Post Job Free
Sign in

Power Plant Electrical

Location:
Quezon City, Philippines
Posted:
September 20, 2020

Contact this candidate

Resume:

GINES B. LUCERO

**** ******** **., ********** *****, Manila Philippines

E – MAIL: *****.******@*****.***

Cell no: +639********* / +639*********

POSITION DESIRED: ELECTRICAL FOREMAN

To acquire a position as Electrical Foreman in which I can apply my past training, education and experiences to make a positive impact on the growth of the company.

ELECTRICAL FOREMAN

OCTOBER 11, 2016 TO OCTOBER 10, 2017

UMM AL HOUL INDEPENDENT WATER POWER PLANT PROJECT (IWPP), QATAR

COMPANY: SAMSUNG C&T CORPORATION

JOB DESCRIPTION:

PREPARED MATERIAL AND TOOLS LIST FOR ALL ELECTRICIANS PRIOR TO SITE WORKS.

INSTRUCTED AND LED ELECTRICIANS CONCERNING ELECTRICAL PROCEDURES.

CABLE GLANDING AND TERMINATION FOR CONTROLS AND POWER CABLES

LINE CHECKING, IR TEST

CABLE PULLING

CLEARING PUNCHS ITEM

TROUBLE SHOOTING

ELECTRICAL FOREMAN

SEPTEMBER 24, 2014 TO JUNE 30, 2015

KNPC HALON PHASE OUT PROJECT AT MINA AL-AHMADI

KUWAIT.

COMPANY: HANWHA ENGINEERING & CONSTRUCTION

JOB DESCRIPTION:

CONDUCT DAILY TOOLBOX TALK

PLANNED, ASSIGNED, SUPERVISED AND INSPECTED THE WORK OF ELECTRICIANS

INSTALLING CONDUIT PIPES & EMT PIPE

INSTALLING FIRE ALARM DEVICES, SMOKE DETECTOR, HEAT DETECTOR, FLAME DETECTOR SOUND STROBE, BELL SOUNDER & ETC.

CABLE PULLING FIRE ALARM CABLE POWER AND CONTROLS CABLE

TROUBLE SHOOTING DEVICES

ELECTRICAL FOREMAN

FEB 5, 2013 TO FEB 5, 2014

PROJECT: AL-KHALIJ POWER PLANT

SIRTE LIBYA.

COMPANY: HYUNDAI ENGINEERING CONSTRUCTION CO.LTD

JOB DESCRIPTION:

MAKING SURE ELECTRICIANS WEAR ALL NECESSARY PROTECTIVE GEAR

PLANNED, ASSIGNED, SUPERVISED AND INSPECTED THE WORK OF ELECTRICIANS

INSTALLATION OF CABLE TRAYS, CONDUIT PIPE, INSTALLATION OF FIRE ALARM PANEL AND WIRINGS

LIGHTING INSTALLATION AND TERMINATIONS

INTERPRETING ELECTRICAL DRAWING.

ELECTRICAL FOREMAN

NOV 14, 2011 TO NOV 22, 2012

PROJECT: 4th NGL (GASCO)

AL RUWAIS ABU DHABI UAE.

COMPANY: AL HASOUN SEJONG ELECTRO MECHANICAL EST.

JOB DESCRIPTION:

TOOLBOX MEETING

PREPARATION OF MATERIALS AND TOOLS

INSTALLATION OF CABLE TRAYS SUPPORT.

INSTALLATION OF CABLE TRAYS.

INSTALLATION OF LIGHTINGS

CABLE GLANDING AND TERMINATION

CLEARING PUNCHLIST

INTERPRETING ELECTRICAL DRAWING

ELECTRICAL FOREMAN

JULY 15, 2009 TO OCT 15, 2010

PROJECT: GTL SHELL

RAS LAFFAN INDUSTRIAL CITY

STATE OF QATAR

COMPANY: QATAR KENTZ.

JOB DESCRIPTION:

INSTALLATION / SUPERVISION

TOOLBOX TALK

INSTRUCTED AND LED ELECTRICIANS CONCERNING ELECTRICAL AND INSTRUMENT PROCEDURES.

