Post Job Free

Resume

Sign in

Hvac Project Engineer with 13 years experience in gulf

Location:
Trichy, Tamil Nadu, India
Salary:
Aed 12000
Posted:
September 14, 2020

Contact this candidate

Resume:

CURRICULAM VITAE

ABDUL HAKKEEM.A

Address

* ********* **

Begambur

Dindigul

Pin 624002

Tamil Nadu

INDIA

Contact No.:

Cell:+91-988*******

Email:

adf2n5@r.postjobfree.com

Driving License:

Valid Oman Lmv driving License

Personal Data

Date of Birth : 24.08.1983

Sex : Male

Marital Status : Married

Nationality : Indian

Passport No. : L1158269

Religion : Islam

Notice Period:

Immediately

Languages Known:

Speak: English, Hindi & Tamil

Write: English & Tamil

Read: English & Tamil

Objective

Seeking a challenging position involving analysis, design, development and implementation of professional environment, where I can grow along with the organization with great responsibility.

Post Applied for

HVAC Project Engineer

Educational Qualification

Bachelor of Science (Physics) – 77%

Bharathidasan University

Tamil Nadu- India.

Duration - 3 Years

Grade – First Class with distinction.

Post B.Sc., Training in Mechanical Technology

B.S.Abdur Rahman Crescent Engineering College

Tamil Nadu- India.

Duration - 2 Years

Grade – First Class

Professional Strength

Hard working and good decision-making.

Good communication skills.

Letter writing and documentation.

Ability to maintain a positive attitude.

Gulf Experience ( 13 Years) and India Experience (6 Months)

8 years in Sultanate of Oman-(May 2012 to March 2020)

5 and half years in United Arab Emirates-(Nov.2006 to Feb.2012)

6 Months in India-(May 2006 to October 2006)

Positions

HVAC Project Engineer-(May 2012 to March 2020)

HVAC Site Engineer-(November 2006 to February 2012)

HVAC Site Supervisor-(May 2006 to October 2006)

H

PACKAGES

MS OFFICE-2007, SAP, MDO & Autocad 2009

OPERATING SYSTEM

Microsoft Windows

SKILLS

Preparation of Documentation, Excellent communication skills, Good Knowledge in Microsoft Office (Word, excel, PowerPoint, Adobe, Outlook and Internet Explorer)

PROJECT PROFILE

Working as a “HVAC Project Engineer” in Al Turki Enterprises LLC., (ATE) in Muscat – Oman from May 2012 to Till Now

Project : Village area Phase 3 and Sector H, L at Al Mouj Muscat

Client : Al Mouj Muscat, SAOG

Consultant : Parsons International

Period : November 2017 to Till now

This Project comprises of Pre insulated carbon steel seamless pipe of size dia. 600mm to 200mm with valve chamber works. The valve chamber would be connected with individual projects and provision for external chillers would be provided. The purpose of laying the pipe is to connect the district cooling plant with individual apartment building projects.

Project : Apartment Block H 01 @ Al Mouj Muscat

Client : Al Mouj Muscat, SAOG

Design Consultant : Atkins Global Solutions

Supervision Consultant : Parsons International

Period : April 2016 to August 2018

These projects are residential apartment building comprises of residential flats, a common roof mounted swimming pool and retail shops.

Project comprises of 1 nos. Plate Type Heat Exchanger of capacity1050 TR, 3500 LPS to 5200LPS capacity of Fresh Air Handling Units, Energy recovery ventilator of capacity 330 lps, 665 Nos., of each 2 to 4 TR Fan Coil Units, Extract Fans like car park ventilation Jet fans, Roof mounted axial fans for venting the basement smoke through masonry shaft, Garbage room ventilation fans, Retail Kitchen Extract Fans.

Project : Precinct P 18 & P 11 @ Wave Muscat

Client : Wave Muscat, SAOG

Consultant : Atkins Global Solutions

Period : May 2014 to Till Now

These projects are residential apartment building comprises of residential flats, a common roof mounted swimming pool and retail shops.

