Associate of Science Degree, Construction Management, BYU-Idaho, December 2001 Sr. Project Manager, Nomlaki Technologies, LLC, Sacramento, CA, December 2019 – June 1, 2020

• Responsible for procuring subcontractor proposals following job walks, budget creation and management during construction, create project schedule, project team management, coordination with third-party owner’s representation, manage design-build team members during design Project Manager, Layton Construction, Sacramento, CA, March 2018 – November 2019

• Responsible for budget creation and implementation, contract buy-out, drafting scope proposals, direct owner point of contact, project close-out and project team mentoring Project Manager, Swinerton Builders, Sacramento, CA, July 2015 – March 2018

• Responsible for budget creation and implementation, contract buy-out, drafting scope proposals, direct owner point of contact, project close-out

Assistant Project Manager, Swinerton Builders, Yuba City, CA, September 2013 – July 2015

• Responsible for all concrete, reinforcing, structural steel, miscellaneous metals, steel decking, CMU, elevators, roofing, glazing, curtainwall, aluminum storefront, interior and exterior tiling, precast architectural concrete, expansion joints, landscaping and irrigation trades and scopes. Senior Project Engineer, Swinerton Renewable Energy

Coldwater and Wyebridge, Ontario, Canada, June 2012 – March 2013 o Three project sites generated a combined 21.5MWAC

Sacramento County, October 2011 – May 2012

o Four project sites generated a combined 69.4MWAC

Assisted in electrical, civil and structural design development of PV projects

Responsible for daily self-perform productivity tracking and assisted with month end reports to owner

Acquired, reviewed and submitted all test commissioning reports to owner and owner’s independent engineer consultant

Responsible for coordinating and tracking all material deliveries with multiple nationwide vendors Project Superintendent, Swinerton Builders, Vacaville, CA, June 2011 – October 2011

All work was performed in or around active SCIF employee cubicles and management offices

Multiple phased TI project that occurred concurrently in three buildings Project Engineer, HMH Builders, Sacramento, CA, Kaiser South Sacramento Emergency Department Renovation and Addition, MOB IV and Helipad, May 2008 – June 2011

2,000 sq. ft. remodel and 8,000 sq. ft. addition of an active Emergency Department. Project included a new imaging room, three-bay level 4 trauma patient care room, medical staff conference room, ED management offices, medical staff locker room, new IT room, demolition of all communication cables from existing IT closet and installing new communication lines from the new IT closet throughout existing and new ED facility.

Constructed a new 4,500 sq. ft. MOB 10’ away from the new ED expansion project o New MOB included (6) patient rooms, (1) procedure room and (4) medical staff offices

Built a new helipad on top of an 8’ high elevated earth platform with concrete ramp and stairs o Assisted in all site work construction which included relocating existing underground utilities, installation of new underground utilities, construction of all new concrete curb, gutter, asphaltic concrete, re-routing ambulance drop-off and landscaping Project Superintendent, Pulte Homes Corporation, Bay Area Division

The Legends at Magnolia Park, Oakley, CA, October 2006 – January 2008 (Superintendent)

Manage all day-to-day construction activities from permits to close of escrow of 105 residences

Wisteria at Valley Glen, Dixon, CA, March 2006 – October 2006 (Superintendent)

Completed an additional 45 homes ranging in size from 1,615 to 2,450 sq. ft.

Legacy Manor at Valley Glen, Dixon, CA, April 2004 – August 2005 (Superintendent)

Managed all activities on a new 88 alley-loaded, detached garage residential project

Built a (3) model home complex in 60-calendar days

Wisteria at Valley Glen, Dixon, CA, May 2003 – April 2004, (Assistant Superintendent)

Computer: Microsoft Office Suite, P6 and Bluebeam

Construction: Project Management, Scheduling, Quality Assurance, Estimating and Budget Control

Business: Safety, Financial Management, Business Writing and Client Satisfaction

Language: Portuguese – Fluently Speak, Read and Write; Spanish – Understand Written and Oral

Strengths: Leader, Self-Motivated, Team Player, Hard-working, Reliable and Detail-Oriented

Eagle Scout Award recipient OSHA 30 hour and STS certified