INSTALLATION AND CABLE TRAYS

INSTALLATION OF LOCAL JB

CABLE PULLING SECONDARY CABLE

GLANDING AND TRMINATION OF MOTORS, RCU, SAFETY SWITCH, LIGNTING & ETC.

CLEARING PUNCHLIST

ENTERPRETING ELECTRICAL DRAWING

ELECTRICAL FOREMAN

MAY 27, 2008 TO JAN 26, 2009

PROJECT: TASNEE HDPE LDPE

AL-JUBAIL INDUSTRIAL AREA, K.S.A

COMPANY: TECNIMONT ICB PVT. LTD

JOB DESCRIPTION:

PREPARED MATERIAL AND TOOLS LIST FOR ALL ELECTRICIANS PRIOR TO SITE WORKS.

INSTRUCTED AND LED ELECTRICIANS CONCERNING ELECTRICAL PROCEDURES.

PROVIDED AND SUGGESTED SOLUTIONS REGARDING ELECTRICAL PROBLEMS THAT AROSE DURING CONSTRUCTION DIRECTLY TO SITE ENGINEER.

ASSIGNED HDPE AREA; REACTOR, ETHYLENE, DISTILLATION, DRYER, ETC.

HIGHLY EXPERIENCE IN CABLE TRAYS LAY-OUT TO FACILITATE CABLE RUNS.

CABLE GLANDING WORKS FOR ARMOURED CABLE

INSTALL CONDUIT PIPE FOR LIGHTINGS & EARTHING CABLE

SUPERVISED INSTALLATION OF PUNCHING TRAYS, LOCAL JB, INSTRUMENT STUNCTION & TERMINATION OF INSTRUMENT CABLES IN THE AREA ASSIGNED.

SUPERVISED INSTALLATION AND MOUNTING OF INSTRUMENT EQUIPMENTS; LEVEL TRANSMITTER, PRESSURE TRANSMITTER, TEMPERATURE TRANSMITTER, FLOW TRANSMITTER, TEMPERATURE ELEMENTS ETC, AND MANUFACTURER: FISHER ROSEMOUNT.

SUPERVISED CABLE DRESSINGS, CABLE TAGGING, INSTRUMENT LABELLING, AND EARTHING

ELECTRICAL FOREMAN

JAN 1, 2006 TO JAN 30, 2008

PROJECT HAIL GENERAL HOSPITAL

HAIL K.S.A

COMPANY: AL-MASHRIK CONSTRUCTION COMPANY

JOB DESCRIPTION:

PREPARED MATERIAL AND TOOLS LIST FOR ALL ELECTRICIANS PRIOR TO SITE WORKS.

INSTRUCTED AND LED ELECTRICIANS CONCERNING ELECTRICAL PROCEDURES.

HIGHLY EXPERIENCE IN CABLE TRAYS LAY-OUT TO FACILITATE CABLE RUNS.

CABLE GLANDING WORKS FOR ARMOURED CABLE

INSTALL CONDUIT PIPE FOR LIGHTINGS & EARTHING CABLE

SUPERVISED INSTALLATION OF PUNCHING TRAYS, LOCAL JB, INSTRUMENT STUNCTION & TERMINATION OF INSTRUMENT CABLES IN THE AREA ASSIGNED.

SUPERVISED INSTALLATION AND MOUNTING OF INSTRUMENT EQUIPMENTS; LEVEL TRANSMITTER, PRESSURE TRANSMITTER, TEMPERATURE TRANSMITTER, FLOW TRANSMITTER, TEMPERATURE ELEMENTS ETC, AND MANUFACTURER: FISHER ROSEMOUNT.

SUPERVISED CABLE DRESSINGS, CABLE TAGGING, INSTRUMENT LABELLING, AND EARTHING

PROJECT INCLUDED: HAIL GENERAL HOSPITAL PROJECT, HAIL. K.S.A.

MAINTENANCE SUPERVISOR

November 1998 TO May 2005

CAPITOL TOURIST INN.

DON GIL GARCIA ST. CAPITOL SITE

CEBU CITY, PHIL.

