Drew Anderson
***** **** **** *****, ******* TX *7429
713-***-**** home 906-***-**** cell
*********@*****.***
OBJECTIVE
I&E Journeyman/Instrument Fitter/Leadman
Willing to travel.
EXPERIENCE
Very Skilled and knowledgeable in I & E construction. 13 years experienced Instrument Fitter, Worked with instrument techs trouble shootings, New Construction, Shutdowns, Labs, Offshore, Rigs, bops stacks, panels, skids, analyzer buildings, Junction boxes, and any size tubing/pipe/conduit bending specialist.
EMPLOYMENT
AIC Big Island, VA Sept/19- Nov/19
Outage at paper mill. Rack bare tubing 1”-3/8”
HKAa Asheville Jan/19 - sept/19
Decron pulls on nights building steam turbine. Rack tubing and air supply.
Betchell Cameron June/17-Jan/19
Rack tubing, install mount tray instruments. Decron tray and tubing tie ins. Air pipe/air supply valves.
SNB Laporte may/16-June/17
Instrument maintenance
Assist electrical and run tubing and air pipe as needed.
SI Mount Belleview, TX Feb/16-May/16
Instrument Fitter Leadman- Reading P&ID and location drawings, Installing instruments, Tubings, tray, mounting stands, fabrication of brackets and supports. Assisting welder.
Tradesmen Houston TX Jan/16-Feb/16
Instrument Fitter Leadman- Sweat copper, running rack tubing in labs. Pressure testing, bending SS tubes, line breaks and tie ins.
Telespen Bay city, TX Feb/15 –Nov/15 Dec/15
Instrument Fitter Leadman - Running welded air pipe, fabrications of brackets and supports.
Tradesmen Sabine pass, Aug/15 Nov/15
Rack tubing and tray. Radius tray for decron and capillary. New construction.
HMC Houston, TX National Oilfield Vessels Feb/15 –Aug/15
Instrument Fitter – 1” pipe, on BOP skids. Bending and Pipe Fitting, fabrication for welders, brackets and supports. Hydraulic benders, Rack Tubing, lay out ROV Instrument Panels. Assembly line. Q/C, material storage, Inventory, Reading P&ID’s, ISO’s.
Triad Deer Park, TX Shell Refinery Nov/14 – Feb/15
Instrument Fitter – Analyzer buildings trouble shooting. Air pipe 3/4 “ and 1” Working with techs, calibration, PLC and panels.
Fluor Freeport, TX DuPont Sept/14 – Nov/14
Instrument Fitter Leadman – ”, ”, 1” Screw Air pipe, Radius tray and poly tubing, capillary tubing, Reading location drawings, P&ID, ISO metric drawings. Instrument installation.
HMC Houston, TX Cameron June/14 –Sept/14
Instrument Fitter – ” rack tubing accumulators, ROV panels, Autoclave 1 1/2” -2” pipe, bending with hydraulic benders. Pressure testing, Q/C and trouble shooting. New BOP stacks and damaged BOP stack for rigs.
Turner Pasadena, TX Lyondell April/14 – June/14
Instrument Fitter- Shutdown remove, replace old valves and tubing instruments. Mount stands, brackets, route tray and tubing.
Rabliaus Corpus Christi, TX Flint Hills Jan/14 - April/14
Instrument Fitter- Shutdown demo, remove replace, and install. Stoke valves, Pressure test, Fabrication galvanized tray, radius tray for decron, insulated tubing, stands supports, and brackets.
ZHI Chocolate Bayou, TX Ineos Oct/13 – Jan 14
Instrument Fitter- Tubing up valves, FTs, PTs and analyzers. Panels, Insulated Tubing/Decron and tray.
ITI/KBR Deer Park, TX Shell sept/13 – oct/13
Instrument Fitter - Shutdown Demo old heat trace tubing and replace. Installing TE’s inside a furnace.
Certified Webster, TX Lyondell aug/13- sept/13
Instrument Fitter- New construction, small skids for gas turbines. tubing and tray.
Ardent Pasadena, TX Lyondell June/13-July/13
Instrument Fitter – Shutdown tubing new valves, new air system, switching over to nitrogen. Air pipe 3/8 tubing. Tubing analyzer buildings. Panels, purge boxes, and bottle skids.
ZCC Pasadena, TX Chevron Phillips Feb/13-May/13
Instrument Fitter- Shutdown. Old valves replaced, tubing up new valves. Air pipe/ 3/8’s.
HCC Pasadena TX, Lyondell Sept/12-Jan/13
Instrument Fitter- maintain jack of all trades. Panels, analyzer building, linemen, conduit, pull wire, poor concrete, skids, junction boxes and terminate.
Triad Mount Belleview, TX Enterprise July/12-Sept/12
Instrument Fitter- Shutdown 1/2 and 3/4 air pipe. Pull wire
Mundy Companies Pasadena, TX Cleanse March/12-July/12
Instrument Fitter- 80/20 skids for R&D lab 1/8 tubing, cutting plate, mounting gauges/valve/regulators and poly. Rehired for more work.
KBR ITI Deer Park, TX Shell Dec/11-Feb/12
Rehired for Shutdown/Turnaround - Remove/disconnect/ replace. Steam trace stainless 1/2’.
TASC Lake Jackson, TX BP Nov/11-Nov/11
Instrument Fitter Shutdown, tubing, tray, decron and steam trace.
