Michael Ikechukwu Onogwu
**, ***** ******* ******, *****, Maryland, Lagos State, Nigeria.
*************@*****.***
Personal information :
Date of Birth: 10th July,1983
Sex: Male
Nationality: Nigerian
CAREER SUMMARY
Senior geologist with year’s experience, specialization in the aspect of exploration of hydrocarbons, particularly petroleum.Experience in offshore and onshore Well site Geology and Measurement While Drilling and Logging activities, database management with good understanding of technical principle of Field operations, Log measurements and HPHT experience.
Also take direct responsibility for all geological services at the rig-site. In full charge of any other geologically related aspects of the drilling operation just before, during and immediately after the drilling of an oil or gas well.
Pre-well responsibilities: Personnel mobilization; reviewing all available information and data as they relate specifically to the well (well to well correlations, pressure regimes, lithology, faults and faulting features); office preparation; safety requirements; and preparation of materials / equipment for shipment.
Syn-well responsibilities: Data collection, management and syntheses; Data quality control aspects; and Geological and Geophysical contractors’ management.
Post-well responsibilities: Shipment of geological materials out of the rig; preparation of end of well reports; and generation of master geological logs.
Work Experience:
Sept. 2011 till date Chevron Nigeria Limited (Senior Geologist)
2, Chevron Drive,Lekki Peninsula, Lagos State.
Develop work scopes for contract bids relating to subsurface operations and analyses.
Assess service contractors’ performances through Pre-qualification, Technical and Commercial stages during NAPIMS bid openings.
Develop Geological End of Well reports (EOWRs) as part of Phase 5 CPDEP requirements.
Assess and revalidating service contractor’s tickets and invoices for onward payments.
Properly land horizontal wells and geosteer same using LWD data and images.
Provide QC of bit direction (inclination and azimuth) as per well program.
Provide QC of all reports supplied by service partners.
Chevron Nigeria Limited (Wellsite geologist)
2, Chevron Drive,Lekki Peninsula, Lagos State.
Supervise and review work deliverables relating to mud logging, MWD/LWD, wire line, coring and biostratigraphy operations at the rig site.
Evaluating offset data before the start of drilling
Comparing actual data gathered during drilling with well prognosis
Advising on drilling hazards and drilling bit optimization.
Geosteering of horizontal and deviated wells. Interpret drilling parameters, such as rate of penetration, torque, pump pressure, and pit volumes.
Carrying out hole stability/pore pressure estimations.
Advising operations personnel on-site and in the operations office.
Advising operation team on the critical decisions including well suspension or deepening
Keeping detailed records, writing reports, completing daily, weekly, and post-well reporting logs, and sending these to base office
Describe cuttings and core samples while maintaining most current lithology log.
Provide continuous qualitative evaluation of relative overbalance and estimation of pore pressure from drilling parameters, well logs and shale density.
Interpret and report hydrocarbon shows.
Determine accurate casing and coring point selection.
Ensuring compliance with all company’s policy on safety, health and environment
Achieving the geological objectives set forth in the Drilling Program
Ensuring that Contractors equipment and materials meet contractual specifications
Monitoring and supervising the sample collection process and dispatch of formation evaluation samples Safe-guarding the collection, storage and transmission of information and reports at the well-site
Ensuring well is drilled in the most safe, efficient and cost effective manner, using maximum amount of substance information under prevailing drilling conditions.
Aug.2008-Sept. 2011 Professionals Experts and Energy Company (Geoscientist)
4D, Agbokoda Street, Parkview Estate, Ikoyi, Lagos.
Petrophysical analysis of well data
Integration of seismic data
Development of well reports as per client’s specification.
