package particularly on E&I fabrication, installation and commissioning activity sequence and priorities.
Reviewing electrical and instrumentation installation procedure, detailed installation method statement appropriately.
Supervise and ensure that all cable ladder installation, electrical equipment installation, cable laying, cable spacing, cover, cable identification and protection complies with the project specifications
Reviewing and acknowledge relevant site modification proposals, red line mark-up drawings for "As Built" submission requirement.
Responsible for a safe working environment, activity job hazard analysis, permit to work and completion target dates as planned.
Responsible for HSE, safety briefing prior to Heavy Electrical equipment installation as per the approved installation method statement.
Monitoring manpower loading against the daily fabrication and installation progress output as per the approved planning package.
Supervision and monitoring of MV, LV, Control, and Instrument cable ladder routing, MCT, A60 cable trunk installation and MV cable pipe sleeves Installation.
Responsible for punch list monitoring, coordination with QA/QC and conduct punch list meeting as required.
Company : SAIPEM PRODUCTION PTE LTD
Designation : Commissioning Instrumentation Supervisor
Projects : KAOMBONORTH TOTALFPSO PROJECT (Feb 2017-Feb2018)
Description:
Leading the team member and Provide Supervisory/technical hands on electrical commissioning works and inter-connection between top side module, Turret, control room and field activities
Supervision for Main cable ladder installation in Pipe rack, E house, Turret and Topside Modules.
Act as the process / safety interface by ensuring the coordination of change especially for Fire and gas mapping with potential of 100% of detection.
Automatization of compressor drain refer to CI-039.
Monitoring and verifying for installation of Control systems, power distribution, and inter-cabinet cabling installation and termination
Involved in safety walk about with other departments, shipyard for general safety implementation requirements.
In charge of various systems Installation and commissioning of like Power generation system, Emerson Tank level monitoring, Ballasting and Bilge system.
Electrical isolation and security scope management
Monitoring and verifying for installation of Control systems, power distribution, and inter-cabinet cabling installation and termination
Supervision Electrical of Marine Navigation and Communication Systems such as GMDSS, AIS, S- Band & X-Band radar, ECDIS, Inmarsat F, VSAT, DGPS and Gyro etc.
Supervision and Installation of ICCP, ICAF, Galvanic Sacrificial Anode and Propeller Shaft Earthing system.
Involved in safety walk about with other departments, shipyard for general safety implementation requirements.
Participate in all Electrical, coordination, progress and safety meetings related to the assigned project regularly.
Supervision for installation of Main switch board, Electrical panels and all other E&I Equipment’s.
Supervise and ensure that all cable ladder installation, electrical equipment installation, cable laying, cable spacing, cover, radii, cable identification and protection complies with the project specifications
Capitalize on POC process activities during design to compensate the limited vendor and engineering documentation developed according to standard equipment/package purchasing philosophy and fit for purpose approach requested by project during EP.”
Ensure the preparation of process utility / HC and safety (Firewater) systems commissioning and start up including
Support development of operating and start-up procedures especially for packages (GTG, FGC, SGC) developed under POC scope,
In charge of various systems Installation and commissioning of like Power generation system Emerson Tank level monitoring, Ballasting and Bilge system.
Validate process adaptation for planning recovery / simops / etc (e.g. adjustment of utilities pending on system readiness)
Review and further draft of the black start procedure: the one prepared by POC cannot be executed, it’s like a schedule 1 whereas a level 4 is needed to do a black start
Review and validation of some OTPS: blowdown / emergency depressurisation, others with strong process aspect
Support to instrumentation F&G engineer, input the procedures on PCS / ESD / FGD systems
Prepare the procedures on the lifesaving items (including lifeboat free fall test, emergency escape way, life buoys, inflatable life raft…) linked with OTP.
