Resume

Sign in

Engineer Drilling

Location:
Neiva, Huila Department, Colombia
Posted:
July 31, 2020

Contact this candidate

Resume:

}}

Position: Company Man A*

Company: Consultec - ECOPETROL

Address: Av 9ª · 99-02 OF 404

Time: 12 Months

Field: Casabe

Functions: Supervise operations and carry out logistics in Workover / Wellservice / completion in the casabe field (Yondó - Antioquia) such as: Abandonment and re- abandonment, run of ESP / PCP / BM completions, sand cleaning, insulation, fishing, well intervention with selective injection strings and handling of Open Wells. Position: Company Man A2

Company: Consultec - ECOPETROL

Address: Av 9ª · 99-02 OF 404

Time: 7 Months

Field: Yariguies – Cantagallo - Casabe

Functions: Supervise operations and logistics in Workover / wellservice in the Yariguies, Cantagallo and casabe fields, such as Abandonment, ESP / PCP changes and sand cleaning, extraction of completions with mechanical pumping, Supervision of perforating and definitive completions in new drilled wells 2018 and 2019 campaign

(Until February 2019) and handling of Open Wells.

Position: Drilling & Workover Engineer

Company: Amerisur Exploración Colombia Limitada

Address: Tv 21 # 98-71 Floor 6, Bogotá

Time: 25 Months

Fields: Andaquíes (Caquetá), FENIX (Santander), Platanillo (Putumayo), CPO5

(Meta), PUT 8 (Putumayo)

APE ALVARO ANDRÉS DELGADO VEGA

adey54@r.postjobfree.com

C.C. 1.075.215.916 from Neiva. Professional Card: CPIP 5889 Res. 0865 Passport Number: AO 283781

Place and date of Birth: Neiva, September 20

th

, 1986

Address: AV 44 #. 27-35 Tw 1 Flat 605 (Neiva – Huila) Cellphone +578-******* 0550LLIDO

Petroleum Engineer with 9 years of experience in Drilling / Completion and Workover / Wellservice activities in the area of Huila, Putumayo, Caquetá, Santander, Antioquia and eastern plains, highlighting the main strengths of personnel management, teamwork, leadership and sense of belonging institutional. PROFILE

EMPLOYMENT HISTORY

Functions: Perform drilling and Workover programs, develop well designs according to geological objectives, prepare designs for interventions after completion of wells, prepare AFEs related to drilling and Workover, prepare documents for private requests for offers - tenders and / or market surveys, perform technical evaluation of offers, follow up on contracting processes, coordinate logistical support for services during operations, monitor the execution of drilling and Workover work, participate in the definition and execution of civil works, prepare documents required by the regulatory authorities of the business such as the MME and ANH and follow-up projects with strategic partners in Putumayo (Block PUT 8) and Eastern Plains (Block CPO5).

Achievements: Lead between 2017 and 2018 stimulation campaigns with Coiled Tubing in platanillo field (Putumayo) which increase the daily production of the field by 33% and additionally reduce the rates with contractors for 2018. Planning for abandonment of wells in Putumayo (Libélua-1) and Santander (Ave 1, Iguasa 1 and Isabel 1 ST, two with simple completions for natural flow / Hydraulic pumping and another with mechanical pumping). Follow-up of projects with strategic partners in Putumayo (Block PUT 8) and Eastern Plains (Block CPO5) which reduces budgets and drilling times. Presentation of A3 Caballete 1 well project in the municipality of Albania

(Caquetá), raising awareness in the community to achieve continuity in the Andaquíes block project. Link for the second time to the Amerisur Long Term Incentive Plan (LTIP) for exceptional business performance with 90,000 shares since June 23, 2017.