Well site / Operations experience:
Date
Country/Client/Rig
Field/Well
Well Type
Rig type / Water depth
Location / E.O. D
October, 2011
Nigeria/ Chevron/ Pacific Bora
Agbami/AGB-25 &25ST
Exploratory/Producer
Drillship / +4,800ft
Gulf of Guinea/ Turbidites
November, 2011
Nigeria/ Chevron/ Pacific Bora
Agbami/AGB-25A & 25AST
Exploratory/Producer
Drillship / +4,800ft
Gulf of Guinea/ Turbidites
January, 2012
Nigeria/ Chevron/ KS Endeavour
Funiwa/FUN Deep-1A
Exploratory/Appraisal
Jack-up / +82ft
Niger Delta/ Fluvio-deltaic
April, 2012
Nigeria/ Chevron/ Pacific Bora
Agbami/Agbami-22UC
Injector
Drillship / +4,800ft
Gulf of Guinea/ Turbidites
July, 2012
Nigeria/ Chevron/ Pacific Bora
Agbami/ Agbami- 23
Injector
Drillship / +4,800ft
Gulf of Guinea/ Turbidites
November, 2012
Nigeria/ Chevron/ Pacific Bora
Agbami/ Agbami-28
Producer
Drillship / +4,800ft
Gulf of Guinea/ Turbidites
February, 2013
Nigeria/ Chevron/ Pacific Bora
Agbami/ Agbami-23B
Injector
Drillship / +4,800ft
Gulf of Guinea/ Turbidites
July, 2013
Nigeria/ Chevron/ Pacific Bora
Agbami/ Agbami-26
Producer
Drillship / +4,800ft
Gulf of Guinea/ Turbidites
September, 2013
Nigeria/ Chevron/ Pacific Bora
Agbami/ Agbami-29
Producer
Drillship / +4,800ft
Gulf of Guinea/ Turbidites
October, 2013
Nigeria/ Chevron/ Adriatic 9
Meren/ Meren-113
Producer
Jack-up/ +42ft
Niger Delta/ Fluvio-deltaic
November, 2013
Nigeria/ Chevron/ Adriatic 9
Meren/ Meren-114
Injector
Jack-up/ +44ft
Niger Delta/ Fluvio-deltaic
December, 2013
Nigeria/ Chevron/ Adriatic 9
Meren/ Meren-115H
Producer
Jack-up/ +45ft
Niger Delta/ Fluvio-deltaic
December, 2013
Nigeria/ Chevron/ Pacific Khamsin
Agbami/ WDL6 PH
Pilot hole
Drillship/ +5100ft
Gulf of Guinea/ Turbidites
January, 2014
Nigeria/ Chevron/ Adriatic 9
Meren/ Meren-116i
Producer
Jack-up/ +42ft
Niger Delta/ Fluvio-deltaic
February, 2014
Nigeria/ Chevron/ Pacific Bora
Agbami/ Agbami-31
Producer
Drillship / +4,800ft
Gulf of Guinea/ Turbidites
April, 2014
Nigeria/ Chevron/ Pacific Khamsin
Agbami/ Agbami-32
Injector
Drillship / +4,900ft
Gulf of Guinea/ Turbidites
June, 2014
Nigeria/ Chevron/ Pacific Khamsin
Aparo/ Aparo-04
Exploratory
Drillship / +3,800ft
Niger Delta/ Confined channel complexes
July, 2014
Nigeria/ Chevron/ Pacific Bora
Agbami/ Agbami-30
Injector
Drillship / +4,800ft
Gulf of Guinea/ Turbidites
August, 2014
Nigeria/ Chevron/ Pacific Khamsin
Agbami/ Agbami-33
Producer
Drillship / +4,800ft
Gulf of Guinea/ Turbidites
September, 2014
Nigeria/ Chevron/ Pacific Bora
Agbami/ Agbami-34
Injector
Drillship / +4,900ft
Gulf of Guinea/ Turbidites
November, 2014
Nigeria/ Chevron/ Pacific Khamsin
Nsiko-North 1X/ Nsiko North
Exploratory
Drillship / +6,800ft