Ensure the execution of process utility / HC and safety (Firewater) systems commissioning and start up
Pre-start safety review: Could be the focal point to review process start-up and safety reviews and clear punch list, first at yard, then offshore
Preparing the management of change on process side to conduct the OTP test
Support for rotating equipment OTP (ex: N2 run) 5. Site activities
Perform the PCC on the lifesaving items (including lifeboat free fall test, Emergency escape way, life buoys, inflatable life raft…)
Start-up support for process units à offshore mainly and a bit at yard
Monitoring and verifying for installation of Control systems, power distribution, and inter-cabinet cabling installation and termination
Company : YINSON PRODUCTION PTE LTD.
Designation : MC EXCECUTION & EEx-inspector Supervisor
Projects : OCPT FPSO ENI GHANA Project (Aug2016-Feb2017)
Description:
Supervise the execution of Electrical and instrumentation fabrication and installation works, ensuring full compliance with safety and quality standards and procedures and verify that works are correctly carried out in accordance with project documentation and in the planned time frame.
Ensure the fulfilment of the project quality and contractual requirements.
Verify and confirm the availability of drawings and materials, to plan the efficient execution of the works.
Assist yard and client for solve the site clashes and issues, rise the site queries to solve site issues
Prepare and coordinate the detailed programs for the assigned activities.
Measure the progress of the works carried out.
Provide quantitative data for producing weekly progress reports, monitoring the manpower.
Promote safe works practices and environmental protection, ensuring that safety and quality standards are respected.
Prepare of inspection request and follow-up inspection result and clearing punch list
Preparation of progress report for progress claim.
Company : MODEC PRODUCTION PTE LTD
Designation : Commissioning Sr. Instrumentation tech
Projects : TEN MV25 TULLOW OIL FPSO PROJECT (Jan2015-Jul2016)
Description:
Supervise the execution of Electrical and instrumentation fabrication and installation works, ensuring full compliance with safety and quality standards and procedures and verify that works are correctly carried out in accordance with project documentation and in the planned time frame.
Ensure the fulfilment of the project quality and contractual requirements.
Verify and confirm the availability of drawings and materials, to plan the efficient execution of the works.
Assist yard and client for solve the site clashes and issues, rise the site queries to solve site issues
Prepare and coordinate the detailed programs for the assigned activities.
Verify that works are correctly carried out in accordance with the project specifications, highlighting any engineering problems encountered in the field.
Measure the progress of the works carried out.
Provide quantitative data for producing weekly progress reports, monitoring the manpower.
Promote safe works practices and environmental protection, ensuring that safety and quality standards are respected.
Prepare of inspection request and follow-up inspection result and clearing punch list
Preparation of progress report for progress claim.
Company : EMAS PRODUCTION PTE LTD.
Designation : EIT Supervisor
Projects : PRERISAI KAMELIA HESS FPSO(Feb2014-Dec2014)
Company : EMAS PRODUCTION PTE LTD.
Designation : EIT Supervisor
Projects : LEWEK PERMIEROILEXTENDED Project (Jan2013-Jan2014)
Company : TEEKAY SHIPPING PTE LTD
Designation : Construction & Commissioning Instrumentation Supervisor
Projects : BRAZIL TIRO SIDON FPSO PROJECT(Feb2012-Dec2012)
Company : BUMIARMADA PTE LTD
Designation : EIT Construction & Commissioning ENGINEER
Projects : TGT VIETSOV FPSO PROJECT (Jan2011-Feb2012)
Description:
Fully responsible for Instrumentation Controls Construction scope of FPSO for Marine and Topside.
Issuing site instruction to module fabrication contactor and shipyard based on project specification
Reviewing and approving of shipyard drawings
Reviewing and approving of TQR and Job confirmation form
Conducting weekly progress meeting with Shipyard and DDO contractors
Reviewing assigned project planning package particularly on E&I fabrication, installation and commissioning activity sequence and priorities.
Reviewing electrical and instrumentation installation procedure, detailed installation method statement appropriately.
