Resume

Sign in

Qa/Qc Engineer, Planning Engineer, Electrical Engineer

Location:
Al Dafna, Qatar
Salary:
QAR 12k
Posted:
September 18, 2020

Contact this candidate

Resume:

ADZMEER SANDAG

Sr.Qa/Qc Engineer

Contact Information:

Address: Bldg 13, Zone 25, Al-Khudri St., Al-Mansoura Doha, Qatar

Phone: +974******** +974********

E-mail: adzmeer2013@ gmail.com / adzmeer2020@ gmail.com

Profile URL: http://www.linkedin.com/in/adzmeer

Career Profile:

To share & gain knowledge, experience and eventually guide and assist the Company to its highest level performance particularly in the field of Project Planning, Implementation & Supervision in compliance with the standard specification.

1.) Employment History:

12 August 2018 to : Sr. QA/QC Engineer (MEP) 30 May 2020 : Sterling & Wilson Middle East W.L.L

Projects:

A. Shield 5 Program, State of Qatar – Site 1(Project construction of the USACE Facilities)

Job Accomplishment:

Reviewed all documents submittals including issue for construction drawing, shop drawing, material submittals, requests for information (RFIs) etc., prior submitted to the contractor/consultant to ensure compliance to PQP.

Initiated a preparatory & initial phase meeting prior to start any activity on site and be informed the Client / Contractor to be present in the gathering.

Implemented the project quality plan, inspection and test plans, work procedures and method statements.

Monitored the quality of work, progress and effectiveness of the project quality management system in site implementation as per approved coordination / shop drawing.

Monitored daily incoming material inspections offsite factory visits of ongoing material production.

Assisted the Consultant in site inspection with proper coordination from site execution Team.

Ensured usage of accurate and calibrated tools and devices for inspection and measurements.

Issued, verified and closing of Non-Conformance Reports (NCR).

Initiated inspection checklist, inspection test plan for method statement of Installation and Testing & Commissioning of MEP and Telecom services.

Prepared O&M (Operation & Maintenance) manuals getting warranty material certificates from vendors, snagging and de snagging work and work handing over to client.

Attended quality control, progress, preparatory and initial phase meeting with main Contractor & Consultant.

Reported to the QA / QC Manager.

2.) Employment History:

Dec. 11, 2017 to : System Analyst

Aug 11,201 : IT Bussiness Solution Sdn Bhd, Kuala Lumpur, Malaysia

Projects: A. Project Assignment Accenture Solutions Sdn Bhd " Accenture"

3.) Employment History:

Oct. 18, 2016 to : Planning Engineer

Nov. 30, 2017 : Honey Badger Sdn Bhd, Sunway,Petaling Jaya,Malaysia,

4.) Employment History:

August 14, 2013 to : Site Electrical Engineer

Aug 13,2016 : Zuhair Fayes Partneship Consultants, Riyadh, KSA

Projects:

A.Military Industries Corporation, Phase 2 Ext. Housing Project

B.Information Technology & Community Complex (ITCC) Phase I - 17 Parcels Project

Job Accomplishment:

Reported to the MEP Manager.

Performed routine inspection in accordance with approval material list.

Inspection of electrical works based on approved shop drawing & material submittals such as cable, cable tray lighting distribution control panel & electrical equipment’s, primary and secondary power distribution, grounding system and lightning protection system.

Member of Project Construction Supervision Team in overseeing the installation & quality assurance of the MV / LV & low current electrical works, such as ; MV / LV cabling, MV / LV transformer, MV switchgear, LV busways, stand-by power generator, ATS, UPS system grounding & lightning protection system, lighting system including the lighting control devices ( DALI ), smart metering, voice & data communication system, fire alarm system, public address & voice evacuation system, integrated security (access control & CCTV cameras) system and car management system.

Ensured that the site work executed in accordance with the approved shop drawings, applicable codes & standards, and project specifications & requirements.

Coordinated with other related disciplines regarding problems encountered on site.

Reviewed interim payment evaluation in coordination with the Quantity Surveyor.

Reviewed all shop drawings, material, and samples submitted by the contractors to ensure compliance with technical specifications and ministerial requirements.

Attended and witnessed the Testing & Commissioning of the newly installed MV / LV electrical equipment's such as panel boards circuit breaker, grounding & lightning protection system and low current system (Telephone, data, fire alarm & EIB system).

Inspected connections in panel boards according to panel board schedule, and all the circuits, according to circuit color coding.