Niger Delta/ Confined channel complexes
January, 2015
Nigeria/ Chevron/ Pacific Bora
Agbami/ Agbami-26A
Producer
Drillship / +4,900ft
Gulf of Guinea/ Turbidites
February, 2015
Nigeria/ Chevron/ Pacific Khamsin
Agbami/ Agbami-35
Producer
Drillship / +4,800ft
Gulf of Guinea/ Turbidites
March, 2015
Nigeria/ Chevron/ Pacific Khamsin
Agbami/ Agbami-37
Producer
Drillship / +4,800ft
Gulf of Guinea/ Turbidites
April, 2015
Nigeria/ Chevron/ Pacific Bora
Agbami/ Agbami-36
Producer
Drillship / +4,900ft
Gulf of Guinea/ Turbidites
May, 2015
Nigeria/ Chevron/ Pacific Khamsin
Agbami/ Agbami-38
Producer
Drillship / +4,800ft
Gulf of Guinea/ Turbidites
August, 2015
Nigeria/ Chevron/ Pacific Khamsin
Ofigbo 1X/ Ofigbo
Exploratory
Drillship / +5,900ft
Niger Delta/ Confined channel complexes
December, 2015
Nigeria/ Chevron/ OES Respect
Gbokoda / Gbokoda-60
Producer
Barge / +13ft
Niger Delta/ Shoreface & Tidal deposits
January, 2016
Nigeria/ Chevron/ Pacific Khamsin
Nsiko-North 1X/ Nsiko North
Exploratory
Drillship / +6,800ft
Niger Delta/ Confined channel complexes
February, 2016
Nigeria/ Chevron/ OES Respect
Gbokoda / Gbokoda-61
Producer
Barge / +13ft
Niger Delta/ Shoreface & Tidal deposits
March, 2016
Nigeria/ Chevron/ OES Respect
Gbokoda / Gbokoda-62P
Producer
Barge / +13ft
Niger Delta/ Shoreface & Tidal deposits
April, 2016
Nigeria/ Chevron/ Pacific Bora
Agbami/ Agbami-39
Producer
Drillship / +4,900ft
Gulf of Guinea/ Turbidites
May, 2016
Nigeria/ Chevron/ OES Respect
Gbokoda / Gbokoda-63H
Producer
Barge / +13ft
Niger Delta/ Shoreface & Tidal deposits
June, 2016
Nigeria/ Chevron/ Trident VIII
Okan / Okan-139H
Producer
Jack-up/ +18ft
Niger Delta/ Shoreface & fluvial deposits
July, 2016
Nigeria/ Chevron/ Pacific Bora
Agbami/ Agbami-40
Producer
Drillship / +4,900ft
Gulf of Guinea/ Turbidites
August, 2016
Nigeria/ Chevron/ OES Respect
Gbokoda / Gbokoda-66H
Producer
Barge / +13ft
Niger Delta/ Shoreface & Tidal deposits
September, 2016
Nigeria/ Chevron/ Trident VIII
Okan / Okan-140H
Producer
Jack-up/ +18ft
Niger Delta/ Shoreface & fluvial deposits
October, 2016
Nigeria/ Chevron/ OES Respect
Gbokoda / Gbokoda-68H
Producer
Barge / +15ft
Niger Delta/ Shoreface & Tidal deposits
November, 2016
Nigeria/ Chevron/ Trident VIII
Okan / Okan-141H
Producer
Jack-up/ +18ft
Niger Delta/ Shoreface & fluvial deposits
December, 2016
Nigeria/ Chevron/ OES Respect
Gbokoda / Gbokoda-70Hi
Water injector
Barge / +15ft
Niger Delta/ Shoreface & Tidal deposits
January, 2017
Nigeria/ Chevron/ OES Respect
Gbokoda / Gbokoda-71Hi
Water injector
Barge / +15ft
Niger Delta/ Shoreface & Tidal deposits
February, 2017
Nigeria/ Chevron/ Trident VIII
Sonam / Sonam-05
