RESUME
Name : PANNURIHARISH
Profession : QA/QCEngineer
E-Mail : *******.******@*****.***
MobileNo : 990-***-****
ProfessionalExperience
QualityEngineerwith7yearsofWorkexperienceofinspectioninPiping,PetroleumStorage tanks,PressureVessels,WeldingandCoating.IndustrialexperienceinAerospace,Solar& Communication,TransmissionLineTowers(TLT),Tele-TowersandFabricatedstructures. CORECOMPETENCIES
QualityAssurance/
QualityControl
7QCtools
ThirdpartyInspection Manufacturing
Expediting Teamlead
Nameandaddressofemployer M/s.IRCLASSSystemsandSolutionsPrivate Limited,Mumbai.
Duration(from–to) JUL-2018TOTILLDATE
Projects DEPUTEDATDRDO,HYDERABAD.
Role QA/QCEngineer
Responsibilities InspectionofRawmaterialsatsupplierwhich include Destructive testing and Non-
destructivetesting,ComponentTestingand
Assemblyofmechanicalsubsystemsduring
research & development of Aerospace
components.
InspectionandexpeditingofRawmaterial,
pipingcomponentslikepipe,flanges,fittings,
valvesetc.
Inspection ofpre-fabrication & fabrication
jointsofshelsincludesmarking,fit-upand
dimensionalcheckbefore&afterweldingas
perdrawings,ITP&ClientSpecifications.
Witnessed ultrasonic tests, DP, MPT,
InterpretationandreviewingtheRTFilms.
WitnessingWelderPerformanceQualification
(WPQ)andProcedureQualificationRecord
(PQR) and Reviewing Welding Procedure
specification (WPS) as per approved
specifications.
Witnessing pressure test (hydraulic and
pneumatic)offabricatedstoragetanksand
aerospacecomponents.
Reviewingofcalibrationstatusofmeasuring
instruments.
Preparation ofPurchaseorders,process
sheets, Quality Assurance plans and
Clearancecertificatesforthemanufacturing
of Mechanical Subsystem and final
inspection clearance of Aerospace
componentsforfurthermachining.
`
Nameandaddressofemployer M/S.NUEVOSOLENERGYPRIVATELIMITED, PASHAMELARAM,HYDERABAD
Duration(from–to) May2016toJul2018
Projects Azure59MwatPunjab,Ujaas13.6MwatMandsaur
(MP),Greenko100Mwand33MwatKarnool(AP)
andotherprojects.
Role QualityEngineer
Responsibilities Rawmaterialinspectionandreviewoftest certificates with respect to applicable
standardsasperMQP.
GeneratedDailyProductionstatusReport
(DPR)and DailyinspectionstatusReport
(DIR)fromvendorsitelocations.
Drawingreviewanddimensionalinspection
ofsolarcomponentssuchascolumnposts,
purlins,bracings,raftersandgussetsasper
approveddrawings.
Stagewiseinspectionofcoldrolforming
milsofsolarstructureslikehatpurlins,C-
channelsandL-anglesections.
Inspectionofeveryproductionstagesof
qualityandGenerationofdailyinspection
reportssuchasfirstpiece,inprocessand
finalinspection.
PreparedIQP,MOM,createchecklists,quality
& production instruction formats and
coordinated with TPI during the final
inspectionandclearingthecomponents.
Monitoringqualityofincomingmaterialsto
final product, identify deviations and
feedbacktoconcernthroughNCR’s,conduct
materialreviewmeetingsfordisposalofN.C
materials.
Measuringinstrumentscalibrateddulyand
maintainingrecords.
Supervising ofpackaging,dispatching at
shop flooroffinisheditemstovarious
erectionsites.
Coordinatedinternalaudits,quality/safety
relatedprograms.
Nameandaddressofemployer M/SSAWARIAPIPESPRIVATELIMITED, PATANCHERU,HYDERABAD
Duration(from–to) Dec2014toMay2016
Projects PipesandPowerTransmissionLineTowers
(TLT)-GalvanizingDivision.
Role QCEngineer
Responsibilities Maintaining al process parameters in Galvanizing process and coordinate
inspection of galvanizing coating for
finishedsteelstructuresoftowerprojects.
Inspection ofcleaningprocessofblack
materialinbatchandstagewiseasper
productionplan.
Visualinspection carried outbefore and
afterhotdipping processandcorrective
action taken againstforvisualyfound
defects and reduces the Rejection and
improvingquality.
Galvanizingprocessflowreportsgenerated
daily and submission ofweeklyquality
reportswithrespectofactivities.
Coating Thickness Inspection after
completion of galvanizing process and
finishedtowerpartstructures.
Prepared and reviewed finalinspection
reportsandprovidingqualityclearancefor
fabricated finished Galvaning tower
structuresandmaintainedqualityrecords.
Samples preparation fortestingatNABL
approvedlabs.
Nameandaddressofemployer M/S.BSLIMITED,MEDCHAL,HYDERABAD Duration(from–to) Nov2012toOct2014
Projects PowerTransmissionLineTowers(TLT)and
CommunicationTowers.
Role QC(Graduateengineertrainee)
Responsibilities Rawmaterialinspection:Tocarryoutvisual and dimensionalofL-angles,platesand
ensurethatrawmaterialreceivedasper
standards.(Indian and International
standardsaspercustomerrequirement)by
performinglaboratorytestsandmaintaining
testrecords.
Shop floor: To carryout dimensional
inspection as perapproveddrawingand
preparingfirstpieceinspectionreports,in-
process reports and generated rejection
inspectionreportasperapproveddrawings.
In-processinspection:Tocarryoutprocess
inspection and ensure thatmaterialis
manufactured as perapproveddrawings
furnishedbycustomerandnon-conforming
materialwilbereworkedbeforefurther
processing.
Finalinspection:Tocarryoutinspectionfor
visibledefectsbeforeofferingtocustomer
andensurethatgalvanizingcoatingasper
standards.
TechnicalCertifications: ASNTLevel–II:VisualTesting(VT),UltrasonicTesting
(UT),Magnetic ParticleTesting
(MPT),PenetrateTesting(PT),Radiography
Testing(RT),RadiographyTestingFilm
Interpretation(RTFI)
Software’sskils: AutoCAD,Pro-E,Microsoftoffice.
AcademicBackground:
Graduation : B.Tech.(MECH)-Durationof2008to2012with69% fromJNTU-H.
10+2 : MPC-Durationof2006to2008with61%from
BoardofIntermediate.
10th : SSC-Durationof1997to2006with78%.
Personalprofile:
Name : P.Harish
DateofBirth : 01/08/1990
Bloodgroup : A+VE
Maritalstatus : Married
Languagesknown : Hindi,English,Telugu.
Nationality : Indian
Permanentaddress : S/oP.NarayanaMurthy(late),H.No:14-75,P&T colony,Dilsukhnagar,Hyderabad,Telagana.Pin
code:5000060.
PassportDetails:
Number : L1304883
DateofIssue : 24-05-2013
Dateofexpiry : 23-05-2023
Declaration:Theabovementioneddetailsaretruetothebestofmyknowledgeandbelief. Place:
Date:
PannuriHarish