VIKAS KUMAR SRIVASTAVA

S/O Mr. Krishna Mohan Srivastava, house no-19,

Moh. - Harpur, Dist. –Ballia, up. INDIA

Mob: 0091 945-***-****, E-mail *********@*****.**.**

*********@*****.***

Performance-driven Resident Construction Manager Professional with nearly 24+ years of experience in project execution, resource management and management of contracts. Skilled in efficient management of resource and de-bottlenecking operations.

Skill Profile

Project, execution, monitoring progress of work at project sites.

Mobilizing resources and ensuring optimum utilization

Controlling costs and ensuring conformance to project work schedules.

Participating in Project Review Meetings, evaluating progress and addressing bottlenecks.

Scheduling the manpower / equipment deployment based on site requirements.

Inventory control of basic materials and consumables to ensure conformance to budgets.

Implementation of standard safety and quality procedures.

Focused on task and team player.

Construction of Oil & Gas / Petrochem Projects, Power Projects, Cement Plant, Fertilizers Complexes.

Related construction works. Pre-commissioning, and commissioning.

RAOTATING and STATIC EQUIPMENT.

Installation works, pre-commissioning, commissioning and maintenance including major overhauls.

Fabrication and Erection works.

PROFESSIONAL EXPERIENCE:

Tata projects limited – CBM Bokaro, Jharkhand

Resident construction manager,

Client – ONGC

We are constructing” Coal Based Methane plant, 98 wellheads connected by 6” 8” pipeline 108 KM

Three location gas gathering station (civil mechanical, electrical, instrumentation) construction works.

Tata projects limited – Madanam, Nagapattnam Tamilnadu

Resident construction manager – from 1st march 2018 to till date

Client – ONGC

We are constructing Central processing facility (CPF) including 78 km 6” pipeline works from Madanam to Narimanan ONGC storage area. In this plant our scope 22000 m3 concreting 960 MT structure fabrication and erection, 120000 ID piping fabrication and erection and all electrical and instrumentation works.

Tata projects limited – Howrah, India

Resident construction manager – from 20th Oct 2015 to 20th February 2018.

Client – ITC kolkata.

We are completed one EPC project (food park) – Effluent treatment plant, Water treatment plant, savage treatment plant, 10 TPH Boiler, HVAC system, firefighting with fire detection system, air compressors system, nitrogen generation system,

LARSEN & TOUBRO ELECTOMECH, DIVISION – OMAN

Assistant General Manager - From Novembre 2014 to Octobre 2015

Gas compression unit, Foud – 0man

04 nos Gas compresser Erection and commissioning .

LARSEN & TOUBRO LTD, ENC DIVISION, ABUDHABI, UAE (Hydrocarboné Pipelines)

Poly propylène plant Brouage -3 Ruwais, Abu-Dhabi, UAE

Sr. Construction manager – From 12 sept12 to 31july14

Job profile : 1- 5, 00,000 ID piping fabrication and érections, hydro-testing (3400 test package), Pre-commissioning.

2- 8200 MT structures érections.

3- 6400 MT Equipment erection & Pre-commissioning.

Lanco Infratech, Paradip

Sr Manager - From Dec 2010 TO September 2012

Client: TOYO India

Project, IOCL Refinery, (DCU Unit) Paradip Orissa

Job profile: Civil and mechanical (8900 MT Structure fabrication and erection work, 2214 RM UG piping fabrication and erection) construction work

Close monitoring for cast control of project

Client managing for project Mobilized and optimized resource utilization.

Resource monitoring for staff welfare, accommodation, worker also

GALFAR ENGG. & CONTRACTING COMPANY. WLL, ABUDHABI

Construction manager: May2009 to Feb. 2010Project: EPC project of closed drain system for old RDS,s at BAB, Habsan, Abu Dhabi –UAE

Client: Abu Dhabi Company for Onshore Oil Operations (ADCO)

Job Profile:

Preparation of project schedules and managing subcontracts.

Resource monitoring, job monitoring.

Close monitoring for cast control of project.

Client managing for project.

Resource monitoring for staff welfare, accommodation, worker also

. Execution, Erection & Commissioning of Equipment

LARSEN & TOUBRO LTD, ECC DIVISION (Hydrocarboné Pipelines)

Assistant Construction Manager: Feb 2008 to march2009

Project: Panipat Naphtha Cracker Project, Client: Technimont India Ltd

Job Profile:

Preparation of project schedules and managing subcontracts.

Resource monitoring, job monitoring.

Execution, Erection & Commissioning of Equipments (6000 Ton)

BAHWAN ENGG CO, LLC. Oman

Construction Superintendent: July 2006 to Nov 2007

2Project: SOHAR FERTILISER PROJECT. SOHAR, (SULTANATE OF OMAN)

Job Profile:

1Installation of 2 no’s Hitachi Gas Turbine and 6 no’s Compressors make Mitsubishi heavy Industries. 10 nos Heavy Lifting, More than 250 tones, Equipment & 232 no’s light Equipment

2Pre-commissioning and commissioning of all Equipment.

3Installation of All Static Equipment Included Ammonia converter weight 432 tones CO2 Absorber weight 356 tones and column Internal works.

4Urea Granulation area all Equipment like Blower, Bucket Elevator, Erection and commissioning.

BAHWAN ENGG CO, LLC. Oman

Construction Superintendent: February 2006 to July 2006

Project: DOOSAN POWER PROJECT. SOHAR, (SULTANATE OF OMAN)

Job Profile:

Installation works for Siemens Gas Turbine Model 92.4 - 3 nos.

Pre-commissioning and commissioning Up to Startup of gas Turbine

Planned, Scheduled and monitored projects.

