WORK SUMMARY:

Have an overall relevant experience of 10+ years in India and kingdom of Saudi Arabia in Consulting and Contracting companies, in the field of Design and Construction as a Quantity Surveyor.

Involved in entire civil and Mechanical material takeoff such as All type foundations and structural elements, Pipe supports and Pipe, and Cable Racks, Basin Foundations, Vessel Foundations and Transformer’s Foundation etc. Substation Buildings, Process Interface Buildings, Sewerage line network, Storm Water Drainage System, Instrumentation and Electrical cable Trench. Computation of Manholes Quantities.

Involved in various critical and challenging projects from design stage to implementation stage and ensured that the projects gets implemented as per specification in stipulated time Development of infrastructure of industrial city – roads, structures and piping (water, sewer, storm-drainage, electrical & telecommunication networks)

Review and approve construction procedures, test plan, project specification, and worked on various critical and challenging projects. Responsible in implementation of procedures, quality of as per technical specifications, coordination with other disciplines and end users before execution of site inspection of work for monthly progress report and maintain team network environment by developing mutual respect and rapport. Mohammed Maqsood Ali.

Quantity Surveyor

Email adf1ch@r.postjobfree.com.

Mobile:

+91-846*******

2 of 4

EXPEREINCES :

Company : SAARK CONSTRUCTIONS (CONTRACTOR).

Position : QUANTITY SURVEYOR.

Duration : Dec 2017 to Till Date.

Project : THE BOTANICA (RESIDENTIAL TOWERS).

Responsibilities:

Responsible for Taking Quantities of Sub-Structure, Super Structure, Block Works, Painting all Interior Works. Preparing Bar Bending Schedule, Checking Monthly bills of Contractor based on work done on side on percentage basis. Attainding Minutes of Meeting (MOM) on site for getting work done as per Schedule Time. Responsible for Preparing budget for Extra Work on site before giving work to Contractor.

Review monthly payment certificates, record of weekly progress of execution of work for updating the construction master schedule. Company : AMEC FOSTER WHEELER SOFCON (EPC).

Position : QUANTITY SURVEYOR.

Duration : Jun 2014 to August 2016.

Project : Packaging Centre.

Saudi Aramco & Dow Chemicals (SADARA).

Responsibilities:

Responsible for Comparing and checking Contractor’s quantities of entire civil works, Foundations including, Pipe and Cable Rack, Basin Foundation, Vessel Foundations and Transformer’s Foundation. Substation Buildings. Sewerage line network, Storm Water Drainage System, Instrument and Electrical Trench. Installation of Storm water drainage system. Installation of Catch basins, Computation of Manholes Quantities, Installation of Sewer pipeline network Storm water drainage system, in plant and outside the plant, Installation of 3 of 4

Sewerage drainage system Construction of Manholes connecting of new network to the existing network.

Review monthly payment certificates, record of weekly progress of execution of work for updating the construction master schedule. Company : ASTALDI ARABIA LTD.

Position : QUANTITY SURVEYOR.

Duration : Dec 2010 to Jan 2014.

Project : Package 2A, Jubail Export Refinery Project (JERP). Saudi Aramco Total Oil and Refinery Project (SATORP). Responsibilities:

Responsible for computation of quantities of entire civil work, foundations including, Pipe and Cable Rack, Basin Foundation, Vessel Foundations and Transformer’s Foundation. Substation Buildings, Process Interface Buildings. Sewerage line network, Storm Water Drainage System, Instrument and Electrical Trench. Installation of Storm water drainage system. Installation of Catch basins, Computation of Manholes Quantities, Installation of Sewer pipeline network Storm water drainage system, in plant and outside the plant, Installation of Sewerage drainage system Construction of Manholes connecting of new network to the existing network.

Managing All site activities and Project Control.

STEEL STRUCTURAL WORKS: Computation of quantities, supervising Excavation, the Construction of Foundation fabrication of structural steel members compliance with the shop drawings/working drawings, torque bolt tightening, Erection of the steel structural works, monitor implementation of structural works as per the design and project specifications, and approved drawing, involved in QC dossier submitting to the SABIC according to the project requirements.

Familiar with:

Scraper Launcher/ Receiver Supports, Onshore Pipe supports, Anchor Blocks, Piles and Pile cap, Transformer Foundations, Steel structures Access Platforms Material Take off calculation Using Excel Spread Sheet, Pipe racks, Steel Structure pipe supports, Warehouse structures, and Industrial buildings, Pipe racks.

4 of 4

Good Knowledge of Saudi ARAMCO Standards such as SAES, SAMMS steel structures, Industries Codes and Standards such as ACI, BS, AISC API etc. EDUCATION:

Degree: Bachelor in Commerce

Year of Graduation: 2010

University: Anwar-ul-Uloom College

Hyderabad, India - 500001

Degree: B.Tech in Civil Engineering

Year of Graduation: 2015

University: Jawaharlal Nehru Technology University. Hyderabad, India – 500001.

Degree: Diploma in Chartered Quantity Surveyor

Year of Graduation: 2018

University: Al-Madina College of Chartered Quantity Survey. Hyderabad, India – 500001.

TRAINING/COURSES:

AutoCAD 2006/Microsoft Excel/Microsoft Word/Power Point Actively participated in the training course of Computer aided Drafting AutoCAD professional from CAT Academy, Hyderabad, India. Prepare Spread sheet for calculation on Microsoft Excel for quantities and bill of quantities.

Using Microsoft word for prepare reports and documentations. MOHAMMED MAQSOOD ALI



Contact this candidate