Post Job Free
Sign in

Hvac Design Engineer

Location:
Qibla, Kuwait City, Kuwait
Posted:
August 13, 2020

Contact this candidate

Resume:

P R O F I L E S Y N O P S I S

Strong knowledge of HVAC systems, heat exchangers, renewable energy technologies, and energy saving methods; knowledge of different grades, class & schedules of piping and different national standards.

Serve as an in-house technical resource across multiple projects; possess experience in participating in regular engineering progress review, preparing and executing project plans providing technical evaluations and analysis and ensuring compliance with prescribed quality plans

Knowledge and understanding of design principles and procedures and requirements of the associated industry codes and standards related to projects involving mechanical designs development

Skilled in various CAD packages including AutoCAD and HVAC design.

Possess high standard of personal integrity and decisiveness, in addition to problem-solving and influencing skills C A R E E R T I M E L I N E

Since Feb 2019 May 2013 – Jan 2019 May 2013 – Jan 2020 ROSHEN GEORGE

MATHEW

*******.******@*****.***

+971-*****-****, +971-*****-****

HVAC DESIGN ENGINEER - PROJECT LEAD

Autodesk® AutoCAD 2012 Associate

HVAC Operation Excellence

Ensure availability of required

manpower (i.e. Supervisor,

Foreman, Duct fitter, Assistant

duct & pipe fitter) to facilitate

processes

Prepare & approve HVAC

Shop Drawings, MEP-

Coordination Drawings, Work

method statement and

Project Specification from

Client/MC

Project Management

Execute all planned site

inspections as per the

intervention points marked in

the relevant drawing and

standard to ensure project

management excellence

Active involvement with the

Project management & QC

Supervisor and manager to

resolve the site related issues

People Management

Collaborating with cross-

functional teams to install,

configure and deliver third

party product installations

Ensure user satisfaction by

providing preventative

maintenance and timely

resolution of more complex

problems

Technical Skills

AutoCAD Associate 2012

(by Autodesk)

Microsoft Office 2007

Suite (Word, Excel and

PowerPoint) – Advanced

Microsoft Office Project –

Intermediate level

HAP 4.9

WORK E X P E R I E N C E

Detailed load estimating utilizing computer software simulation. Includes knowledge of Kuwait Ministry of Electricity & Water

(MEW)regulation, building construction materials, knowledge of meeting outdoor air requirements for indoor air quality, and general understanding of internal heat loads.

Application and selection of carious types of HVAC equipment including air handling units, fans, coils and condensing units, DX and PACU.

Design and layout of commercial and industrial duct systems including supply, return, exhaust and ventilation and dust collection systems.

Application and selection of air terminal devices such as variable air volume boxes, grilles and diffusers and louvers.

Design, application and selection of hydronic systems and associated system accessories.

General knowledge of HVAC system controls desirable. Includes development of general HVAC temperature control diagrams and written sequence of operation

Development of construction document packages based on the project requirement and application.

Attending and conducting Client meetings in order to clearly understand job/owner requirements and expectations. Includes project review meetings, construction meetings and project closeout meetings.

Project Ship drawing and submittal review and approval

On-site inspection of HVAC system installations. Please refer annexure for project details:

Ensure the chiller works, air handling units, split units, cooling tower are available, approved by Inspection department prior to installation.

Coordinate with other discipline and ensure site clearance is available for the HVAC Activities commencement.

Ensure all attend safety orientation and have proper PPE’s prior start installation activities at site.

Provide approved HVAC Shop drawing, MEP Co-ordination Drawing to site supervisor and notify them to shift the required ducting and piping approved material from warehouse to site, arrange required material to avoid progress delay.

Prior to start HVAC activities brief the QC Personal for surveillance to ensure the quality work.

Maintain safe all construction HVAC and Chilled water piping activity by carrying them in accordance with the Company’s safety policies and procedures; ensuring that appropriate safety and protective equipment are used by Company & Contractor staff

Closely monitor site activities to guarantee quality of work in compliance with approved shop drawing and Specification, get daily progress report from site supervisor (or) foreman and update to Project Manager.

Developed relevant documents to conduct inspection for completed installation activities and raise RFI to QC-Inspector (To ensure that any activity offered for inspection has an attachment of IFC drawing, method statement (if required), Inspection & Test Plan (ITP) followed by check list)

Produce relevant documents to Conduct Testing inspection such as Duct light testing/pressure test for Ducts and Hydro test for Above ground and Underground chilled water piping’s, systems.

