Post Job Free
Sign in

Safety Industrial Training

Location:
Hyderabad, Telangana, India
Posted:
September 16, 2020

Contact this candidate

Resume:

Application for the post of : OFFSHOR PIPE FITTER

Name : Dungala Rajunaidu

Father's Name : Yerranna

Mother's Name : Atchiyyamma

Wife's Name : Ramanamma

Marital Status : Married

Date of birth : 6th August 1977

Present Address : Door no: 6-49-14/1/A

Srinivasa nagar, Driver's colony, Near twinkle

kids school,

Visakhapatnam-530026,

Andhra Pradesh. India.

Permanent Address : Bapirajukothapalli (po & village)

Kotauratla (madalam)

Visakhapatnam - 531085

Andhra Pradesh, INDIA.

Contact Telephone No. : +91-986******* WHATS APP

+91-798*******

e-mail ***************@*****.***

**************@*****.***

Skype ID rajaramani_2012

Passport details:

Passport No : Z3759667

Date of issue : 29/06/2016

Date of expiry : 28/06/2026

Place of issue : Brunei Darussalam

Languages Known : English, Hindi, Telugu, Tamil & Malayalam

Educational Qualification: (Academic/Technical)

SlN Name of the Period of Study / Place

o Institute / Course Training

1. Board of Secondary ZP High School,

Education (SSC) Govt. of March 1991 to March Vemulapudi,

Andhra Pradesh -INDIA 1992 Visakhapatnam,

Secondary School Andhra Pradesh - INDIA

Certificate

2. National Trade Certificate August 1992 to July Sri Bhushan ITI,

(I.T.I.) 1994 Narsipatnam

Fitter & (N.C.V.T) Visakhapatnam - Dist,

Government of INDIA Andhra Pradesh - INDIA

Microsoft office, Auto Cad December 2001 to March Global net Software

3. from Global Software 2002 Solutions

Solutions, VSP, Andhra (Vacation period) Visakhapatnam

Pradesh, India.

4. Alberta Innovation and July 18 2014 Apprenticeship and

Advanced education To Industry Training,

& July 18 2015 10th floor, Commerce

Apprenticeship and Industry place,

Training. 10155-102 Street NW

AAIT ID # 007-4/996837 Edmonton - Alberta

TSJ4L5

Canada. Phone

:780-***-****.

Additional Qualifications / Trainings

Sl Name of the Period of Study / Place

No Institute / Course Training

1 Soroosh and Nowrooz 12 November 2002 to NPCC - Abu Dhabi, U A

Interated Developnment 19 November 2002 E.

Project

2 Agnel Industrial Training 27 August 2007 INDIA

Institute

3 T BOSIET(OPITO APPROVED) 8TH Oct 2013 to 9th Oct Enter tech world

SAFETY TRAINING 2017 class safety training

QATAR.

4 International Certificate 01 May 2015 to 30 Apr Port Health Officer

of Vaccination OR 2025 Visakhapatnam,India

Prophylaxis (YELLOW FEVER)

5 T BOSIET (OPITO APPROVED) 31 OCT 2015 UP TO Oct MEGAMASS SDN BHD.

SAFETY TRAINING. 30 2019 BRUNEI.

6 IMIST (OPITO APPROVED) 28 Feb 2018 UP TO Feb Atlas interactive

SAFETY TRAINING. 27 2022 (INTL)

7 Indos Number 18HL6109 DG Shipping Mumbai

8 STCW 2010 1) FPFF 2) PSSR 3) Behara institute of

PST maritime training

4) STSDS 5) EFA Approved by DG

Start date : 16 April Shipping Mumbai

2018

End date : 30 April

2018

Experience in India: 54 Months

S.No Name of the In Charge Period of Period of Position held

Organization Name/ Phone months Service

No.

1. Mamaka Constructions R.Apparao 10 Months 03.08.1994 Pipe Fitter

Door no . 60-6-15, 009*-********* to

Malkapuram, 9 26.06.1995

Visakhapatnam -

530011

Hindustan Petroleum

corporation ltd.

2. Kranthi constructions G.Baburao 24 Months 10.11.1995 Pipe Fitter

009*-********* to

Door no. 5 24.11.1997

MIG-1/22,Vuda colony,

Chinagantyada,

Gajuwaka,Visakhapatna

m-26.

Hindustan petroleum

corporation limited.

