DEBABRATA ADHYA
**************@*****.*** **************@*****.***
Targeting Project Manager (Civil)
Experience Summary
**/** ** ***-******* on civil construction in KEI Industries Ltd. Under WBSEDCL On (01ST August 2019 to till date )
33/11 KV Sub-Station & 33 KV UG Line on civil construction in KEI Industries Ltd. Under MVVNL (IPDS) Project at Unnao (UP) On (12TH September 2017 to 31ST July 2019 )
220 KV Sub-Station in Genus Power Infrastructure Ltd. Under NTPC Project at Hazaribag On (15TH December 2016 to 31ST August 2017 )
33/11 KV Sub-Station (EPC Dept.) in Genus Power Infrastructure Ltd. Under Uttrakhand Power Co. Ltd. at Haridwar on (27TH April 2015 to 13Th December 2016.)
132/33 KV With Hybrid GIS with connecting line of 132KV UG and OH transmission line on civil construction in Rahul Cable Pvt. Ltd. Under A.P. Transco at vizag, on (10Th September 2013 to 22ND April 2015)
765/400 KV Pooling Sub-Station. Techno Electric & Engineering Co. Ltd. Under Power Grid at Indore on (20Th August 2012 to 31St August 2013)
Metro Railway (Rail Vikas Nigam Limited) on the topic of pile foundation from 15Th June 2011 to 7Th July 2011.
Working Experience
33/11 KV Sub – Station (Civil/ Electrical) : Billing (Contractors & Client) Planning & Monitoring, Client & Contractor Dealing.
33 KV Double Laying UG Cable (Electrical): 5 KM Double Laying Under Ground Cable with Highway and Railway Track Crossing with full safety & Quality.
33/11 KV Sub – Station (Civil) : Structural Foundation, Transformer Foundation, Capacitor Bank Foundation, Cable Trench, Compound Wall & Control Room Building with Complete Sub – Station and Road. (Execution with Quality Control, Quantity Survey with BBS and Contractors & Client Billing, Planning & Monitoring, Client & Contractor Dealing.
220 KV Sub – Station(Civil): Structural Foundation (Mat Foundation, Raft Foundation, Pile Foundation), Transformer Foundation, DG & Oil Tank Foundation, Cable Trench, Road, Compound Wall & Control Room Building (G+1) with complete Sub-Station. (Quantity Survey with BBS. Quality Control, Client & Contractor Dealing & Project Monitoring.)
33/11 KV Sub – Station (Civil): Structural Foundation, Transformer Foundation, Capacitor Bank Foundation, Cable Trench, Compound Wall & Control Room Building with Complete Sub – Station and Road. (Execution with Quality Control, Quantity Survey with BBS and Contractors & Client Billing.)
33/11 KV Sub – Station (Electrical): S/W Earth Mat Laying, 5 MVA T&F, LA, BPI, CT, VCB, ISO, PI, PT, BUS Bar Gantry & Terminal Gantry & Capacitor Bank Structure Erection Alignment & Equipment Erection & Alignment, Panther Conductor Stringing, Earthling All Equipment & Chemical Boring. DP and 63 KVA Station T&F Erection. Incomer Outgoing & Capacitor Panel Serial wise Placing, Bus Coupler Jumping, and DC Charger Setup, 33 KV UG Cable Lay-out and others Electrical Erection Work Execution and etc.
132 KV OH/UG Transmission Line (Civil): Structural Tower Foundation & Pile Foundation & Project Monitoring (Quantity Survey & BBS with Billing, Quality Control, Client & Contractor Dealing, Project Monitoring.)
132 KV OH/UG Transmission Line (Electrical): Structure Erection & Alignment, Conductor Stringing. 132 KV UG Cable Lay-out and others Electrical Erection Work Execution and etc.
132/33 KV Sub – Station (Civil): Structural Foundation, Cable Trench, Compound Wall & Control Room Building (G+1). ( Quantity Survey With BBS, Quality Control & Project Monitoring )
765/400 KV Switchyard: Structural Tower & Equipment Foundation, Reactor Foundation, Cable Trench, Culvert, Panel Room, Road, Compound Wall & Control Room Building (G+2), ( Execution, Quantity Survey With BBS & Quality Control . )
Bridge & Pile Foundation: Execution, Quantity Survey.
Achievements
Achieved civil in-charge on Vizag site for being one of the star performers in January, 2014.
Academics
Board / Examination
School / College
CGPA/
Year of passing
Percentage
1
3 Years
Diploma
In Civil
JIS School Of Polytechnic Kalyani,
75.8%
2012
Engineering (WBSCTE)
Nadia
2
10+2
Higher
Secondary
Kaswar
Yasin
Mondal
78.8%
2008
(WBSCVET)
Sikshanikatan.
3
Graduation
Burdwan University
Chandannagore Govt. College
37.18%
2007
Higher Secondary
Dr. Stal
Prasad
Ghosh
Adarsha
4
Sikshalaya
37.5%
2003
(WBCHSE)
Chandannagar.
Secondary
Dr. Sital
Prasad
Ghosh
Adarsha
5
Sikshalaya
50.5%
2001
(WBBSE)
Chandannagar.
Hobbies
Hobbies: Social Work, Playing & Watching Cricket, Swimming & Gymnastic.
Personal Details
Father’s Name: Shri Biswanath Adhya
Date of Birth: 25Th April 1985
NATIONALITY: Indian
Strengths: Industrious, Confident, Positive attitude, Quick learner.
Corresponding Address: Uttar Chandannagar, P.O - Buroshibtala, P.S - Chinsurah, Dist - Hooghly, WB-712105
Available for Relocation and Travels
Date: 23RD July 2020
Place: Kolkata, West Bengal Debabrata Adhya