Each project comprises of 1 nos. Plate Type Heat Exchanger of 600TR & 850 TR, 3500 LPS to 5200LPS capacity of Fresh Air Handling Units, Energy recovery system, 338 Nos., & 418 Nos., of each 2 to 4 TR Fan Coil Units, Extract Fans like car park ventilation Jet fans, Roof mounted axial fans for venting the basement smoke through masonry shaft, Garbage room ventilation fans, Retail Kitchen Extract Fans.

Project : Precinct V 25 @ Wave Muscat

Client : Wave Muscat, SAOG

Consultant : Atkins Global Solutions

Period : September 2013 to May 2014

This project is residential apartment building comprises of residential flats, a common roof mounted swimming pool and retail shops.

Project comprises of 1 nos. Plate Type Heat Exchanger of 749 TR, Fresh Air Handling Units, Energy recovery system, 395 nos., of each 2 to 4 TR Fan Coil Units, Extract Fans,

Project : Music Complex and Operation Center

Client : Royal Guard of Oman - Sultanate of Oman

Period : April 2013 to December 2013

This project built for provide accommodation to Military candidates and for a Military Auditorium.

Project comprises of 2 nos. of each 290 TR Capacity Air Cooled Chillers, Air Handling Units, Energy recovery system, 108 nos., of each 2 to 4 TR Fan Coil Units, Extract Fans, PAC Air Conditioner and Split A/C System

Project : DGT Phase 2 @ Seeb

Client : Royal Court Affairs-Sultanate Of Oman

Period : May 2012 to June 2013

This project built for the office staff who manages the vehicles of Royal court affairs, seeb office.

Project comprises of 3 nos. 150 TR Air Cooled Chillers, 5 KW 3 nos., Primary Pumps. 22 KW 2 nos., Secondary Pumps, Automatic CHW Pressurization system, Automatic Chemical Dosing System, 13 nos., of 20 to 40 TR Air Handling Units, 21 nos., of 2 TR Fan Coil Units, 40l/s to 240 l/s Twin Extract Fans with timer circuit, 18 TR PAC Air Conditioner, 2.5 TR Split A/C System, 6500 sq.meter of Air conditioning duct works, 1200 Sq.meter of Extract Air Duct works, Underground pre insulated seamless mild steel pipes for interconnecting chiller to respective building AHUs.

Worked as a “HVAC Site Engineer” in Emirates Trading Agency LLC., (ETA) in Dubai - U.A.E. from November 2011 to February 2012

Project : Airport Concourse 3

Client : Dubai Civil Aviation

Consultant : M/S DAR AL HANDASAH

Main Contractor : M/s. Alec

Period : September 2011 to Feburary 2012

4B + G + U1 TO U7 + 20 nos. Rotunda (Separate levels for Arrival and Departure) with Hotel at Dubai Civil Aviation Premises

Worked as a “HVAC Site Engineer” in Emirates Trading Agency LLC., (ETA) in Dubai - U.A.E. - from June 2011 to October 2011.(5 Months)

Project : Emirates Financial Towers

Client : Emirates Financial Towers L.L.C

Project Manager : M/s. Projacs International

Consultant : M/s. Al Gurg

Main Contractor : M/s. TAV Construction

Period : March 2011 to September 2012

3B + G + P1 + 2C + 29 Office and Residential Towers (South & North) on Plot No.CP-03 at Dubai International Financial Center. (DIFC)

Worked as a “HVAC Site Engineer” in Emirates Trading Agency LLC. (ETA) in Dubai - U.A.E. From November 2006 to May 2011. (4 Years and 7 Months)

Project : Business Bay Executive Towers – 11 Towers

Client : M/s. Dubai Properties

Project Manager : M/s. MACE International

Consultants : M/s. DAR/ W.S. Atkins

Main Contractor : M/s. Al Habtoor Eng. Co.LLC

Period : November 2006 to May 2013

Executive Towers consisting of 11 Towers in Total, 10 Residential & 1 Commercial tower ranging from 30 to 55 storey’s with a 3 level common podium constructed in Business Bay, stated as one of the most sophisticated business hubs of the word.

