UP TIWIGA FIBERGLAS LIMITED . Sikandrabad, bulandsahar U.P.
(Feb2019 to Present)
Deputy Manager (maintenance and utilities)
Projects;-
New chimney installation 30 meter high
New DG 1000 KVA installation with 30 meter chimney
New rollup station installation.
New chopper installation.
LPG tank 50mt removed.
Water saving projects
Reduce energy consumption
Reduce compress air consumptions.
Ball mill drive modifications.
Silo discharger modifications
SAP PM module implementation (with sevic)
H & R JOHNSON (I) LTD., PANVEL, NAVI MUMBAI, MAHARASHTRA (JUN2008-FEB2019)
JUNIAR ENGINEER IN MAINTENANCE DPT.
MAGNUM STRIPS AND TUBE Ltd. GURGAON, HARIYANA (JUN2007-JUN2008)
JUNIAR ENGINEER IN MAINTENANCE DPT.
HOT LINE CPT Ltd. GWALIOR M.P. (JAN2005-JUN2007)
AS A TARAINI ENGINEER IN CENTRAL MAINTENANCE DPT.
EDUCATIONAL DETAIL
10TH FROM GWALIOR BHOPAL BOARD
12TH FROM GWALIOR BHOPAL BOARD
COLLEGE AND TECHNICAL EDUCATION,DIPLOMA IN MACHANICAL ENGINEERING IN 2005January
Selected for 1st job from collage campus interview.
PERSONAL DETAILS
Date of birth : May 25, 1983
Father’s Name : R. B. Gour
Nationality : Indian
Marital Status : : Married
Language known : Hindi, English, Marathi
RISPONSIBILITIS AND DUTIES
Manages the plant’s maintenance departments including spare parts, inventory, budget, and compliance with environmental and safety regulations.
Implements a wide variety of engineering solutions to increase equipment availability, increase net operating rate, reduce operation losses, and achieve standard and acceptable production rates.
Spares development as comparison with OEM for cost saving & life enhancement.
Assure that maintenance activities should be done according to the normal and the material is used according to the standards.
Manages annual budget, including maintenance, new projects, and operation consumables.
Implementation of project activities, vendor end inspection of materials.
Increased equipment consistency by 35% by developing and presenting a maintenance plan that included preventive, predictive, and corrective procedures and by using data collection equipment to implement a predictive maintenance and reliability analysis.
Applied Preventive maintenance plan to elicit faster repairs, improve equipment efficiency, and reduce shutdowns.
Sustains and improves reliability, plant operation, maintenance, and systems documentation for a leading Trailer Manufacturing Industry.
Introduced and developed an approach to maintenance incorporating principles of TPM, 5’s, MTBF & MTTR and the Kaizen philosophy, and then created plans, programs, and strategies for personnel and equipment improvement.
Completed several projects with accuracy by proper coordination with team members as a Team Leader Within the specified period of time.
Supervised Engineers, Technician responsible for executing risk management, maintenance plans, and compliance with all state regulations and certifications for several areas.
ISO 9001, 14001, 18001 Audits, Documentation & Implementation as per standard
Used Skills Microsoft Office, Auto Cad, SAP
SKILLS SUMMARY
Utilities Equipments Compressors(ELGI E-90), chillers, cooling towers, NG gas, LPG Gas, fork lift, loader Water and Compressed air pipe lines
Special job Conveyor and Bucket elevators Maintenance I have about 250 numbers of rubber belt conveyors and 6 bucket elevators. In My Machine concept. Which have about 5km length and his related machinery chutes, Silos, detectors, dischargers, vibrating screens, separators, screw conveyors, weighing conveyors.
Spray dyers and his related systems like Blower fans (1lac m / min), dust collectors, burners, and chain stoves, piston pumps and vibrating screens.
Agitator (blunting machine) stirring machine to high viscosity material (100 tom batch)
Ball mills (grinding machine) up to 40 ton output in one batch, load up to 100 ton.
Pumps: Centrifugal, Diaphragm and hydraulic powered, positive displacement pumps, including reciprocating pump. Special pumps- piston pumps (out put pressure 30bar)
Machines: Hydraulic machines, Pneumatic machines, Screw compressors, Pumps, Motors, Generators (200Kva, 380 Kva), Heavy rotatory machines, Chillers, Heat Exchangers, PLC Operated Machines.
Preventive: Development and implementation of scheduled maintenance programs and lubrication plans, overhauls, inspections, draft tasks, instruction books, procedures, checklists, and emergency response programs
Predictive: Development and implementation of data collection systems and programs, fault trees, root cause analysis, temperature and vibration spectrum analysis, lubrication analysis, thermal growth, alignment and bearing management, report and procedure drafting, and trend analysis and spectrum generation to prevent breakdowns
Corrective: Development and implementation of corrective actions such as laser alignment, balancing, lubrication plans, maintenance frequency, and training
Training: Development and implementation of personnel training, including SOPs, checklists, and instruction books
Conveyors: Screw, Flat Belt, V Belt, bucket elevators, and transport lines.
Drum dryers: Furnaces and rotating dryers, vertical dryers, and duct heaters.