Ravi Kiran Kappala
Ph : +91-905******* ; +91-807*******
*******.*********@*****.***
SUMMARY
I, by carrying 3+ years of experience, in QS, Billing & Execution work, had a handful knowledge in various aspects like preparation of Rate-Analysis, BOQ’s, DLR’s, DPR’s, Work-Orders for contractors, reconciliation of materials, RA- Bills, Sub contractor Bills. While handling various irrigational works like construction of weirs, regulators, off-takes and canal earth-work acquired handful of experience in preparation of sub-contractor bills and client bills. My experience includes coordinating with clients, pmc’s and sub-contractors for the ease of work. OTHER PROFESSIONAL QUALIFICATIONS/ CERTIFICATIONS/COURSES
Good at RA-Bill, Sub-Contractor bill preparation, BOQ preparation & Rate analysis.
Good at BBS preparation and quantification of work.
Expertise in handling auto-level.
Effective in preparing working estimates.
Good at handling of Ms-Excel.
Good at handling Auto-Cad.
EDUCATION
Qualification College/ University Year CGPA/%
B.Tech (Civil) Aditya Engineering College, JNTUK 2016 72.79 XII Narayana Junior College, AP Board 2012 95.3
X Yeleswaram public school, AP Board 2010 87.16
PROFESSIONAL EXPERIENCE
Sri SCL INFRATECH LIMITED
(Junior Engineer)
RVNL Projects
(QS & Correspondence)
Nov 2019 to TD
Key Projects:
1. Doubling of Railway line from Vijayawada to Moturu (Formation of Road bed, P-Way Linking, OHE & S&T)- Vijayawada-A.P-Package-I.
2. Doubling of Railway line from Bhimavaram to Nidadavole (Formation of Road bed, Platforms, Station Yards, Minor bridges, Major bridges, Station Buildings, Ballast supply & spreading, P-Way Linking, OHE & S&T)- Bhimavaram-A.P-Package-III.
3. Formation of new Railway Lines from Marshaghai to Dhumukha region-Kendrapara-Orissa-Package-2(a). 4. Doubling of Railway line from Usargon to Bhimsen-Kanpur-U.P-Package-3. Working as a Correspondence and QS Engineer for the above Railway works from the H.O. Key Responsibilities:
Rate analysis for various items for execution.
Rate analysis for various NS & NNS items of work.
Preparation of BOQ.
Cost-Analysis for Tender Bidding.
Reconciliation of materials.
Checking of RA-Bills.
Preparation of Sub-Contractor Bills.
Preparation of Daily progress reports.
Daily monitoring of work by comparing DPR with Programme.
Preparation of Strip-Charts by close monitoring weekly progress of work.
Correspondence with Sub-Contractors, PMC and Client through mails and letters.
Preparation of drafts for EOT’s and Claims.
Coordinating with site staff and make them to achieve the Physical and Financial targets by providing required assistance from the office.
Sivanssh infrastructure development Pvt ltd
(Junior-Engineer)
PMAY-Phase-II
(Jr.QS and Waterproofing Engineer)
April’19 to July’19
Construction of apartments in G+3 pattern using MIVAN technology form work and SCC Concrete in design of Shear wall.
Key Responsibilities:
Preparation of BOQ.
Preparation of BBS.
Checking of RA-Bills.
Preparation of Sub-Contractor bills.
Preparation of DLR’s, DPR’s, MPR’s.
Reconciliation of materials like Cement, Steel and other misc. items.
Dampness checking and Water-proofing for slabs, water tanks.
Kicker leakage corrections by Pressure grouting.
Wet proof coating and Screed Concreting for terrace slabs.
Water leakage corrections by Haunching’s and water-proofing.
Steel and MIVAN form-work checking.
Concrete castings of structures by Boom-Placers.
Checking of Finishing works.
K Raveendra Constructions
(Junior-Engineer)
Modernisation of Yeleru irrigation
canal and Drainage system.
(JE-QS & Execution)
April-2017 to April-2019
Construction of various irrigation structures like Surplus weirs, Canal regulators, Bed regulators and Off-take sluices. I as a JE dealt with Construction of a Surplus-Weir and a Bed-Regulator. Key Responsibilities:
Rate analysis for various items of work.
Preparation of Deviation statements.
Preparation of BOQ.
Preparation of BBS.
Preparation of Canal field excavation levels from HP’s.
Preparation of Sub-Contractor bills.
Preparation of LF books.
Preparation of DLR’s, DPR’s, MPR’s.
Reconciliation of materials like Cement, Steel, Sand and Coarse aggregates.
Checking of shuttering work as per drawing requirements.
Checking of Steel reinforcement as per vetted drawings.
Concrete pouring as per design mix in approved procedure.
Profile and longitudinal levelling using Auto-Levels.
Installing of TBM’s and PBM’s by DCBM process.
NJR Constructions Pvt Ltd
(Junior-Engineer)
1.Renovation of Berm park
2.Construction of Shilparamam
(GET & JE-QS & Execution)
May-2016 to Feb-2017
1. Construction of Office buildings, Amphi-Theatre, Food-Courts and shops in Shilparamam-Kakinada. 2. Renovation of Berm Park and the APTDC Executive Guest houses in Punnami ghat-Vijayawada. Key Responsibilities:
Rate analysis for various items of work.
Preparation of Deviation statements.
Preparation of BOQ.
Preparation of RA bills.
Preparation of Sub-Contractor bills.
Preparation of DLR’s, DPR’s, MPR’s.
Reconciliation of materials like Cement, Steel, Sand and Coarse aggregates.
Checking the quality of work and make sure to match the standards prescribed in Contract Agreement.
Checking of various items like Foundations, Super-structures, Brick-work, plastering and Finishing works. OTHER PROFESSIONAL QUALIFICATIONS/ CERTIFICATIONS/COURSES
Certified in handling Total-Station by IGIAT.
ISO certified in E-TABS.
Fully trained in Autodesk-Revit by APSSDC.
Certificate in Auto-Cad by AUTODESK.