CURRICULUM VITAE

Position applied for: - QA/QC Engineer

Skills:

1. Familiar with ASTM, ASME, API, ANSI, NACE, & AWS code of standards. 2. Well familiar with U/G, RTR, GRP & A/G process piping, piping materials and their codes of identifications.

3. Well knowledge to understand P & ID, Piping layout, Isometric, Piping Class, STD pipe support etc.

4. Review Quality Control Plans, Inspection & Test Plans & monitor their implementation. 5. Construction, Inspection and maintenance experience in Oil & Gas, Petrochemical and Power generation industries.

6. Inspection of assembly Piping / Pipe support fabrication erection, Hydrostatic test, re- instatements according to approved project specification and with reference to API, ASME & AISC codes.

PRAVEEN.K.SHARATH

E-Mail: - adf2if@r.postjobfree.com

(Mob): +965 - 65676246 (KUWAIT)

Having 16 Years of work experience in Boiler, Piping, Oil/Water Tanks & Structural (Inspection and construction). Professional Experiences

Sl.No EMPLOYER DESIGNATION FROM TO PLACE SECTOR

1. Alghanim International,

Kuwait

QA/QC

INSPECTOR 15.06.2014 Still Continuing KUWAIT Power Sector 2. Nasser S Al Hajiri Corp.

KSA Welding Inspector 04.11.2011 21.01.2014 KSA Oil & Gas 3. ROYAL Engineering,

Ambalamugal, Cochin QC Inspector 15-09-2010 30.08.2011 INDIA Oil & Gas

4. HOTECC, Kuwait QC Inspector 03.03.2008 18.07.2010 KUWAIT Oil & Gas 5. FEDO (FACT Engineering

and Design Organisation) Mechanical Supervisor 25.03.2007 25.02.2008 INDIA Oil & Gas

6. M/S K K

CONSTRUCTIONS Mechanical Supervisor 19.05.2004 24.03.2007 `INDIA Oil & Gas

QUALIFICATION DETAILS

SL

NO COURSE DETAILS INSTITUTION

YEA

R

GRADE/M

ARK

TECHNICAL QUALIFICATIONS

1. Diploma in Mechanical Engineering Thiagarajar Polytechnic College, Alagappanagar 2004 61% 2. C-SWIP 3.1 (valid up to 15 May 2021) IIT NDT, Valanjambalam, Cochin 2011 75% 3. LEVEL II (NDT) St: Johns Instate of NDT, Thrissur 2008 80% 4. AUTOCAD 2002 ECIT, IRINJALAKUDA 2004 A GRADE

ACADAMIC QUALIFICATIONS

1. S.S.L.C St: Mary’s H.S., Irinjalakuda 1998 63%

2. Pre-Degree Christ Colle ge, Irinjalakuda 2000 65% Details of Working Experience

I ALGHANIM INTERNATIONAL, KUWAIT

QA/QC INSPECTOR

From 15.06.2014 TO Still Continuing

Project 1 :- SABIYA OCGT O8 POWER PLANT (500 MW).

Project 2 :- SABIYA OCGT 24 POWER PLANT (500 MW).

Project 3 :- SABIYA CCGT 54 POWER PLANT (750 MW) (Still Continuing). Details of the work done during the working period are given below 1. Monitoring of Fabrication / Erection & Welding of Piping & Storage Tanks. 2. Monitoring of WQT

3. Sound of knowledge of WPS & PQR

4. Ability to follow the RT Film Interpretation, TIG/ARC/MIG Welding, PWHT, Pre-Heat. PMI & HT 5. Preparation of QC Documentation

6. Monitoring of NDT Activities & Hydro-Test

7. Ability to follow Hydro-Test Package Preparation 8. Surveillance of welding activities to prevent non- conformance. 9. Coordination of NDT methods with external agencies. 10. Preparing field quality inspection plans.

