CURRICULAM VITAE
ABDUL RAHMAN : ***************@*****.***
CAREER OBJECTIVE:
To associate with an organization that progresses dynamically and gives an opportunity to enhance my professional and personal skills, and to be a part of team that excels in works towards the growth of an organization.
Work Experience Summary (Total 6 Years)
Presently Designated as MEP Site Engineer in Al Kamal International Interior Design and Contracting Company, Project: Quality Inn Hotel Jeddah with Equinox Group Project Management Consulting, Client Al Tayyar Group. (from June 2018)
Worked as MEP Site Engineer in Al Kamal International Interior Design & Contracting Company, Project: Abraj Al Kiswah Hotel Makkah Renovation Project (from July 2017- May 2018) Client Al Tayyar Group
Worked as MEP Technical team in Sino Hydro contracting company Dammam Project: Dhahran Housing and Schooling Project (June 2016 to July 2017)
Worked as Mechanical Engineer Yashoda Hospital Project in India (2014-2016)
EDUCATIONAL QUALIFICATION:
M-TECH (Master's) in Mechanical Engineering (HVAC)
B-TECH in Mechanical Engineering
Diploma in Revit MEP Hvac, Plumbing & Firefighting
Proficient in MS office (MS word, MS Excel, MS Power Point)
Specialization Diploma in Autocad Civil, Mechanical (2D & 3D)
Job Responsibilities as MEP Site Engineer:
I am capable of independently handling of all the required Duties and Responsibilities to Obtain and manage client approval on systems and installation, assist in the receipt and review of MEP submittals, Log and post all MEP changes, detail information on field Preparing Shop drawing, As-Build drawing, Executing Site Hvac, Plumbing, Fire Fighting.
MEP Duties:
Preparing shop drawing and delivery on site for execution with time schedule as per the project handover.
Monitoring the site for the work execution as per the drawing and standard
Reports directly to Senior Management with contract and responsibilities for the MEP Division
Submittals and RFI's between consultants and contractors.
Assist in the testing and commissioning of MEP equipment, Attending MEP coordination meetings.
Review of shop drawing and material submittals, Monitor and report progress of all activities
Testing and commissioning Audit, Site inspections for quality checks, preparing the scope of work, attending the meetings with contractors and final handing over process
Prepares technical specifications and Bill of Quantities
Drafting, Detailing Technical Engineering department of MEP Drawings.
Issuing proper Instruction and Technical Specifications to the concerned teams.
Material order, Maintaining Documents & Records
Prepares and updates as-built drawings, Reviews Change Orders and substitutions
Making inspection of MEP 3rd fix before handing over.
Preparation of daily, weekly & monthly Work Progress reports.
Preparation of Monthly Invoices on the basis of Work Progress on project.
Certification of Monthly Invoices of Contractors / Sub Contractors as per work progress.
HVAC SYSTEM:
All ducting SAD, FAD, EAD, KEAD, Smoke Test & Light Test for all Networks.
Installing different types of Grills, Diffuser, VD, FD, VCD, MFD, as per the project specification
CHWS & CHWR piping, 2-way valves, Actuator, Picv valve, Strainer.
Hydrostatic Tests & Flushing Tests for Chilled Water Piping networks.
Witnessing of Startup and Commissioning of HVAC Equipment (Chillers, AHUs, FCUs, Ventilation Fans, Exhaust Fans, Stair case Pressurization Fan, Smoke Extraction Fan and Chilled Water Pumps) as per the approved sequence of operation.
Testing, Adjustment and Balancing of the HVAC System as per the Design of the Project.
Installing different types of Grills, Diffuser, VD, FD, VCD, MFD, as per the project specification
PLUMBING & FIRE FIGHTING SYSTEM:
Selection of Water Supply Pipes, Sewage Pipes, Fittings & Valves as per the system design requirements
Hydrostatic Tests, Flushing Tests for Water Supply System’s piping network.
Witnessing for Startup and Commissioning of Water Supply System’s Equipment (Lift Pumps, Booster Pumps, Centralized Water Heaters, and Sand Filters and PRV Stations) as per the approved sequence of operation.
Gravity Tests & Flow Tests for Sewage System’s piping networks.
Sprinkler System, Fire Hose Reel, Ansul system, FM200 system, Hydrant,
Witnessing for startup and commissioning of firefighting network, zone control valve, valves, PRV, Potter switch flow meter adjustment.
Electric Pumps, Diesel Pumps, Jockey Pumps, Heavy Duty PRV Stations
Wet & Dry Landing valve, Siamese connection.
PERSONAL PROFILE:
Father’s Name : Mohammed Abdul Saleem
Nationality : Indian
D.O.B : 10 June 1992
Languages Known : English, Arabic, Hindi and Telugu
Marital Status : Married
Passport No : S9761504
IQama : Transferable
GCC Driving License No : 242-***-**** (K.S.A)
Passport Details : Date of Expiry: 31 October 2028
DECLARATION:
I hereby declare that the information given above is correct to the best of my knowledge (ABDUL RAHMAN)