Position: Company Man Assistant in Drilling operations Company: Amerisur Exploración Colombia Limitada

Address: Tv 21 # 98-71 piso 6, Bogotá

Time: 3 Months

Field: San Pedro Block, Jaguareté -1 Well (Liberación - Paraguay) Functions: Importation and technical logistic support in drilling operations in Jaguareté-1 Well located at San Pedro block, daily report processing and costs. Position: Company Man in Workover operations

Company: Amerisur Exploración Colombia Limitada

Address: Tv 21 # 98-71 piso 6, Bogotá

Time: 17 Months

Field: Platanillo (Putumayo)

Functions: Lead and supervise well intervention operations (workover and well service) in platanillo field to increase production by reducing water cut; convert low production wells into water injectors associated with crude oil, run DST-TCP completion strings with sxar technology, cased hole logs, squeeze operations, trhu tubing and TCP perforating, slickline operations and fishing operations. Position: Company Man Assistant in Drilling operations Company: Amerisur Exploración Colombia Limitada

Address: Tv 21 # 98-71 piso 6, Bogotá

Time: 26 Months

Field: Platanillo (Putumayo)

Functions: Logistic and technical support in drilling and workover operations in the wells of the platanillo field, daily reports / cost control Position: Company Man Engineer

Company: Emerald Energy

Field: Gigante

Contractor: Reikcon Holdings Sas

Time: 5 Months

Functions: Logistical and technical support in drilling operations in Gigante (Matambo Block) at 3, 5 and 10 st wells, completion of daily reports / costs in English and weekly presentations in PPT for Bogotá operations

Position: Operations Engineer

Company: Saxon Energy

Field: Gigante

Contractor: Manos de Bogotá

Time: 1 Month

Functions: Logistical and technical support in drilling operations in Gigante (Matambo Block) at 3 and 5 wells, completion of daily reports / costs. Position: Engineer I

Company: GWDC (Great Wall Drilling Company)

Field: Gigante

Contractor: Manos de Bogotá

Time: 7 Months

Functions: Apprentice Engineer - Mud Engineer Assistant, Report Filing and Translator, Fluid Preparation Support, and Field Lab Testing. Position: Practicing Engineer – Estimulation Lab USER ID: hb57681 PSL: PE - lab Company: Halliburton S.A, Neiva

Time: 6 Months

Functions & Achievements: Perform Laboratory tests to characterize crudes, analysis of returns in stimulations and formation waters, design of fracture fluids (delta frac 140-200 system) applying sandwedge technology and compatibility tests. 100% PPR compliance on Ilearn courses.

OPERATIONAL EXPERIENCE

Drilling & Completion Planning, logistics and supervision of exploration and development well drilling and supervision in completion / Workover operations in the Putumayo / llanos basin

(CPO5 block) / Caquetá (Andalucia block) / Casabe (Antioquia), Running TCP- DST, PCP, ESP Strings and hydraulic pumping, WBCO, Interpretation cement logs.

Workover & Wellservices Coiled Tubing, Bullheading Stimulation, Zone Isolation, Reperforating, Remedial Cementation, Milling operations, Cased hole fishing, Injectivity Testing, Abandonment / Re-abandonment, Rigless Operations, Mechanical Pumping, ESP, PCP, Hydraulic Pumping, Conversion of producing wells to injectors and sand cleaning.

SKILLS AND LANGUAGES

APTITUDE

Stress Management Spanish

Fast Learning

Team Work

Software: Excel, Word,

English PowerPoint, Outlook, Open Wells

EDUCATION

Universtity: Surcolombiana

Petroleum Engineer - 2011

Others studies & Courses: Technical Petroleum Institute Technical in drilling Wells – 2003

Chamaleon Resources

RIG PASS - August 26th, 2014

ITP Barrancabermeja

IADC WellSharp – Drilling Operations supervisor, surface (Well Control) May 9th, 2019 (No. Certificated: 107*******-A08EB1) Metrología y servicios

Heights Course

April 27th, 2019

. INGECONHSEQ

Defensive Driving – June 5th, 2019

Training Consultors Colombia S.A.S

STUCK PIPE – September 6th, 2019

Conviction to work safely and with quality

Ability to learn at the pace of the needs of each operation

Constant performance in jobs “under pressure” and with great responsibility

Dynamism when working in a team

Ease of oral and written communication, both in Spanish and English

Ease to teach or explain complex operations to less experienced staff LABOR REFERENCES

JEAN PAUL GARCIA – COMPANY MAN - HOCOL – 313-***-****

INGRID DE LA ROSA – PROFESIONAL SISO - SUBSUELO CASABE – 312-***-****

CARLOS DE LOS RIOS – COMPANY MAN A1 - CONSULTEC – 313-***-****

JOHNNIE VELASCO – VICEPRESIDENTE EJECUTIVO DE OP – GEOPARK - 311-***-****



Contact this candidate