Application for the post of : OFFSHOR PIPE FITTER
Name : Dungala Rajunaidu
Father's Name : Yerranna
Mother's Name : Atchiyyamma
Wife's Name : Ramanamma
Marital Status : Married
Date of birth : 6th August 1977
Present Address : Door no: 6-49-14/1/A
Srinivasa nagar, Driver's colony, Near twinkle
kids school,
Visakhapatnam-530026,
Andhra Pradesh. India.
Permanent Address : Bapirajukothapalli (po & village)
Kotauratla (madalam)
Visakhapatnam - 531085
Andhra Pradesh, INDIA.
Contact Telephone No. : +91-986******* WHATS APP
e-mail ***************@*****.***
**************@*****.***
Skype ID rajaramani_2012
Passport details:
Passport No : Z3759667
Date of issue : 29/06/2016
Date of expiry : 28/06/2026
Place of issue : Brunei Darussalam
Languages Known : English, Hindi, Telugu, Tamil & Malayalam
Educational Qualification: (Academic/Technical)
SlN Name of the Period of Study / Place
o Institute / Course Training
1. Board of Secondary ZP High School,
Education (SSC) Govt. of March 1991 to March Vemulapudi,
Andhra Pradesh -INDIA 1992 Visakhapatnam,
Secondary School Andhra Pradesh - INDIA
Certificate
2. National Trade Certificate August 1992 to July Sri Bhushan ITI,
(I.T.I.) 1994 Narsipatnam
Fitter & (N.C.V.T) Visakhapatnam - Dist,
Government of INDIA Andhra Pradesh - INDIA
Microsoft office, Auto Cad December 2001 to March Global net Software
3. from Global Software 2002 Solutions
Solutions, VSP, Andhra (Vacation period) Visakhapatnam
Pradesh, India.
4. Alberta Innovation and July 18 2014 Apprenticeship and
Advanced education To Industry Training,
& July 18 2015 10th floor, Commerce
Apprenticeship and Industry place,
Training. 10155-102 Street NW
AAIT ID # 007-4/996837 Edmonton - Alberta
TSJ4L5
Canada. Phone
Additional Qualifications / Trainings
Sl Name of the Period of Study / Place
No Institute / Course Training
1 Soroosh and Nowrooz 12 November 2002 to NPCC - Abu Dhabi, U A
Interated Developnment 19 November 2002 E.
Project
2 Agnel Industrial Training 27 August 2007 INDIA
Institute
3 T BOSIET(OPITO APPROVED) 8TH Oct 2013 to 9th Oct Enter tech world
SAFETY TRAINING 2017 class safety training
QATAR.
4 International Certificate 01 May 2015 to 30 Apr Port Health Officer
of Vaccination OR 2025 Visakhapatnam,India
Prophylaxis (YELLOW FEVER)
5 T BOSIET (OPITO APPROVED) 31 OCT 2015 UP TO Oct MEGAMASS SDN BHD.
SAFETY TRAINING. 30 2019 BRUNEI.
6 IMIST (OPITO APPROVED) 28 Feb 2018 UP TO Feb Atlas interactive
SAFETY TRAINING. 27 2022 (INTL)
7 Indos Number 18HL6109 DG Shipping Mumbai
8 STCW 2010 1) FPFF 2) PSSR 3) Behara institute of
PST maritime training
4) STSDS 5) EFA Approved by DG
Start date : 16 April Shipping Mumbai
2018
End date : 30 April
2018
Experience in India: 54 Months
S.No Name of the In Charge Period of Period of Position held
Organization Name/ Phone months Service
No.
1. Mamaka Constructions R.Apparao 10 Months 03.08.1994 Pipe Fitter
Door no . 60-6-15, 009*-********* to
Malkapuram, 9 26.06.1995
Visakhapatnam -
530011
Hindustan Petroleum
corporation ltd.
2. Kranthi constructions G.Baburao 24 Months 10.11.1995 Pipe Fitter
Door no. 5 24.11.1997
MIG-1/22,Vuda colony,
Chinagantyada,
Gajuwaka,Visakhapatna
m-26.
Hindustan petroleum
corporation limited.