KBR ITI Houston, TX Shell Jan/11-Feb/11
Instrument Fitter- Shutdown, Air pipe, tray, tubing valves and decron.
S&B Channelview, TX Lyondell March/11-April/11
Instrument Fitter air pipe, tray, pulling wire, cable tray and tubing.
Mundy Pasadena TX Celanse May/11-Sept/11
Instrument Fitter- 80/20 skids for R&D lab 1/8 tubing, cutting plate, mounting gauges/valve/regulators and poly.
KBR ITI Deer Park, TX Shell Oct/11-Nov/11
Instrument Fitter -Shutdown, steam trace, air pipe, valves, stands, and panels.
EnGlobal Houston, TX Panel Shop Mar/10-Nov/10
Instrument Fitter - Panels, group tubing, 1/8 - 1/2, o2 clean buildings, sample systems, air pipe, reading drawings, brackets and lots of tubing work.
ISC Beaumont, TX Marathon Aug/09-Jan/10
Instrument Fitter/Tech - Stands, brackets, air pipe, supports, P&ID’s, aluminum tray, group tubing, and insulated tubing. Working in warehouse inspecting valves and instruments to spec. Loop checks with techs.
Mundy Companies Pasadena, TX Air Products Jan/10-May/10
Instrument Fitter Shutdown, running group tubing, aluminum tray and steam trace.
Hugh Patrick Construction Texas City, TX BP Sept/08-Jan/09
Heavy Equipment Operator- Excavation, Cutting a grade for road. Survey for grade.,Backhoe, Forklift, Roller, Front-end loader. Load/Unload of trucks.
ZZC Borger, TX May/08-Sept/08
Instrument Fitter -Mounting stands and instruments. Installing Junction Boxes. Aluminum Tray Fabrication. to tubing.
MMR Baton Rouge, LA Mar/07-Jun/07
Instrument Fitter -Offshore on a unit running group 3/8’s tubing to pneumatic panels. Demo old panels and replaced with new. Fabrication of brackets, clips and fiberglass tray. to tubing.
Amber, Baytown, TX Exxon Dec/06-Mar/07
I&E Journeyman - Exxon Plant in Baytown - Mounting, tubing and termination of instruments. to tubing/Aluminum tray. Ran conduit to junction boxes. Pulled wire. Built red concrete underground conduit banks for boxes.
Zachry, Knoxville, TN Jun/06-Dec/06
I&E Journeyman Installed 3/8’s seal flush drains to apx. 50 motors at plant. Installed Rota meters to control flow on seal flush drains. Emergency lighting. Pulled Wire/ran conduit all sizes.
Rabilus, Pasadena, TX PSR Mar/06-Jun/06
Instrument Fitter – Pasadena Refinery Installed gate valves on pipe for high and low side. Followed behind pipe’s production for installs. Mounted and tubed up instruments. - 3/8 tubing. Mounted and tubed up air filters. Mostly bare tubing some decron, no tray.
SKILLS
Experienced with use of, 1/8-3/4 hand benders, Hydraulic benders/ratchet benders. Power Pony/535. Side winder, Terminations, bending conduit, pulling wire, Read PI&D, Instrument Locations and installation, material handling and storage, Building analyzers buildings and trouble shooting, Forklift/Backhoe. Warehouse Overhead Crane/Rigging. Computer: 65wpm 3000kps.
Zachry, Dapilhe, MS 11/05 -02/06
Electrical Helper Pulled wire to MCC. Termination of MCC. Fabrications of brackets. Cable tray/Conduit all sizes.
Zachry, Pasaugula, MS Cheveron 07/05-11/05
I&E Helper - Ran to tubing. Entire plant had 12” water anything electrical/instrument removed & replaced. Assembly of cable tray. Pulled Wire/Ran conduit sizes.
Zachry Beaumont, TX Exxon 11/03-06/05
Instrumentation Helper -New construction. 3 GE steam turbines for power plant. Ran 3/8’s sample lines/aluminum tray with expansions. Mounted and tubed up instruments. Ran air supply screw pipe lines. Decron to sample buildings. Fabrication of clips, brackets and stands.
Remedy Staffing, Houston, TX TEMP SERVICE 06/01-05/03
Fork Lift Driver/Delivery of medical supplies. Warehouse, Stocking/Inventory, Unloading/Loading trucks with forklift.
Kelly Services, Houston, TX TEMP SERVICE 05/99-06/01
Clerical - Spreadsheets/Word documents. Scanning files into data base. Labeling files. Answering phones. 2 Companies merging helping them sort the HR files of employees. Running errands. /Mail
Manpower, Pasadena, TX TEMP SERVICE 8months
Forklift Driver/General. Troubleshooting water meters. Removal/Assembly of water meters and transmitters. Manufacturing power cable. Unloading/Loading of trucks. Stocking/Inventory.
Action Stainless, Houston TX 2months
Forklift driver/General Labor Unloading/Loading trucks. Measuring and cutting metal sheets etc. Clean up of warehouse.
Don Anderson Plumbing, Deer Park, TX Since I was 10years old.
Plumber Sweat copper. 535 thread galv. pipe. Installing kitchen Sinks/Toilets/Sewer. Natural Gas lines. Trenchers/Backhoe for excavation. Automated sprinkler systems. Plumbing.