Each Project is air conditioned via basement level heat exchanger of capacities ranges from 900 TR to 1250 TR, which is connected to district cooling plant. There are secondary and tertiary chilled water pumps to serve the chilled water supply for individual apartments fan coil units, plant room fresh air handling units. There is a stair case pressurization fan to maintain positive pressure of air, while fire occurs. There is a lobby relief fan in mechanical floor to extract the smoke from common area and corridor, while fire occurs.

Worked as a “HVAC Site Engineer” in Emirates Trading Agency LLC. (ETA) in Chennaii - India. from May 2006 to October 2006

Project : Nokia Mobile Facility

Client : Nokia P Ltd.

Main Contractor : M/s. Leighton

Period : May 2006 to October 2006

Ground Level and dedicative Mezzanine Level for 38 nos, of FAHU, AHU with chilled water supply from the chiller ward which comprises 7 nos. of Air Cooled Chiller of each having a capacity of 240 TR.

JOB RESPONSIBILITIES

Office Work Responsibilities:

a.Raising Inspection Request/Request for Inspection & Approval for HVAC works like

1.Installation and Pressure Testing of Chw Pipe System (Floor and Riser)

2.Installation of HVAC Equipments

3.Grid Clearance sign off and IR

4.Boarding Closer IR

5.Final Fixture IR

6.RFIA sign off in coordination with testing and commissioning team.

b.Preparing and Submitting for the Client/Consultant approval

1.Material Submittal (MAS Submission)

2.Technical Query/Request for Information

3.Conformation of Verbal Instruction

4.Method Statement for Installation and commissioning

5.Pump Head Calculation

6.External Static Pressure of Duct calculation

7.Shop Drawing Preparation and Submission

8.As Built Drawing Submission

9.O & M Manual Preparation and Submission

10.Asset Register and Valve Tags Schedule Preparation

11.TR Calculation sheet Submittal for District Cooling Plant

c.Certification Works Like

1.Making Work Order and Amendment for Sub contractor works

2.Certification of sub-contractor works

3.Material Order trough SAP software/Manual Indent Making for Materials required for site work

4.Follow Up With Supplier to get the material on time

5.Certification of In house/Man Power Supply Works according to Work Output

Site Work Responsibilities:

a. Exercising full control of the work force at site.

b. Ensuring work is executed in accordance with contract specification design, agreed procedures and method statements.

c. Ensuring that safety rules and regulation are thoroughly enforced.

d. Completing the necessary QA documentation related to the work.

e. Interaction with Main Contractor for M E P coordination with civil works.

f. Arrange for the material and necessary manpower well in advance.

g. Testing and commissioning of HVAC installations as applicable.

h. Coordination with other MEP services at site.

i. Preparation of work order and related amendment.

j. Preparation of as built drawings.

Maintenance Work Responsibilities:

1.Periodic checks of FAHU, AHU, FCU Pre filter and Bag filter, Strainers of Pumps, Chemical level and Water level of Chilled Water Circuit.

2.Resolving the issues like Motor Winding Problem, Thermostat and Actuator Repair Works

3.Ability to detect Mechanical faults in Equipments such as Fan Coil Units, Air Handling Units, and Chilled water pumps, Automatic Chemical and Pressurization Systems.

4.Ability to clear the issues related to Air Conditioning from Tennant Apartments

Other Responsibilities:

1.Coordinate with the Material Suppliers and Equipments Suppliers to get the item in time.

2.Coordinate with Equipments Suppliers for Testing and Commissioning related works

a)Chillers - TRANE, CARRIER

b)Plate Heat Exchanger - HRS FUNKE, ALPHA LEVEL and KELVIN

c)Chilled Water Pumps

And Pressurization System -ARMSTRONG and GRANDFOUS

d)FAHU, AHU -CARRIER, DYNAIR, XAVIER and SKM

e)Fan Coil Units - YORK, DYNAIR and SKM

f)Axial Fans, Jet Fans -FLAKTWOODS, PENN WOLTER, WESTERHECK

g)Chilled Water System Flushing

And Chemical Dosing System - CULLIGAN, NALCO

Declaration

I solemnly declare that the statements made by me are true and correct to the best of my knowledge

and belief.

Yours truly

A.Abdul Hakkeem



Contact this candidate