JOB DESCRIPTION:

SUPERVISED ELECTRICAL AND GENERAL MAINTENACE WORKS INSTALLATION, CHECKING AND TESTING OF ALL

ELECTRICAL /ELECTRONIC UNITS, MOTOR, PANELS, CONTROL,

INTERCOM, TELEPHONE, CATSV, ETC.

PLUMBING AND CARPENTRY WORKS

ELECTRICAL/INSTRUMENT TECHNICIAN

MARCH 1996 – APRIL 1998

MOHAMMAD AL-MOJIL GROUP OF COMPANY

DAMMAM, KINGDOM OF SAUDI ARABIA.

JOB DESCRIPTION:

READ AND INTERPRETING BLUEPRINTS OF DRAWING AND

SPECIFICATIONS.

INSTALL CONDUIT PIPE, CABLE TRAYS, UNDREGROUND WIRING AND CABLES. INSTALL, REPLACE AND REPAIR LECTRICAL CONTROL AND PAN BOXES, SPLICE JOIN AND CONNECT WIRES,

INSTALL MOTOR SINGLE AND THREE PHASES AND CONNECT THEM, WITH TERMINATION TO JUNCTION BOX FOR INSTRUMENT UNIT, PRESSURE SWITCH TEMPERATURE LEVEL, MOV, SOLINOID VALVE, ETC.

PROJECT INCLUDED: ARAMCO PROJECT ABQAIQ PLANTS CONTROL SYSTEM MODERNIZATION.

BUILDING / INDUSTRIAL ELECTRICIAN

JAN 1994 TO DEC 1995

AROMEST AL-KHARJ, KINGDOM OF SAUDI ARABIA.

JOB DESCRIPTION:

HIGHLY EXPERIENCE IN PIPING LAY-OUT TO FACILITATE CABLE RUNS. EXAMPLE OF PIPES, RSC, EMT, PVC, AND LIQUID TIGHT FLEXIBLE.INSTALL OF CABLE TRAY PERPORATED FOR LOW- DISTRIBUTION WIRES AND TRNKING FOR LOW- CURRENT SYSTEM.

WIRING AND TERMINATION OF MOTOR CONTROLS SINGLE AND THREE PHASE. STREET LIGHTING, FIXTURES CONVINIENCE OUTLET, FIRE ALARM SYSTEM, TELEPHONE/ PBX, PUBLIC ADDRESS.

PROJECT INCLUDED: MODA AL-KHARJ PROJECT.

INDUSTRIAL ELECTRICIAN

MARCH 1988 TO JAN 1994

RUBBERWORLD PHILIPPINES INC.

CEBU PLANT MAMBALING, CEBU CITY.

JOB DESCRIPTION:

INTERPRETING ELETRICAL DRAWINGS, CONNECTING TERMINAL LEADS OF MOTOR FOR RUNNING AND REVERSING THEM.

INSTALLING WYE- DELTA CONNECTION WITH REVERSION.

TROUBLESHOOT AND ISOLATE FAULTS.

INSTALL SURFACE AMOUNT / OVERHEAD CABLES, GROUND AND BOND ELECTRICAL EQUIPMENT, ETC.

EDUCATIONAL / TRAINING / SEMINAR.

LP WORK PERMITS RECEIVER COURSE S.A PROJECT AND DESIGN AND CONSTRUCTION.

(ABQAIQ AREA LOSS PREVENTION DIVISION).

NATIONAL TRADE SKILL (NATIONAL MANPOWER AND YOUTH COUNCIL) CEBU CITY PHIL 1996.

INDUSTRIAL ELECTRICITY (DON BOSCO TECHNICAL HIGH SCHOOL) CEBU CITY, 1986.

SECONDARY EDUCATION (CSCST- PC) TUBURAN, CEBU 1985.

COLLEGE (CSCST-PC) TUBURAN, CEBU 1987.

1 YEAR INDUSTRIAL TECHNOLOGY.

PERSONAL DATA:

SEX : MALE

AGE : 52 YRS OLD

DATE OF BIRTH : AUG. 25, 1966

CIVIL STATUS : MARRIED

RELIGION : CATHOLIC



Contact this candidate