Personal Data:
Name : DHAMODHARAN.A
D.O.B : 07/20/1993
Age : 27
Marital Status: Married
Phone No: 811******* &
Email:
**********************@*****.***
Blood Group : B+ve
Sex : Male
Nationality : Indian
Languages
Known : English &Tamil
Qualification:
B.E Mechanical Engineering
Contact Address:
No 3/186 Kaliamman Kovil St,
Kaspa, Arcot - (632503)
Vellore (Dist).
Parents Name:
Father’s Name :
Mr.Anbalagan.A
Mother’s Name: Mrs.Vijaya.A
CURRICULUM VITAE
CARRER OBJECTIVE:
To achieve a challenging position in a result oriented organization where my acquired skills, creativity, knowledge and experience will be utilized towards continued growth and advancement.
EDUCATIONAL QUALIFICATION:
B.E Mechanical Engineering
-Adhiparasakthi Engineering College, Melmaruvathur.
-Attained 83% of Marks
-2011 - 2014
Diploma
-T.P.E.V.R.Government Polytechnic College, Vellore.
-Attained 87 % of Marks
-2008 - 2011
S.S.L.C.
-Government Boys Higher Secondary School, Arcot,
-Attained 82% of Marks
- Passed Out- April 2008
TECHNICAL SOFTWARE SKILS:
AUTO CAD
SOLID WORKS
FARO CMM (BASICS)
AREA OF INTEREST:
Quality Assurance
New Product development
PROFESSIONAL WORK EXPERIENCE:
Designation : Quality Engineer
Organization : Wheels India Limited, Thodukadu
Duration : JUN 2018 to Till Date
Designation : Quality Engineer
Organization : AceTech Heavy Fabrication pvt ltd, Padurmedu
Duration : FEB 2016 to MAY 2018
Designation : Graduate Apprentice& Engineer Trainee
Organization : Brakes India Private Ltd, Sholinghur
Duration : JUN 2014 to FEB 2016
COMPANY PROFILE:
Wheels India Ltd is a renowned company in producing and supplying the Heavy & Lite Fabrication product of the process Laser cutting, CNC bending, Mig Welding .
It is an ISO/9001:2008 Certified company by TUV. We supplies the components to Leading Company, Tier 1 For CATERPILLAR, and Tafe.
JOB DESCRIPTION:
To carry out Inward Inspection, In process / Stage Inspection & Final Inspection.
Preparing ballooning for new drawing, To make inspection plan, control plan& checking aids for components.
Timely Feedback to Production to control on dimensions & defects.
In Inspection found any non con-formality to Raising NCR for defects component.
Identify the root cause of the problem and take corrective action and preventive action for Non-conformance.
Coordinate customer for final inspection with all related documents.
Immediate action for Customer complaints and Provide 8D report for NC component.
Maintain records of Instrument Calibration, Status and Identification of Calibrated Instruments and frequency of Calibration.
New gauge developing as per the job requirement.
Conduct Layer process audit and support for customer audit & ISO audit.
WORKING KNOWLEDGE IN FOLLOWING SYSTEMS:
Preparing Control Plan, PPAP, PFD & PFMEA.
Updating of Control plan, PFMEA, PFD & SOP for customer issue & In-house issue.
Implementation of 7 QC Tools, SPC in Shop Floor.
Worked in MSA system for qualifying 5M.
Conducting Audit like Product, Process, Layout, 5S.
ACHIEVEMENTS:
Qualified as internal layer process auditor.
Maintain zero PPM for kobelco customer components in last two years.
Got 90% mark scored in general measurement & weld appearance exam conducted by kobelco (KCEI).
Dimensional wise issues reduced by Calibrating every Weld fixtures, Jigs, Receiving gauges, and Templates.
To standardize the filling and blasting process, its save 3 lakhs per months.
Rapid improvement Workshop (RIW) Champion certified in internally.
RECEIVING QUALITY:
Improvising supplier by educating about the customer needs and conducting supplier audit by weekly basis and it results good results for outsourced parts.
Controlled in-house complaints by providing several quality gates in in-ward.
Resolved piece part issues by monitoring the supplier at monthly basis.
KOBELCO:
Maintained Zero PPM in in-process and Customer complaints one and half years for
Kobelco counter weight & D class parts.
GH counter weight critical profile to achieve with fixture control without quality issues.
GH assembly fixture to be made for assembly purpose in crane with knowledge of kobelco cranes.
JD counter weight to maintain the in-line of the base hook, of 113 tones counter weight to achieve by providing the fit-up fixture and checking templates.
GN counter weight assembly hook weld is critical and dimension measurement also, to made receiver gauge to achieve it.
GB counter weight to follow up the development level in every stage of fit-up, and to arrest the welding distortion by providing fixtures.
D class parts of cover assembly, platform, handrail & step to be developed and provided for checking templates.
CATERPILLAR:
Rectified the distortion in sheet plate of hex counter weight by changing the strich weld sequence.
Cabin for 777/773 to control the in-line issue by modifying fixture in poke-yoke method.
Development Titan cabin to make the fit-up fixture for all subassembly parts with arrest of weld distortion.
Maintained Zero PPM Customer complaint for last six month in cabin fabrication.
To implement BIQ check sheet in each & every stage of fit-up to control the defect.
To inspection the component as per the standard.
To prepare the document for BGWF audit of caterpillar.
DAIMLER:
More than 70 child part having component of under frame to be made with fit-up fixture, to maintain 5 mm flatness and control in check sheet and templates.
To provide the 8 stage wise fitup fixture for common podest to arrest all dimension with less inspection time consume.
PROJECTS:
MAIN PROJECT - “FABRICATION AND TESTING OF FIBER REINFORCED POLYMER COMPOSITE MATERIALS”
MINI PROJECT - “DESIGN AND FABRICATION OF POLYMER COMPOSITE MATERIAL SETUP
OTHER INFORMATION:
My Strength’s : Quick Leaner, Team player, Positive Thinker, Decision Making & Dedication towards the work.
Hobbies :Solving sudoku, Playing cricket and Listening Music,
DECLARATION
I hereby declare that the above information mentioned by me is correct to the best of my knowledge and belief. If i get an opportunity to serve in your esteemed organization, I shall assure you to the best of my capability for the entire satisfaction of my superiors.
THANK YOU
Place: Arcot Yours Sincerely
Date: 11-09-2020 DHAMODHARAN A