Rajesh Kumar, CEng
Mobile: +1-609-***-****
E-Mail: **********@*****.***
Seeking assignment in Project Management role with a reputed organization, preferably in Construction or Consulting industry.
Profile Snapshot
11+ years of experience in:
Project Execution & Management Safety Management Design Review & BOQ Preparation
Testing & Commissioning Site Management Team Management
Procurement Coordination Quality Assurance & Control
Displayed competencies in effective planning, executing and spearheading construction projects involving Method engineering, development, contract administration, resource planning with a flair for adopting modern construction methodologies in compliance with quality standards
Proficient in swiftly ramping up projects with competent cross-functional skills and ensuring on time deliverables within pre-set cost parameters
Exemplary relationship management, communication skills with the ability to network with project members, consultants, contractors, sub-contractors and statutory agencies with consummate ease
Proven skills in carrying out installations for Electrical system such as HT/LT system, BMS, PLC / SCADA, PA and BMS integration with other services
Experience in implementing cost saving measures to achieve substantial reduction in terms of raw materials, manpower and machine utilization
Exposure of MEP & Construction related activities of Airport, hospital, Data Centre and High Rise Buildings
Possess good interpersonal, analytical and problem solving skills with a willingness to learn
Work Experience
Key Result Areas
Project Management
Evaluating project, present cost / benefits analysis at project decision points; finalizing requirements and specifications in consultation with collaborators / promoters as well as project scheduling including material & manpower planning
Anchoring on-site construction activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize the output; detailing of Electrical and BMS related works i.e. preparing BOQ, shop drawings & work methodology
Construction/ Site Management
Supervising all construction activities including providing technical inputs for methodologies of construction & coordinating with Site Management
Preparing and reviewing Method Statements, Work Specific Quality Control Plans as per specifications of contract document
Installation & Commissioning
Managing the installation & commissioning of equipment, conducting tests & inspections to ensure operational effectiveness of utilities
Reviewing engineering drawings, layouts, diagrams, technical and cost estimates for commissioning
Managing all aspects of installation, Testing & commissioning and handing over of Electrical and BMS system along with all integration.
Assignments Handled with Accomplishments
Since May ’19 to Feb ‘2020 Turner Construction Company as MEP Engineer
May’19- Feb ’2020 as MEP Engineer (Project Management Consultant)
Worked as Project Management Consultant at C-17 Bed-down Facilities project with the client Boeing / US Army Corps of Engineers.
Manages all aspects of project management including budgeting, scheduling, procurement, quality, risk, design coordination, efficient monitoring & project review & closeout.
Involved in materials take off and defining the project scope, creating project plans and get approvals from client.
Tracking daily progress against project plan and analyzing variances at project and generating variance report.
Created issue log and tracked and updated throughout the project cycle.
Generated Risk register and updated throughout the project cycle.
Inspecting material, installation & commissioning inspection as per the quality requirements.
Responding to the contractors technical RFIs.
Verifying design for adherence to international standards.
Coordinating with end users for handing over and closeout of the project.
Since Jan ’16 to May ‘19 Alemco Zawawi, Muscat, Oman as Lead MEP Engineer
Jan’18– May’19 as Lead MEP Engineer
Worked as Lead MEP Commissioning Engineer at LIWA Plastic Project with the client Tecnimont / Orpic.
Develops and executes Pre-Commissioning Checklists, Commissioning check lists and performance / functional checklists of MEP Systems.
Involve in design coordination with internal MEP departments and external design organizations for better understanding and expectations of design documents.
Participates within commissioning team including meetings, field tests and stakeholders inquiries
Prepared B.O.Q, Materials Takeoff and Procurement of materials.
Communicates information to all project team members in design, execution and commissioning positions
Liasoning with client, consultant and main contractor, and concern authorities.
Demonstrates ability to recognize design conditions and raise RFI's, to the design engineer or clients for solutions.
Coordination with site supervisors, Project Manager and client representatives.
Managed Testing & Commissioning of Electrical, HVAC and Instrumentation System in coordination with vendors.
Jan’16 – Dec’17 as Lead Electrical Engineer
Managed Electrical and ELV work as Lead Electrical Engineer at BP Khazzan Project Block-61 with the client British Petroleum.
Involve in design coordination, supervision and Execution of Electrical installation of Data Centers, Residential Blocks, Recreation Centre, Substations, Swimming Pool, Mosque, Laundry, Kitchen, Plant rooms and External Lighting.
Knowledge of installation testing and commissioning of ELV system i.e. fire alarm system, intercom system, central battery system, Security system, Structural cabling system etc.
Preparing B.O.Q, tendering, Materials Takeoff and Procurement of materials.
Lesioning with client, consultant and main contractor, concern authorities.
Design review, Co-ordination of activities, cost control and follow up of MEP Package with clients, Main contractors, statutory authorities etc.
Preparing shop drawing, single line diagram and Interconnection Diagram.
Design check such as Voltage Drop Calculation, Cable Sizing, Tray / Trucking Sizing, Load Schedule, Schematic Diagram, etc.
Coordination with site supervisors, construction managers.
Prepare of Operation& Maintenance manual / As Built drawings and final documentation
High enthusiasm level helps to mix around easily with people of all age groups.