Assist the Commissioning Team in Pre-commissioning & Commissioning stages of all HVAC Equipment’s, Testing, Adjusting

& Balancing (TAB) stages of the Air and Hydronic Piping’s. Please refer annexure for project details:

Operated four AUD$2 million robot palletisers.

Identified logistics areas for process improvement and cost savings to ensure expectations are met, accuracy of shipping is maintained and received documentation, compliance with proper procedures.

Responsible for maintaining, tracking and analysing all inbound shipments.

Prepared statistical data for contract negotiations and participating in negotiations

Lead the analysis and provided statistical information on the tracking of product shipments, returns and inventory.

Provided “Health and Safety Report” on a bi weekly basis and implemented new rules made mandatory to work at the warehouse.

Developed business tools and solutions based on knowledge, product or technology and identified logistics process improvement.

Ensured that all activities and operations were performed in compliance with the Company’s Code of Conduct. A C A D E M I C C R E D E N T I A L S

2012 Master of Business Administration (M.B.A)

James Cook University, Brisbane, Queensland, Australia 2009 Master of Project Management (MS)

Queensland University of Technology, Queensland, Australia 2007 Bachelor of Mechanical Engineering (B.E), Anna University, Chennai, India

Significant Highlight:

Obtained scholarship for the graduation course.

Acquired Kuwait Society of Engineers (KSE) approval.

Purchased international authored books - related to HVAC Design and gathered knowledge on the same

Received accreditations from ACE Technology Consultants course completion

Certifications:

Ace HVAC training AutoCAD 2012

D.O.B - 7th Jan, 1986 LANGUAGES – English, Hindi, Malayalam and Tamil Address - Mangaf, Kuwait.

Academic Highlight

Achieved High Distinction for Integrated

Project “Proposal on Sustainable Resource

Management in Correctional Services”

Attained Distinction for course unit

“Sustainability Management”

Mobile workshop using Pneumatic Tools –

Final year Active Project

Setup installation within the car so as to operate 7 pneumatic tools at the same time utilizing the

power derived from the car engine. Model was

presented to MRF Tyres India.

PROJECTS HANDLED

Naser M. Al-Baddah & Partner General Trading & Contracting Company (NBTC) New Distribution Network for North Kuwait ESP’s – RAD1 & RAB1 Substations Jul ‘13-Aug ’14 Client: Kuwait Oil Company (KOC)

PMC: Amec Foster Wheeler

MC: Petrofac Intl. Ltd

Responsibilities:

Supplied, Installed & Commissioned HVAC works & Plumbing for 2 No. Substations

Managed installation of 6 No. DX split units, 6 No. Explosion proof Exhaust Fans, 18 No. Exhaust Fans, 3 No. Mini split units, GI Ducting with all necessary thermal insulation, air inlets & outlets, all dampers, drain & copper refrigerant piping for the main & stand by DX units, plumbing works & sanitary fixtures, building automation for the HVAC system including H2S & H2 sensors and all necessary electrical work related to HVAC including control panel, cable trays, conducting, cables, wiring

Positioned and interconnected the equipment with nearest power

Flushing of refrigerant pipe, leak testing and evacuation

Tested, Startup & Commissioning of HVAC system

Significant highlights:

Received appreciation for HVAC works quality and completed project on time.

Increased the overall profit by 2%

New Booster Substation BS-132 Enhancements at BS-131, (GC 15, 23 & 25) North Kuwait Sep ‘13 – Oct ‘14 Client: Kuwait Oil Company (KOC)

PMC (project main consultant): Amec Foster Wheeler MC (Main Contractor): SK Engineering & Construction Company Responsibilities:

Supplied, Installed & Commissioned HVAC works & Plumbing for 3 No. Substations

Directed installation of 4 No. single package units, 2 No. DX split units, 6 No. Explosion proof Exhaust Fans, 3 No. Chemical Air Filter, 6 No. Mini split units, GI Ducting with all necessary thermal insulation, air inlets & outlets, all dampers, 6 No. sound Attenuators, drain

& copper refrigerant piping for the main & stand by DX units, all necessary electrical work related to HVAC including control panel, cable trays, conducting, cables, wiring, building automation for the HVAC system including H2S & H2 sensors and Sanitary drainage system, fixtures & plumbing works

Installed and interconnected equipment with nearest power

Flushing of refrigerant pipe, leak testing and evacuation

Tested, Startup & Commissioning of HVAC system

Significant highlights:

Increased the net profit by 4.8%

Municipal Council Building & Car Park, Kuwait City Nov ‘15 – Dec ‘16 Client: Ministry of Kuwait