3. Sri Durga Bhavani R.Apparao 11 Months 15th Dec Pipe Fabricator
Engg.Works +917********* 2008
Block-4, Autonagar, To
VSP-12 25th April
2010
4. Sri Durga Bhavani R.Apparao 15 Months 12 May2014 Pipe
Engg.works +917********* Fabricator
Block-4,Autonagar,VSP To
-12 14 Sep
2015
Experience in Abroad: 146 Months in Abu Dhabi in the National Petroleum
Construction Company (NPCC) (Engineering, Procurement, Construction,
Installation and Commissioning Works for Onshore and Offshore Oil & Gas
Projects related to Jackets, Piles, Decks, Bridges, Accommodation Modules,
Flares, Tanks, Pressure Vessels & Pipelines etc)
S. No In Charge Name/ Period of Period of Position
Phone No. months Service held
1. OCS Services DMCC Antony 24 Months 14 Feb pipe Fitter
Vessels name:Espoir (Supervisor ) 2018
(FPSO) Contact no: + To
Location : Abidjan 919*********-** Mar
offshore (WhatsApp ) 2018
2. ADININ WORKS & +673-*******-** Months 31 Oct Pipe/Marker
ENGINEERING SDN BHD. 2015 Fitter
Under BRUNEI SHELL To I D NO: AWE
PETROLEUM SDN BHD. 05 JAN 1173
BRUNEI OFFSHORE. 2018
3. Hyundai Heavy Suresh project 6 Months 7th Oct Pipe
industries co.ltd; Manger 2013 Fabricator
uder Qatar kentz Ph To I D NO: RO
engineering no:+974******** 9th April 121
contractors Barzan Office:+974*****-****
offshore. 216
Qatar.
4. Abu Dhabi Marine Fasial Alqasimi 27 Months 1ST Pipe
Operating Company (ADMA Rep) MAY2010 Fabricator
& AL Guweifat To Optima no:
Under AL Melehy Barge offshore 09 Sep 120282
Trading Oil Field 009***********,U 2012
services company. ae.
5. J & M Marine & TOM CHAUK 15 Months 05thsep200 Fabricator
Industrial, LLC +1-281-***-**** 7
9136 Heather lane, To
Moss point, 03 Dec
Ms 39562, U S A. 2008
6. Lamprell Dubai LLC Alex vidhyan 26 Months 24thoct Fabricator
PO.BOX -6941, Manger 2004 Badge no:
Sharjah, +971-**-******* To 1378
U.A E. 26thjuly20
Tel :+971********-**
7. National Petroleum Manilal Patel - 72 months & 30.4.1998 Pipe Fitter
Construction Company Supervisor Days 2199 To Badge no:
+971-**-******* Per day 10 09 May2004 23212
Head office: hours
Post Box No: 2058 working
ABU DHABI - U A E
Tel: 00971 2 554
9000
Fax:009**-*-***-****
Web-site:
www.npcc.ae
Responsibilities :
. Safety is First Priority
. Individual handling and reporting the status to Supervisor/ Engineer
during execution of different Projects
. Co-ordinate with Clients / QC Inspectors / Construction Engineers
Duties :
. Good knowledge to read and understand ISO metrics, P&ID, Structural
and Mechanical drawings
. Fabrication of Pipe spool such as cutting, grinding, beveling of pipe
and joints fitting fit up as per construction procedures / shop
drawings
. Lay out reference points and patterns on heavy metal according to
component specifications
. Installation of spools as per PID & ISO metric drawing
. Pipe supports fabrication and installation
. Hydro testing of pipe spools and pipe lines as required bar pressure
with all safety precautions / procedures
. Flushing and reinstating of spools after hydro testing
. Preservation of valves, hubs and bolts for commissioning
. Punch list clearance of piping as per QC Inspector instruction
. Preparation of Material Take-Off (MTO), Bill of Quantity (BOQ) from
detailed shop drawings
. Knowledge of the International codes (i.e. API, ASTM, ANSI, DIN, BS
Codes)
Projects Worked:
Abu Dhabi Marine Operating Company - ADMA OPCO
Gas Processing Facilities (GPF) Project, Technip/NPCC (jv)
NPCC Project No. 6060 - Abu Dhabi-UAE
Fabrication, Onshore Commissioning, Load out, Sea Fastening Transportation to
Company's designated Offshore Location, Installation & Hook-up and
Commissioning of the Platform.
Shell - Soroosh and Nowrooz Integrated development Phase I (Technip/NPCC)
Abu Dhabi, UAE (NPCC Project-111)
An EPICM contract with SHELL (SIOL) under a service contract with National
Iranian Oil Company (NIOC). The Project includes the Fabrication,
Transportation, Installation, Pre-commissioning and Commissioning of Wellhead
Platforms, Living Quarters, Production Platforms, Bridges, Pipelines etc.
Regards
(DUNGALA RAJUNAIDU)