Good knowledge in Eeectrical lighting layouts and protection scheme

Location:
Chennai, Tamil Nadu, India
Posted:
August 01, 2020

Contact this candidate

Resume:

*years’ experience in AutoCAD on power plant lighting layout.

2years’ experience in the field of Testing and Commissioning in Power system products, look forward for an opportunity to display my skills in the field of Protection and testing & commissioning and execution of projects related to power systems.

EDUCATIONAL QUALIFICATION

Diploma in Electrical and Electronics Engineering from Panimalar Polytechnic college, Chennai, Tamilnadu, India on April 2012

B.E in Electrical and Electronics Engineering from Jeppiaar Engineering college, Chennai, Tamilnadu, India on April 2015

STRENGTHS

Having Knowledge in protective relays, Testing and Commissioning, Operation Maintenance of Electrical Equipment in Switchyards and Switchgears.

Testing and commissioning of all Type of Control and Relay Panel of both LV & HV System.

Having kn0wledge in testing software like AcSELerator Quickset, PCM 600, MiCOM S1 Studio, WPLsoft, Test universe

WORK EXPERIENCE

VENERGY ENGINEERS & CONSULTANT: Chennai

Designing the electrical wiring & lighting layout to power plant and calculating the lighting calculation

(LUX Calculation) for light density for equipment rooms in power plant for ABB

Position: Electrical Design Engineer (AUG2015 to NOV2017)

VECTOR GROUP, HQ: Chennai, www.vpec.in

(VECTOR POWER ENGINEERING CONSULTANTS PVT LTD, a popular concern having its operations in Energy Sector since 2010 and it provides specialized consultancy services in the field of design, detailed engineering, project management and execution of energy and industrial automation projects)

Position: Electrical Testing & Commissioning Engineer (JAN2018 to DEC2019)

SITE HANDLED

2x600MW NTPC, Meja, Allahabad, Uttar Pradesh for MEGAWIN panel

(Did 6.6kV switchgear panels equipment and Relay testing, Scheme checking & Operation Checking)

2X800MW NTPC, Darlipali, Odisha for MEGAWIN panel

(Did 11kV switchgear panels equipment and Relay testing, Scheme checking & Operation Checking)

Factory testing of control and relay panel 400kV, 220kV, 110kV for, NR Mumbai.

2X800MW NTPC, Darlipali, Odisha for MEGAWIN panel

(Did 33kV switchgear panels hipot test for bus bar & braker)

11kV UNIT MSTPP SWITCHGEAR NTPC, Meja, UP for MEGAWIN panel

(Did 11kV switchgear panels equipment and Relay testing, Scheme checking & Operation checking)

325MW NTPC, Farakka, West Bengal for MEGAWIN panel

(Did SEL 751-A, SEL 787, SEL 710 relay testing with OMICRON kit)

2X800MW STPP 2X800MW NTPC, Darlipali, Odisha for MEGAWIN panel

(Did 3.3kV switchgear panels equipment and Relay testing, Scheme checking & Operation checking)

4X250MW NTPC, Nabinagar, Bihar for TSL panel

(Did 415V switchgear panels equipment and Relay testing, Scheme checking & Operation checking)

2X800MW STPP 2X800MW NTPC, Darlipali, Odisha for MEGAWIN panel

(Did 11kV switchgear panels equipment and Relay testing, Scheme checking & Operation checking)

4X250MW NTPC, Nabinagar, Bihar for MEGAWIN

(Did 6.6kV switchgear panels equipment and Relay testing, Scheme checking & Operation checking)

2X800MW NTPC, Darlipali, Odisha for MEGAWIN panel

(Did SEL 751-A, SEL 787, SEL 710 relay testing with OMICRON kit)

2X800MW NTPC, Miscellaneous Switchgear Darlipali, Odisha. Panel Make: MEGAWIN

(Did 11kV switchgear panels equipment and Relay testing, Scheme checking & Operation Checking)

RESPOSSIBILITES IN SITE

Pre and Post Checking of Switchgear Panels including visual, mechanical and functional Testing as per relevant International Standard and Factory Quality Management System (QMS) Procedures

Need to interpret block logic diagrams and equipment Detailed Schematic drawings of Switchgear and ensure the complete Scheme/logic verification as per the Approved Drawings requirements

Current Transformers (CT’s), Voltage Transformers (VT’s) and CBCT’s routine internal testing for Switchgear

Functional and Mechanical Testing of Vacuum Circuit Breakers

Communicating with relay and insert the setting file given by the client into the relay and testing all the protections mentioned in the relay setting file

Performing Bus-bar Contact Resistance Measurement test and Hi-pot Test of switchgears

Troubleshooting the problems and defects in the switchgear equipments while testing

Planning the testing activates based on the given target time

Preparation of Daily Progress reports and send to company and client

Ensuring and maintaining excellent reports of all testing activities and send to the client and

Processing of invoices/bills

RELAY HANDLED

ALSTOM-P127(Motor protection)

NR-PCS902 ( Distance protection)

NR-PCS978 ( Differential protection)

NR-PCS9705 ( Bay Control Unit)

MICOM - P127( O/C & E/F protection)

MICOM - P444 ( Distance protection)

MICOM – P642 ( Differential protection)

SEL-710(Motor protection)

SEL-751A-( O/C & E/F protection)

TEST EQUIPMENTS USED

MEGGER-SMRT410-3 -(Sec. injection)

PONOVO

OMICRON-CMC356-(Sec. injection)

DOBLE-F6150SV

ALL PRIMARY INJECTION KITS

PERSONAL PROFILE

oFather’s Name : O.SWAMINATHAN

oDate of Birth : 20-05-1993

oSex /Marital Status : Male/ Unmarried

oNationality : Indian

oPermanent Address : No:24/49,Nanchil Corner, New colony

Adambakkam, Chennai, India

oLanguages Known : English, Tamil and Hindi

oCurrent Location : India

DECLARATION

I hereby declare that, the information furnished above is accurate and true to the best of my knowledge and belief.

Place: Date:



Contact this candidate