PMC (project main consultant): Al Jazera Consultants MC (Main Contractor): Al Tawbad General Trading & Contracting Co PC (Payment Contractor): China Railway 18th Bureau Group Co Ltd Responsibilities:

Supplied, Installed & Commissioned HVAC works for 4 Floors Car Park & 10 Floors Office Building

Execute installation of 2 No. Water Cooled Centrifugal Chiller 600 Ton (each), 2 No. Ethylene Glycol screw Chiller 300 Ton (each), 19 No. thermal energy storage tanks, ice inventory meter & glycol management system, 3 No. Cooling Tower, 2 No. Plate type heat exchangers, 12 No. Air Handling Units, 42 No. Fan Coil Units, 2 No. ducted split units, 2 No. Precision Units, 24 No. Explosion proof Exhaust Fans, 14 No. CHW & CW & HX pumps, 8 No. Chemical Air Filter, 6 No. Mini split units, air separator, sand separator, all valve for black steel/ carbon steel piping, GI Ducting with all necessary thermal insulation, air inlets & outlets, all dampers, sound Attenuators, drain & copper refrigerant piping for the main & stand by DX units and all necessary electrical work related to HVAC including control panel, cable trays, conducting, cables, wiring

Installed and interconnected equipment with nearest power

Flushing of black steel pipe, leak testing and evacuation

Tested, Startup & Commissioning of HVAC system

Lower Fars Heavy Oil Development Program Phase 1 Dec ‘16 – Dec ‘17 Client: Kuwait Oil Company (KOC)

PMC (project main consultant: Worley Parsons

MC (Main Contractor): Consolidated Contracts Company Responsibilities:

Commissioned and installed HVAC works, Plumbing & Firefighting works for 8 No. Buildings

Monitored setup of 16 No. Air Handling Units, 89 No. Fan Coil Units, 2 No. ducted split units, 2 No. Precision Units, 16 No. Explosion proof Exhaust Fans, 18 No. CHW & CW & HX pumps, 16 No. Mini split units, air separator, sand separator, all valve for black steel/ carbon steel piping, GI Ducting with all necessary thermal insulation, air inlets & outlets, all dampers, sound Attenuators, Carbon/Black steel CHW pipes, drain & copper refrigerant piping for the main & stand by DX units, all necessary electrical work related to HVAC including control panel, cable trays, conducting, cables, wiring

Flushing of black steel pipe, leak testing and evacuation

Installed building automation for the HVAC system including H2S & H2 sensors, Sanitary drainage system, fixtures & plumbing works

Tested, Startup & Commissioning of HVAC system

Significant highlights:

Completed the 8 No. buildings on time for HVAC. High quality and time stipulated completion resulting in awarding 13 No. more buildings

New Refinery Project, Mina Al Zour (currently on going) Feb ‘18 – Jan ‘19 Client: Kuwait Integrated Petroleum Industries Company (KIPIC) PMC (project main consultant): Amec Foster Wheeler MC (Main Contractor): Fluor Daewoo Hyundai Joint Venture (FDH JV) Responsibilities:

Supplied, Installed & Commissioned all the HVAC works & Plumbing for 20 No. Substations

Handled installation of 4 No. single package units, 40 No. DX split units, 40 No. Explosion proof Exhaust Fans, GI Ducting with all necessary thermal insulation, air inlets & outlets, all dampers, 40 No. sound Attenuators, drain & copper refrigerant piping for the main & stand by DX units, all necessary electrical work related to HVAC including control panel, cable trays, conducting, cables, wiring

Setup and interconnected the equipment with nearest power

Flushing of refrigerant pipe, leak testing and evacuation

Installation of building automation for the HVAC system including H2S & H2 sensors and Sanitary drainage system, fixtures & plumbing works

Tested & Commissioned HVAC system

ITO-ROMA Consultants (Design & Engineering Services Division (ITO-Roma) Luxury System Villa Dr. Ghassan Villa Sheikha Lolwa Feb ‘19 – Present Client: Private Owners

As PMC: ITO-Roma Consultants

Responsibilities:

Designed heating and cooling systems and controls.

Provided heat load calculation to determine required heating and cooling power as per MEW regulation

Drafted and constructed plans and schematics along with the Architect and Structural engineers

Provided ventilation requirement for basement parking asper MEW regulation

Prepared separate budget cost for HVAC

Coordinated and collaborated with owners and vendors for the most suitable DX and PACU.



Contact this candidate