Producer (NAG)
Jack-up/ +195ft
Niger Delta/ Marine shelf
March, 2017
Nigeria/ Chevron/ OES Respect
Gbokoda / Gbokoda-73H
Producer
Barge / +15ft
Niger Delta/ Shoreface & Tidal deposits
April, 2017
Nigeria/ Chevron/ OES Respect
Gbokoda / Gbokoda-74H
Producer
Barge / +15ft
Niger Delta/ Shoreface & Tidal deposits
May, 2017
Nigeria/ Chevron/ Trident VIII
Sonam / Sonam-06
Producer (NAG)
Jack-up/ +195ft
Niger Delta/ Marine shelf
June, 2017
Nigeria/ Chevron/ OES Respect
Gbokoda / Gbokoda-76H
Producer
Barge / +15ft
Niger Delta/ Shoreface & Tidal deposits
July, 2017
Nigeria/ Chevron/ OES Respect
Gbokoda / Gbokoda-77H
Producer
Barge / +15ft
Niger Delta/ Shoreface & Tidal deposits
August, 2017
Nigeria/ Chevron/ Trident VIII
Sonam / Sonam-07
Producer (NAG)
Jack-up/ +195ft
Niger Delta/ Marine shelf
September, 2017
Nigeria/ Chevron/ OES Respect
Gbokoda / Gbokoda-79H
Producer
Barge / +15ft
Niger Delta/ Shoreface & Tidal deposits
October, 2017
Nigeria/ Chevron/ ENSCO DS4
Agbami / Agbami-42
Producer
Drillship / +4,900ft
Gulf of Guinea/ Turbidites
November, 2017
Nigeria/ Chevron/ Trident VIII
Sonam / Sonam-08
Producer (NAG)
Jack-up/ +195ft
Niger Delta/ Marine shelf
December, 2017
Nigeria/ Chevron/ OES Respect
Gbokoda / Gbokoda-80H ST2
Producer
Barge / +15ft
Niger Delta/ Shoreface & Tidal deposits
January, 2018
Nigeria/ Chevron/ ENSCO DS4
Agbami / Agbami-41
Producer
Drillship / +4,600ft
Gulf of Guinea/ Turbidites
February, 2018
Nigeria/ Chevron/ Shelf Drilling Resourceful
Meji / Meji-58H
Producer
Jack-up/ +30ft
Niger Delta/ Shoreface & transition deposits
March, 2018
Nigeria/ Chevron/ ENSCO DS4
Agbami / Agbami-43
Producer
Drillship / +4,600ft
Gulf of Guinea/ Turbidites
April, 2018
Nigeria/ Chevron/ OES Respect
Dibi / Dibi-40H
Producer
Barge / +15ft
Niger Delta/ Shoreface & Tidal deposits
May, 2018
Nigeria/ Chevron/ ENSCO DS4
Agbami / Agbami-44
Producer
Drillship / +4,600ft
Gulf of Guinea/ Turbidites
June, 2018
Nigeria/ Chevron/ Shelf Drilling Resourceful
Meji / Meji-59P
Producer
Jack-up/ +30ft
Niger Delta/ Shoreface & transition deposits
July, 2018
Nigeria/ Chevron/ Shelf Drilling Resourceful
Meji / Meji-59H
Producer
Jack-up/ +30ft
Niger Delta/ Shoreface & transition deposits
August, 2018
Nigeria/ Chevron/ OES Respect
Abiteye / Abiteye-27
Producer (NAG)
Barge / +15ft
Niger Delta/ Shoreface & Tidal deposits
September, 2018
Nigeria/ Chevron/ Shelf Drilling Resourceful
Sonam / Sonam-09
Producer (NAG)
Jack-up/ +195ft
Niger Delta/ Marine shelf
October, 2018
Nigeria/ Chevron/ Shelf Drilling Resourceful
Sonam / Sonam-10
Producer (NAG)
Jack-up/ +195ft
Niger Delta/ Marine shelf
November, 2018
Nigeria/ Chevron/ Shelf Drilling Resourceful