Structural Fabrication, Erection, Equipment & Commissioning work

Mobilized and optimized resource utilization.

BAHWAN ENGG CO, LLC. Oman

Construction Superintendent: October 2004 to December 2005

Project: OMAN LNG (QUALHAT LNG) TRAIN-3 PROJECT

Job Profile:

Installation Works for M R Compressors. P R compressors G E frame ‘6’ Gas Turbine 6 Nos Pre-commissioning Including Flushing of Lube Oil system and Enclosure of Compressors Stack Installation.

Commissioning and startup of all Rotating Equipment.

Allocated jobs to the subcontractor, attended punch list,

BAHWAN ENGG CO, LLC. Oman

Construction Superintendent: February 2003 to October 2004

Project: OMAN REFINERY DHDS PROJECT

Job Profile:

Installation Works for all Rotating Equipment Including Steam Turbine, Compressors, Pumps, Blowers & Fin-Fan Coolers.

Installation works for all static Equipment Including Internals Works for Column/Reactors/vessel.

Installation of fire Heaters. with associated piping & Refractory

Pre-commissioning including flushing of lube oil systems, steam turbine Solo-Runs, and Trial Air run for Fin - fan Coolers.

Commissioning and start-up of Rotating Equipment Including Nitrogen / Air Trial runs of major compressors.

BAHWAN ENGG CO, LLC. Oman

MECHANICAL (EQUIPMENT) ENGINEER. March 2002 to February 2003

Project POWER PROJECT, SALALAH (SULTANATE OF OMAN)

Job Profile:

Installation Works for all Equipment including 6 nos GE Frame ‘6 ‘Compressors, pumps & Fin-Fan Coolers.

Pre-commissioning Including flushing of lube-oil system and trial air run for Fin-Fan coolers.

Commissioning and Start-up of all Rotating Equipment.

BAHWAN ENGG CO, LLC, Oman

MECHANICAL (EQUIPMENT) ENGINEER.

Projects: POWER PROJECT - DEWA DUBAI-UAE.

Job Profile:

Installation Works for all Equipment including Siemens model 92.4 gas turbine Compressors, pumps & Fin-Fan Coolers.

Pre-commissioning Including flushing of lube-oil system and trial air run for Fin-Fan coolers.

Commissioning and Start-up of all Rotating Equipment.

BAHWAN ENGG CO, LLC, Oman

MECHANICAL MAINTENANCE ENGINEER. Jan 2000 to June 2001

Projects: ROYAL NAVY OF OMAN: MOD- (SULTANATE OF OMAN)

Job Profile:

Maintenance Works for all Rotating Equipment Including Gas Turbine make ABB, air Compressors & pumps

General Maintenance of Naval Base.

BAHWAN ENGG CO, LLC, Oman

MECHANICAL (EQUIPMENT) ENGINEER. July 1998 to January 2000

Projects: OMAN LNG TRAIN -1 & 2 PROJECTS (SULTANATE OF OMAN)

Job Profile:

Installation Works for all Equipment including gas turbine GE Frame ‘6’ Compressors, pumps & Fin-Fan Coolers.

Pre-commissioning Including flushing of lube-oil system and trial air run for Fin-Fan coolers.

Commissioning and Start-up of all Rotating Equipment.

Petron engg. Company INDIA

MECHANICAL ENGINEER. December 1997 to July 1998

Projects: FIBER GLASSES FACTORY. - INDIA.

Job Profile:

Fabrication & Erection of Structure Steel.

Installation Work of all Equipment Including Air Compressor, Screw Conveyors & pump.

Pre-commissioning & commissioning Work.

Petron engg. Company INDIA

MECHANICAL ENGINEER. August 1997 to December 1997

Projects: G.S.F.C. FERTILIZER PROJECT - BARODA - INDIA.

Job Profile:

Fabrication & Erection of Structure Steel.

Installation Work for all Rotating and Static Equipment Including Air compressors. Pumps, Heat Exchangers, Vessels etc.

Pre-commissioning & commissioning Work.

Petron engg. Company INDIA

MECHANICAL ENGINEER. January 1997 to August 1997

Projects: VCP. GULBARGA.CEMENT PLANT PROJECT - INDIA.

Job Profile:

Fabrication & Erection of Structure Steel.

Installation Work for all Rotating and Static Equipment Including Air compressors, Pumps, Air Slides, Mass flow Conveyors, Cement Mill & Raw Mill.

Pre-commissioning & commissioning Work.

Petron engg. Company INDIA

MECHANICAL ENGINEER. August 1995 to December 1996

Projects: IOCL .REFINERY PROJECT - PANIPAT - INDIA.

Job Profile:

Fabrication & Erection of Fired Gas Heaters.

Installation Work for all Rotating and Static Equipment Including Compressors, Pumps, Heat Exchanger, Column, Etc.

Pre-commissioning & commissioning Work.

Education & Training

Diploma (Mechanical), (UP Technical Board1994).

Diploma in Personal Management & Industrial

Safety in Construction Industry(in house)

Project Management(in house)

Risk Management(in house)

Effective Communication Skill(in house)

Personal Particulars

Date of Birth: 07.September.1969.

Language: English, Bengali, Bhojpuri, Hindi and Arabic,

Married

Having a Gulf Driving license

Passport Details

Passport Number

:

R6783829

Place of Issue

:

Lucknow

Date of Issue

:

29/01/2018

Date of Expiry

:

28/01/2028

References

1.CHANG SUP KIM : Construction Superintendent-SKEC.(Email: *****-*@****.**.**)

2.D.NAGRAJ. : General Manager - BEC- OMAN.(Phone: 009**-*******)

3.P. Satish pal : Planning manager - L&T India (811*******)