Post Job Free
Sign in

Power Plant Maintenance

Location:
Ras al-Khaimah, United Arab Emirates
Salary:
50000
Posted:
September 20, 2020

Contact this candidate

Resume:

ORCHU SREENU

Aditya Birla Group Star cement Co.LLC,

P.O Box NO.32371,

Ras Al Khaima, UAE,

Mob: +971********* & +971*********

Email: ***********@*****.***

***********@*****.***

More than 22 Years of experience in cement plants, Power Plants and Utilities

Career Objective : Seeking a challenging career with a progressive organization, this will utilize my skills, abilities.

Experience

M/s. Aditya Birla Group Star Cement Co LLC, Ras Al Khaimah, UAE (6500 TPH)

Position : Electrician (cement plant and Power plant)

Period : September 2010 to till date

1)Operation and Maintenance of cement plant

Follows approved, safe working procedures including Lock Out Tag Out, etc

Keeps work area clean and hazard free

Replaces faulty electrical components of machine such as relays, switches, and motors

Installs power wiring and conduit

H.T motors maintenance works

L.T motors overhauling

HV &LV switch gears maintenance work

EOT crane maintenance works.

2)Operation and Maintenance of Captive power plant of 40 MW.

Follows approved, safe working procedures including Lock out Tag Out, etc Operation &maintenance of Trouble shooting of Genet, motors, HV &LV switch gears,. Protection systems, control panel, synchronizing panels and Transformers Etc.

Prepare Daily report (Power Generation, Hfo, Lfo, Lube oil consumption) and enter report in SAP.

Preparing maintenance/service schedules, conducting regular calibrations to ensure the performance of various process control equipment’s.

Knowledge in Mechanical Service & Maintenance in Engine, fuel lube oil separators.

M/s. SRF LIMITED Chennai

Position : Area Leader power plant & Utility

Period : March 2010 to September 2008

Responsibilities

Operation & maintenance and service of kirlosker Engines (2*2.5MW)

M/s. Motorola India Pvt .Limited Chennai

Position : Multi Skilled Technician power plant& Utility.

Period : November 2009 to March 2010

Responsibilities

Operation Maintenance of 3*1.5 MW DG sets.

M/s. Lafarge Group Emirates cement company LLC UAE (7500TPH)

Position : Cement Plant. And Main Sub Station Technician .

Period : September 2008 to October 2009

Projects Involved:

Operation & maintenance of 132KV/11KV indoor substation and cement plant auxiliaries.

M/s. WartsilaI India Limited Chennai

Position : Electrical operator

Period : April 2001 to September 2008

Responsibilities

Operation &maintenance of 2x6.3 MW wartsila DG sets, and waste heat recovery steam boiler.

M/s. Sri Vishnu cement Limited Andhra Pradesh

Position : Electrician

Period : May 1998 to April 2001

Responsibilities

Operation Maintenance of 2x4 MW wartsila DG sets, and 4*2.0 MW Skoda Engines.

Involvement: Working in a competitive environment of facing challenges in these areas.

Cement plant H.T motors, MAN B&W, wartsila, Perkins, Kirlosker DG sets, compressor, centrifugal separators, VFD, Overhead EOT cranes etc. in power plants.

Trouble – shoot, repairs a wide range of electrical machinery, equipment and electrical instruments to ensure efficient operation and reduce production down time.

Periodical, HV/MV/LV circuit breakers, transformers, batteries, HT/LT switchgear panels.

Preparing Maintenance/Services schedules, conducting regular calibrations to ensure the performance capacity of various process control equipment’s.

Technical Education

Diploma in Electrical Engineering : 2013

ITC Electrical : 1997

Computer Knowledge : MS Office,

Languages Known : English Telugu Tamil and Hindi,

Personal Details

Date of Birth : 16/02/1980

Marital Status : Married

Nationality : Indian

Age : 39 years

Time Frame to join if selected : Two months

Place : Ras Al Khaima UAE

Date: 05/02/2020 (ORCHU SREENU)



Contact this candidate