Monitored and inspected the site work & oversee the various works to ensure the quality of work & safety standard undertaken.

Prepared of the room by room electrical snag list.

Attended weekly meetings (e.g. progress meetings, coordination and specially called meetings etc.) & prepare a daily observation / weekly reports.

Inspected /checked all sample electrical components and materials submitted by contractors; ensure compliance against ministerial requirements and technical.

Reviewed Electrical As-built Drawing in conformance with the actual site installation which is provided by contractor prior to their submittal to Local Ministries for approval.

Reviewed all operation, instruction & maintenance manuals provided by contractors prior to handing over the projects to the owner / client.

5.) Employment History:

August 14, 2009 to : Planning Engineer

Aug 13,2013 : Contracting & Construction Ent.Ltd, Riyadh, KSA

Projects :

A. Saudi railway Organization - Locomotive Maintenance Facility

B. Communication & Information Technology Center(CITC Headquarter)

6.) Employment History:

Aug.12, 2008 to : Telecom Surveyor

Jan.25, 2009 : Commtrend Contractor Corporation, Manila, Philippines

Involved in the Following:

Projects: Sun Cellular, Bayantel (wireless landline), Huawei Technologies Inc., Globe Philippines Telecom

7.) May 14, 2007 up to June 2008 : Base Transceivers Station (BTS) Engineer : Hubei Telecom Engineering Co. Ltd.-Quezon City, Phils

Projects :Sun Cellular, Huawei Technologies Inc., Globe & Ericcson Philippines Telecom Projects- Manila, Philippines

8.) May 4, 2006 up to May 13, 2007 : Telecom Engineer / Telecom AutoCADD : C.S. Enriquez Mech’l Shop & Fabrication Corp. - Manila, Philippine

Projects: Sun Cellular, Huawei Technologies Inc., Globe & Ericcson Philippines Telecom Projects

9.) March 14, 2004 up to April 14, 2006 : Planning Engineer

: Al-Saloum Construction & Trading - Zamboanga City, Philippines

Projects: Residential, Commercial and school Building in western Mindanao Area

10.) 2000 to 2002 : Electronic Maintenance Supervisor

: Al-Twaik Establishment - Riyadh, KSA

Projects: Saudi Arabian National Guard Housing Projects, Dammam, Saudi Arabia

Skills:

A) Key Skills:

Supervisory skills, Analytical skills, Dedicated & Teamwork

B.) Computer Skills:

AutoCADD Application, MS Office (MS Excel, MS Word, MS Power Point Presentation, Adobe Photoshop & MS Outlook), Operating System – Windows – XP, Win-7 & Win-8 and Oracle Primavera 6(R16.2)

C.) Languages:

Conversation in English language, Tagalog & semi Spanish

D.) Achievements:

Selected as one of the best MEP Engineer and got promoted in my job in a year. Increased in materials savings cost of Company due to systematic and organized approach in providing the necessary function in a project at the lowest cost.

Membership:

Saudi Council of Engineer(SCE -KSA )

Philippine Society of Safety Practitioners-Middle East Region, K.S.A

Black Python- Martial Arts Association Inc., Central Region Chapter, K.S.A

Institute of Electronics & Communication Engineer of the Philippines, Inc (IECEP- KSA-CRC), Central Region Chapter, K.S.A

Educational & Professional Qualifications / Eligibility:

Bachelor of Science in Electronics & Communications Engineering (BSECE), Universidad de Zamboanga (formerly Zamboanga AE Colleges), Philippines, class 1997.

Career Service Professional Eligibility Rating 83.24%

SEMINARS / TRAINING WORKSHOP ATTENDED:

Management for Engineers (Oct 25, 2013) -)- IECEP-KSA-CRC@ White Palace Hotel, Riyadh, KSA.

Introduction to LEAN SIX SIGMA (Oct 25, 2013) - IECEP-KSA-CRC@ White Palace Hotel, Riyadh, KSA.

Industrial Lighting Application of TES-P-119.25 Rev01 using DIALux 4.12 (Mar 6,2015)- Institute of Integrated Electrical Engineers @White Palace Hotel, Riyadh, KSA

Intensive 35 Hours Training on Project Management workshop (18th June,2015 up to 27th June,2015), Knowledge Square Training Center, Riyadh, KSA

Classroom Training (12 Feb 2018 up to 2 Mar 2018), Accenture Malaysia- Honey Badger Project, KL-Malaysia



Contact this candidate