Report to the Project Manager
Pivotal in managing complete Electrical distribution system, BMS, EPDMS PA system, and Access control System work for Khazzan Residential Building which consists of 02 RMU, 02 Transformers, 89 LV Panels, 02 DGs, 38 UPS, Field Devices / Instruments, and LV / MV Cabling.
Streamlined the permit to work and isolation process to avoid hazards & spread awareness in workers for the same
Coordinating with the Central Processing Facility plant for HV cabling Terminations and energization.
Coordinating effectively site interfaces with other related engineering disciplines.
Since Sep’14 to Nov’15 Al Fara’a General Contracting CO. LLC, UAE as MEP Coordinator
Sep’14 – Nov’15 as MEP Coordinator
Efficiently managed MEP works on SKMC Project (Sheikh Khalifa Medical City Dialysis Centre) Project, Abu Dhabi.
Conducting inspections for installation of MEP works with consultant
Conducting coordination meetings with various services sub-contractors and with site team to speed up the execution
Coordinating at site with various services to speed up the construction activities
Tracking day to day progress at site
Design Review of MEP System for Dialysis center
Coordinate and prepares RFI (request for information) for consultants review on discrepancies on the details
Coordinating with consultant and various vendors for material approvals as per specification
Coordinates with client / consultant for changes and variations
Responsible for temporary facilities works at site. (Lighting, power, Wild Air System etc.)
Since Jun’08 to Sep’14 Larsen & Toubro Limited as Electrical Engineer
Jan’12 – Sep’14 as Engineer (Electrical & ELV)
Successfully managed Electrical & ELV system at tallest Air Traffic Control Tower Project. (Tallest ATC in India of 102 m height).
Efficiently conducted inspections for installation and commissioning activities as per quality standards
Instrumental in handling ACC building while responding to design co-ordination, installation testing & commissioning of Electrical, BMS, PLC / SCADA and PA System
Pivotal in managing complete Electrical, BMS, PLC / SCADA and PA system work for Air Traffic Control Tower, which consists of 01 HT Panel, 04 Transformers, 89 LT Panels, 03 DGs, 12 UPS, Bus Duct, 97 DDC Panels, 784 Field Devices / Instruments, 66KM of Cabling and 40 Km of Conducting 12 PLC panel and 700 speakers.
Received Quality Award and 5 million Safe Men Hour Award
Undergone safety operating procedures and educated the team on the same quality
Initiated and streamlined the permit to work process for substation to avoid hazards & spread awareness in workers for the same
Jul’09 – Dec’11 as Building Management System Engineer
Instrumental in managing the BMS System at Delhi International Airport, Terminal-3, project worth 2.7 Billion USD
Deputed as Building Management System (BMS) In-charge for Passenger Terminal Building thereby responding to installation and testing & commissioning of BMS System
Efficiently coordinated with design team & checked system with consideration of National & International codes and standards
Deftly managing activities related to troubleshooting & testing
Successfully worked on equipment & System like:
oPower & Control Cable, LT Panel, Earthing, Variable Frequency Drive, Used Honeywell Based System, Sensors, Actuators, Ultrasonic Flow Meter, Variable air volume, Motorized valve and dampers, Microcontroller
oHoneywell EBI Based System using BACNET Protocol, Networking through Optical Fiber Cable, LAN Racks & Switches, Servers and Control Station
Successfully handled integration of CMS with other services like PHE, FDP, Electrical system and ITBMS using other protocol such as MODBUS, N2, etc. and with Integrated Building Management System (IBMS) using Main Network Interface (MNI)
Jun’08 – Jun’09 as Asst. Planning Engineer
Efficiently worked on Delhi International Airport, Terminal-3 Project
Developed construction plan for the month and deftly monitored project progress by updating EPC sheet
Generated invoice for the month & follow up with client for payment certification on regular basis
Successfully stabilized and maintained pleasant tracking system for 25000 documents as per ISO compliances
IT Skills Set
Operating System : Windows
Planning and Managements Tools : MS Office, MS Project, AutoCAD
Electrical Software : ETAP, DIALux
Trainings Attended
Supervisory Development Program organized by Larsen & Toubro Ltd
Construction Method & Planning, Contracts Management via. Various training programs as a part of professional development by Larsen & Toubro Ltd
Control of work, by British Petroleum / Jacobs.
Risk Assessment by British Petroleum / Jacobs.
Energy Isolation by British Petroleum / Jacobs
Leadership Training by British Petroleum / Jacobs
Education
Master of Technology (Electrical-Power Systems) in 2015 from Jodhpur National University.
Bachelor of Technology (Electronics and Telecommunication) in 2012 from Janardan Rai Nagar Rajasthan Vidyapeeth University.
Diploma in Instrumentation & Control Engineering in 2008 from Institute of Engineering & Rural Technology.
Certificate of Design Engineer Electrical in 2019 from Advance Electrical Design & Engineering Institute.
Certifications
Acquire PMP Training from IACT Global.
Quality certificate for good quality work from Larsen & Toubro Ltd
Performing Authority from British Petroleum / Jacobs
Isolation Authority from British Petroleum / Jacobs
Chartered Engineer [India]
OSHA 30 Hour Construction
Pursuing PMP (Expected in Sep 2020)
Personal Details
Date of Birth : 16th Apr 1989
LinkedIn profile : https://www.linkedin.com/in/rajesh-kumar-ceng-24b7b72a/
Nationality : Indian
Work Authorization : H4 EAD