3. Sri Durga Bhavani R.Apparao 11 Months 15th Dec Pipe Fabricator

Engg.Works +917********* 2008

Block-4, Autonagar, To

VSP-12 25th April

2010

4. Sri Durga Bhavani R.Apparao 15 Months 12 May2014 Pipe

Engg.works +917********* Fabricator

Block-4,Autonagar,VSP To

-12 14 Sep

2015

Experience in Abroad: 146 Months in Abu Dhabi in the National Petroleum

Construction Company (NPCC) (Engineering, Procurement, Construction,

Installation and Commissioning Works for Onshore and Offshore Oil & Gas

Projects related to Jackets, Piles, Decks, Bridges, Accommodation Modules,

Flares, Tanks, Pressure Vessels & Pipelines etc)

S. No In Charge Name/ Period of Period of Position

Phone No. months Service held

1. OCS Services DMCC Antony 24 Months 14 Feb pipe Fitter

Vessels name:Espoir (Supervisor ) 2018

(FPSO) Contact no: + To

Location : Abidjan 919*********-** Mar

offshore (WhatsApp ) 2018

2. ADININ WORKS & +673-*******-** Months 31 Oct Pipe/Marker

ENGINEERING SDN BHD. 2015 Fitter

Under BRUNEI SHELL To I D NO: AWE

PETROLEUM SDN BHD. 05 JAN 1173

BRUNEI OFFSHORE. 2018

3. Hyundai Heavy Suresh project 6 Months 7th Oct Pipe

industries co.ltd; Manger 2013 Fabricator

uder Qatar kentz Ph To I D NO: RO

engineering no:+974******** 9th April 121

contractors Barzan Office:+974*****-****

offshore. 216

Qatar.

4. Abu Dhabi Marine Fasial Alqasimi 27 Months 1ST Pipe

Operating Company (ADMA Rep) MAY2010 Fabricator

& AL Guweifat To Optima no:

Under AL Melehy Barge offshore 09 Sep 120282

Trading Oil Field 009***********,U 2012

services company. ae.

5. J & M Marine & TOM CHAUK 15 Months 05thsep200 Fabricator

Industrial, LLC +1-281-***-**** 7

9136 Heather lane, To

Moss point, 03 Dec

Ms 39562, U S A. 2008

6. Lamprell Dubai LLC Alex vidhyan 26 Months 24thoct Fabricator

PO.BOX -6941, Manger 2004 Badge no:

Sharjah, +971-**-******* To 1378

U.A E. 26thjuly20

Tel :+971********-**

7. National Petroleum Manilal Patel - 72 months & 30.4.1998 Pipe Fitter

Construction Company Supervisor Days 2199 To Badge no:

+971-**-******* Per day 10 09 May2004 23212

Head office: hours

Post Box No: 2058 working

ABU DHABI - U A E

Tel: 00971 2 554

9000

Fax:009**-*-***-****

Web-site:

www.npcc.ae

Responsibilities :

. Safety is First Priority

. Individual handling and reporting the status to Supervisor/ Engineer

during execution of different Projects

. Co-ordinate with Clients / QC Inspectors / Construction Engineers

Duties :

. Good knowledge to read and understand ISO metrics, P&ID, Structural

and Mechanical drawings

. Fabrication of Pipe spool such as cutting, grinding, beveling of pipe

and joints fitting fit up as per construction procedures / shop

drawings

. Lay out reference points and patterns on heavy metal according to

component specifications

. Installation of spools as per PID & ISO metric drawing

. Pipe supports fabrication and installation

. Hydro testing of pipe spools and pipe lines as required bar pressure

with all safety precautions / procedures

. Flushing and reinstating of spools after hydro testing

. Preservation of valves, hubs and bolts for commissioning

. Punch list clearance of piping as per QC Inspector instruction

. Preparation of Material Take-Off (MTO), Bill of Quantity (BOQ) from

detailed shop drawings

. Knowledge of the International codes (i.e. API, ASTM, ANSI, DIN, BS

Codes)

Projects Worked:

Abu Dhabi Marine Operating Company - ADMA OPCO

Gas Processing Facilities (GPF) Project, Technip/NPCC (jv)

NPCC Project No. 6060 - Abu Dhabi-UAE

Fabrication, Onshore Commissioning, Load out, Sea Fastening Transportation to

Company's designated Offshore Location, Installation & Hook-up and

Commissioning of the Platform.

Shell - Soroosh and Nowrooz Integrated development Phase I (Technip/NPCC)

Abu Dhabi, UAE (NPCC Project-111)

An EPICM contract with SHELL (SIOL) under a service contract with National

Iranian Oil Company (NIOC). The Project includes the Fabrication,

Transportation, Installation, Pre-commissioning and Commissioning of Wellhead

Platforms, Living Quarters, Production Platforms, Bridges, Pipelines etc.

Regards

(DUNGALA RAJUNAIDU)



Contact this candidate