11. Coordination with client personals.

12. Ability to field walkdown with punch list preparation 13. Aware about API 650, 12th edition, 2013 for oil storage tanks 14. Aware about AWWA D100 code for water storage tanks 15. Aware about ASME codes of Sec IX 2019, Sec I 2017, Sec V 2017, B31.1 2016. 16. Aware about for Storage Tanks: - Peaking, Banding, Verticality, Settlement, Oil Chalk Test, Pneumatic Test of Reinforcement Pads, Fit-Up, Welding, Engineering Clarification regarding the site modification, Blasting Inspection, Painting Inspection, Roof Pneumatic Test, NDE, Preparation RT Maps in AutoCAD, Weld Map Preparation in AutoCAD, Preparation of Fit-Up/Weld Visual reports, Preparation of Weld Summary, Preparation of NCR.

17. Aware about for Boiler & Boiler Piping/Non-Boiler Piping: - Sequence of erection/fit-up/welding of Boiler Parts with respect to the Erection Procedure, Coordination & preparation of ASME quality documents with AI

(Authorized Inspector) according to the AI approved Quality Manual, ITP preparation with revision stages with respect to the comments from Client (MEW) & ASME Inspector, Site official engineering clarifications with the designer company (L&T India and BHI South Korea), monitoring with inspection of Fit- Up/Welding/Pre-Heating/PWHT/RT/PT/UT for all internal (BP) & external piping (BEP & NBEP) of Boiler, Hydro-package preparation of Boiler & Non-Boiler piping, Test boundary with highlighting in P&ID (PDF) for each Packages, Daily site meeting coordination with Sub-Contractors to plan daily site activities, Preparation/ closing of Non-Conformity (NCR) with Design company (BHI) & Sub-Contractor (Powermech, UAE), RT film review, As-built Preparation for piping, Alignment/Leveling inspection with Protocol preparation in AutoCAD for Boiler Columns, Alignment/Leveling inspection with Protocol preparation in AutoCAD for Boiler Drums, Alignment/Leveling inspection with Protocol preparation in AutoCAD for Boiler Harp Headers, Preparation of Damage reports with Material Inspection of all Boiler Parts, Preparation of WPS with respect to the previous PQR according to the review and comments of ASME Authorized Inspector, Coordination of WQT, Preparation of Welder Certificates, Preparation of Welder ID Cards, Preparation of Welder Continuity, Line walk-down with ASME Inspector and MEW representative before start the hydrotest, Monitoring of Hydrotests for Boiler Piping & Non-Boiler Piping, Punch Point closing with MEW, Reinstatement with MEW, Painting inspection with MEW for piping, piping supports and entire Boiler with Boiler Structure, Preparation of Inspection Notification for each activities in the site, Participation in Pre- Commissioning & Commissioning Activities, Material used for the Boiler is :- A335 P91, A335 P11, A335 P22, ASTM A 312 TP 316L, ASTM A 312 TP 304L, ASTM A 106 Gr.B, II NASSER S. AL-HAJRI CORPORATION, KSA, JUBAIL.

From 04.11.2011 TO 21.01.2014

DESIGNATION: - Welding Inspector (SAUDI ARAMCO APPROVED) Projects: - (1) SATORP/TR, (2) SADARA/FLUOR (Petro-Chemical Projects)

(1) Conducted internal and external inspection to ensure that it meets the necessary code and quality standards.

(2)Ensured that all the safety procedures are maintained while using the various equipments in the welding procedures.

(3)Maintained all the documentation for the inspection and repair work carried on the facility and kept record of the submitted forms.

(4)Administered the policies and procedures of company and followed it in the inspection process.

(5)Maintained all paperwork such as completing the forms for the customers and the company.

(6)Administered the various aspects of the welding process and maintained a quality control as per procedure.

(7)Monitored the welding works and procedure to ensure the legitimacy of the process.

(8)Managed the inspection process by identifying any defects in the process.

(9)Prepared detailed reports of the inspection process and conducted regular audits of the welding. III ROYAL ENGINEERING, AMBALAMUGAL, COCHIN

From 15.09.2010 TO 30 08.2011

DESIGNATION: - QC Inspector

Details of the work done during the working period are given below:

(1) Remarkable experience in welding and inspecting the Piping/Pipeline.