Sonam / Sonam-11
Producer (NAG)
Jack-up/ +195ft
Niger Delta/ Marine shelf
December, 2018
Nigeria/ Chevron/ OES Respect
Dibi / Dibi-41
Producer
Barge / +15ft
Niger Delta/ Shoreface & Tidal deposits
January, 2019
Nigeria/ Chevron/ Shelf Drilling Resourceful
Meren / Meren-117S
Water Source
Jack-up/ +50ft
Niger Delta/ Fluvio-deltaic
February, 2019
Nigeria/ Chevron/ Shelf Drilling Resourceful
Meren / Meren-118S
Water Source
Jack-up/ +50ft
Niger Delta/ Fluvio-deltaic
March, 2019
Nigeria/ Chevron/ OES Respect
Dibi / Dibi-42
Producer
Barge / +15ft
Niger Delta/ Shoreface&Tidal deposits
April, 2019
Nigeria/ Chevron/ OES Respect
Dibi / Dibi-43
Producer
Barge / +15ft
Niger Delta/ Shoreface& Tidal deposits
May, 2019
Nigeria/ Chevron/ Shelf Drilling Resourceful
Okan / Okan-143
NAG
Jack-up/ +18ft
Niger Delta/ Shoreface& fluvial deposits
June, 2019
Nigeria/ Chevron/ ENSCO DS4
Agbami / Agbami-47
Producer
Drillship / +4,600ft
Gulf of Guinea/ Turbidites
July, 2019
Nigeria/ Chevron/ OES Respect
Dibi / Dibi-44
Producer
Barge / +15ft
Niger Delta/ Shoreface& Tidal deposits
August, 2019
Nigeria/ Chevron/ Shelf Drilling Resourceful
Opolo / Opolo-6STH
Producer
Jack-up/ +48ft
Niger Delta/ Fluvio-deltaic
September, 2019
Nigeria/ Chevron/ OES Respect
Dibi / Dibi-46H
Producer
Barge / +15ft
Niger Delta/ Shoreface& Tidal deposits
October, 2019
Nigeria/ Chevron/ Shelf Drilling Resourceful
Okan / Okan144H
Producer
Jack-up/ +50ft
Niger Delta/ Fluvio-deltaic
November, 2019
Nigeria/ Chevron/ OES Respect
Dibi / Dibi-45H
Producer
Barge / +15ft
Niger Delta/ Shoreface& Tidal deposits
December, 2019
Nigeria/ Chevron/ Shelf Drilling Resourceful
Okan / Okan145H
Producer
Jack-up/ +50ft
Niger Delta/ Fluvio-deltaic
Education:
2018 MSc Petroleum Engineering.
University of Benin, Edo State, Nigeria
2014 University of Benin
Post Graduate Diploma Petroleum Engineering
2006 BSc (Applied Physics) Geophysics
Ambrose Alli University. Edo State, Nigeria
2008 National Youth Service Corps (NYSC)
Software Proficiency:
Master Geo(WellsiteGeology)
Training/Courses:
2018 Basic Offshore Safety Induction and Emergency Training (BOSIET)
Tolmann Allied Services.
58 TransAmadi Industrial Layout. Port Harcourt.
2016 Wellbore Stability and Geomechanics
Chevron Nigeria Limited
2, Chevron Drive, Lekki-Epe Expressway, Lekki, Lagos State.
2008 Solving Petrophysical Problems using Landmark’s Geographix Discovery
Geoscience Solutions
115, MoshoodAbiola Way, Ebute-Metta, Lagos State
Professional Affiliations:
Member American Association of Petroleum Geologists (AAPG)
Member Nigerian Association of Petroleum Geologists (NAPE)
Member Nigerian Mining and Geosciences Society (NMGS)