Supervise and ensure that all cable ladder installation, electrical equipment installation, cable laying, cable spacing, cover, cable identification and protection complies with the project specifications
Reviewing and acknowledge relevant site modification proposals, red line mark-up drawings for "As Built" submission requirement.
Responsible for a safe working environment, activity job hazard analysis, permit to work and completion target dates as planned.
Responsible for HSE, safety briefing prior to Heavy Electrical equipment installation as per the approved installation method statement.
Monitoring manpower loading against the daily fabrication and installation progress output as per the approved planning package.
Supervision and monitoring of MV, LV, Control, and Instrument cable ladder routing, MCT, A60 cable trunk installation and MV cable pipe sleeves Installation.
Supervision and Installation of ABB MV switchgears, ABB 440V LV normal switchgears and Emergency Switchgears, Distribution Transformers, Various group starter panel.
Monitoring and verifying for installation of Control systems, power distribution, and inter-cabinet cabling installation and termination
Involved in safety walk about with other departments, shipyard for general safety implementation requirements.
Participate in all interface, coordination, progress and safety meetings related to the assigned project regularly.
Responsible for punch list monitoring, coordination with QA/QC and conduct punch list meeting as required.
Responsible for monitoring ITR submissions in line with the "Testing and Pre-Commissioning Schedule"
Company : MODEC PRODUCTION PTE LTD
Designation : Commissioning Sr. Instrumentation tech
Projects : KWAMENKRUMAHMV21FPSO PROJECT (Jan2010-Dec2010)
Company : TANKER PACIFIC PRODUCTION PTE LTD
Designation : Electrical Construction Supervisor
Projects : MONTARA VENTURE FPSO PROJECT (Jan2009-Dec2009)
Company : AKER SOULATION FLOATING PRODUCTION PTE LTD
Designation : Commissioning Instrumentation Supervisor
Projects : DHIRUBHAI-1MA-D6FPSOPROJECT(Jun2008-Dec2008)
Company : NEPTUNE EXPLORER PRODUCTION PTE LTD
Designation : EIT Supervisor
Projects : RAELIANCE DRILLING FSRU PROJECT (Jan2008-Jun2008)
Company : BW OFF-SHORE
Designation : Commissioning Instrumentation Sr.
Projects : BW PIONEER FPSO PROJECT(Sep2007-Jan2008)
Company : BW OFF-SHORE
Designation : Commissioning Instrumentation Sr.
Projects : YUMKAKNAAM FPSOPROJECT(Aug2006-Sep2007)
Company : HYFLUX(S) PTE LTD
Designation : EIT ENGINEER
Projects : WASTEWATER TREATMENT PROJECT (Aug1999-Jul2006)
• Coordinate and carry out Electrical Power Shutdown. Attend to breakdown maintenance, fault requests and complaints and report on the follow up actions with proposed solution.
• Ensure preventive maintenance activities is carried out by term contractors accordingly to contract technical specification.
• Ensure contractors follow the safe work processes on site such as submission of permit to work, risk assessment, safe work method statement and attend safety induction course before work commencement
• Assist and attend handover over/inspection for new equipment and facilities
• Attend to client request and source quotation with the correct technical specification for client approval.
Major Achievements
Recognised by management for good work performance and was promoted from Engineer to Assistant manager position.
Assisted in the roll-out of digitalisation of customers documents, reducing the time needed for front and back office teams in assessing the information.
Education Qualifications
BEEE in Electrical & Electronics Engineering (EEE), Coventry University (UK)- Singapore 2010
Advanced diploma in process control and instrumentation (APCI2)- Singapore poly 2007
Diploma in Electrical & Electronics Engineering (DEEE), April 1997 – India
Professional Qualifications
Comp Ex Certificate of Core Competence Certificate No.50295/086973GV exp MAY 2025
MCA HIGH VOLTAGE Certificate No.016-5848/4128 exp life long
SSSC Shipyard Safety Supervisor Course
Soft Ware Experience
In tools
Software: AutoCAD/Control system software’s/ CAD works and Microsoft Office.