(2) Skilled in making execution for the welding construction and fabrication.

(3) Sound knowledge of the welding procedures and associated materials.

(4) Profound knowledge of welding fabrication and the necessary actions for erecting welded structures.

(5) Ability to inspect the welding procedure visually and grant certifications accordingly.

(6) Ability to follow the various plant codes in the pipeline work.

(7) Ability to follow the NDT testing methods in welding inspections & Proficient in using Microsoft Office.

(8) Ability to follow the RT film interpretation, PWHT, BHT, Pre Heat, TIG/MIG/Arc Welding.

(9) Skilled in making inspection for hydro-test & Pneumatic testing. IV HOTECC Kuwait General Trading and Contracting Establishment From 03.03.2008 to 18.07.2010

DESIGNATION: QC INSPECTOR

Project: - 1

Piping for south pier at KNPC (MAA) is to construct a new Piping Distribution at MAA. Accelerate/Hyundai is the main contractor of this project. Estimated project (for HOTECC) cost is around 280 million US$.

RESPONSIBILITIES:

Review and study drawings submitted for Mechanical and pipe construction works at South pier, Supervision of cutting/welding, Visual inspection of welding joints, pipe supports, hydro test/Painting also and laying of CS/SS/LTCS Pipes (up to 600 & 965NPS & small bore also) and installations of valves

(Butterfly Valve, Flow Control Valve, Gate Valve and Non-return Valves). Also did installation of Cement coated fire water line. Also engaged for N2 Test, Hydro tests, Painting and Insulation. Project: - 2

A cross country pipeline job at KOC (Kuwait Oil Company). In this project having heavy lines (20”, 24”, 36” and 48”). These all are crude transit flow lines. We are the PMC contractor of this project. RESPONSIBILITIES:

Review and study drawings submitted for Mechanical and pipe construction works and supervision of cutting/welding, visual inspection of welding joints, pipe supports, hydro test/Painting V Piping Inspection Supervisor in FEDO (Fact Engineering and Design Organisation) Udyogamandal, Cochin, Kerala, INDIA

From 25.03.2007 TO 25.02.2008

DESIGNATION: - MECHANICAL SUPERVISOR

FEDO is a public sector company in INDIA; my role in this project is welding visual inspection, RT film review, witness for hydraulic test & rheumatic test and all office documentation also. And also prepare WPS, PQR, and WPQ & witnessed by welder qualification, bending test, BHT, PWHT, Preheating, Density checking for insulation materials.

It is a PMC contract of FEDO from Cochin Refinery. FEDO's scope is designing, inspection and commissioning activities about all civil & mechanical works. It is a new BITUMEN PLANT project in Cochin Refinery. Name of that project is "BITUROX". All technologies and P&I are coming form an Austrian company.

VI M/S K K CONSTRUCTIONS, Ambalamugal Cochin, KERALA, INDIA From 19.05.2004 to 24.03.2007

DESIGNATION: Mechanical Supervisor

PROJECT DESCRIPTION

Piping/structural works at Cochin Refineries, FACT, and BPCL & Cochin Port: Supervision of Piping fabrication, Hydro testing, Manpower controlling, Material controlling, etc., are my responsibility in this project. Also, at FACT & BPCL I was involved for oil tank maintenance. Computer Skills & Knowledge

Operating System : Windows 10

Application Software : M.S. Office & AutoCAD

PROFICIENCY IN LANGUAGE

Proficient in English, Hindi, Tamil & Malayalam

PERSONAL INFORMATION

PERMANENT ADDRESS

PRAVEEN KUTTAN SHARATH,

SHARATH HOUSE,

PORATHISSERY (P.O),

IRINJALAKUDA (NORTH),

TRISSUR DISTRICT, KERALA STATE, PIN: - 680125, INDIA. Nationality : Indian

Date of Birth : 10th

December 1981

Marital Status : Married

Passport No : S 2345979

Date of issue : 21.11.2017

Expiry Date : 20.11.2027