Am maximum well experienced for the following core area’s for 32 years,
(i)Bidding,
(ii)Execution,
(iii)Claims and disputes
(a)Work survey-Interactions with all concern department and collection of variation/extra/new item of claims and motivation on daily basis.
(b)Maintains of Hindrances Registers, Contracts Registers, Contemporary Registers (c) Delay Analysis, Claim Analysis.
(d)Exhibits creations cum collection.
(e)Material evidences collections.
(f)Timely correspondence to Client/Consultant/Sub contractors.
(g)Arbitrations, disputes (SOC Preparations &Submission including re-joinder preparation and timely submission).
(h)Defending the claims and counter claims for Sub Contracts (International Contractors-Al.Ghuraiar, &STAFA, National Contractors –L&T,AMIL, PnR,NIRVANA,REIPL,ITD Cementations, Gem & Bajaj Electricals )
(i)Negotiations of rates cum terms and conditions with client for finalization of New/Variations/Extra items of works.
QUALIFICATIONS:
Master of Business Administration (Project Management)-2013
Diploma in Civil Engineering-1986
Diploma in Concrete Technology & Design of Concrete Structures-1989
Diploma in Construction Management-2012
Bachelor of Business Administration-1995
Contract Management Training (Govt.of India)-2014
(Bachelor of Technology-Third Year)
EXPERIENCES:
At Present Project Leader promoted from Assistant General Manager-Continental Engineering Corporation at Present from 2016
Public Works Department, Delhi- Roads cum Flyover’s Projects-Value of Projects- 443Cr.
Completed of the Project and collected the completion/performance certificate.
Collection .of revenue and achieved the target.
Achievement- Based on performance credited Rs.23.20 lakhs by Management as Incentive .
DGM-Contracts &Claims-Madhucon Projects Limited-2014-16-
Contracts and Claims Handled for,
National Highway Projects for EPC,BOT&DBFOT- value of projects-INR4398Cr
Irrigation Projects for EPC- value of projects – INR944Cr.
Energy Projects for EPC –value of projects-INR 2905Cr.
Oil &Gas Projects for EPC- value of projects-INR155Cr.
Railway Tunnels –value of projects-INR146Cr.
Achievement of this tenure succeeded arbitration without legal assistant
Manager- WSS(Work Survey Section) Contracts cum claim survey in Gammon-Masmetrostry -JV /Chennai Metro Rail Project.(2012-2014).Funded by Japan International Cooperation Agency (JICA)
1.Analysis and Finding the variations based on the approved Specifications, Construction methodology’s and Sequence of works and confirm the same with client/consultant and convert as a claim exhibits. For Diaphragm wall sub- contracts, Sheet Piling, Earth Work and Utility diversions for Underground Metro Station Buildings (Seven), Tunnel pre cast segments, and Voltas for Electro-Mechanical works.
2.Collection and submission of the Contemporary records within specified time as per FIDIC.
3.Claim analysis with reference of FIDIC and periodical submissions of contemporary records as per FIDIC requirements, Collection of the inputs for client corresponding based on FIDIC.
4.Countering the sub-contractors like L&T, Al.Ghurair and HSSG claims for Diaphragm wall sub-contracts, Sheet Piling, Earth Work and Utility diversions for Underground Metro Station Buildings (Seven) and Voltas for Electro-Mechanical works.
GM(Contracts)-Bumi Geo Engineering Pvt. Ltd.-Singapore based MNC/Chennai.(2009-12)
Tendering and Grabbing the New Projects from Govt. as well as Private.
Site mobilizations and execution association- Pipe roofing’s, Slope stabilization, Bored pile foundations, Jet- Grouting, Anchoring, Portal excavations for Hydro tunneling in Sikkim, Railways tunneling in J&K and ROB’s(pre –cast structures) in Bihar at Patna and Muzaffarpur.
Payments collections,
Bidding in association with M/s. Strabeg for Chennai Metro Rail under Ground Projects- 5 packages cost around 7500Cr.
Claims and Arbitration in Railways (IRCON) and other Private Projects.
Organizational Achievement:
Promoted as General Manager from Deputy General Manager during tenure based on Performance.
Team Leader – Aster Infratek Pvt., Ltd., Chennai. Functional Responsibilities –Project Manager
Execution of Civil Work for Cargo sheds at Nagapattinam Port
Tendering for new Projects in Railways and Marine including pile foundation(North Cargo Berth in Tuticorn).(2008)
Project Engineer – Expert-SPA (JV), (Malaysia based,Directed by Mr.Keerthivasan, GM-Retd. from Railway)Project design planning and management consultants- Bangalore.(2006-2008)
Functional Responsibilities –Consultant Project Engineer
Civil Work for station buildings / Major Bridge (40mts deep and 1.2mts dia. bored pile foundations in Kollidam River) & Minor Bridges / Embankment earth work in Railway projects – 60 kms.(RVNL Project)
Project Coordinator – M/s.BUMI DEVELOPERS INDIA PVT. LTD – New Delhi
(MNC)(2000-05)
Functional Responsibilities – co-coordinating the following projects
Teesta project – NHPC – Sikkim
Jammu & Kashmir – Railway project, Qazigund, J&K ( Project Manager -mobilization cum kick-off the north portal)
Road over bridge –NHAI – Nagapattinam – TN
REGISTERED CONTRACTOR – INDIAN RAILWAYS (1996-2000)
Site – Integral Coach Factory – Chennai (Succeeded the Arbitration Proceedings)
Construction of staff quarters (196 units), factory type sheds, boundary walls, unloading facilities of materials by goliath crane, scooter & cycle sheds, pit lines, replacements of door & windows, extension works of staff quarters.
Tendering, Executing and Completion
Managed around 400 workers per day
SUB CONTRACTOR – INDIAN RAILWAYS (1995-1996)
Site – Carriage and Wagon Repair Work Shop – Chennai
Factory Type Sheds (Southern Railways)
SITE ENGINEER to PRPJECT MANAGER - CHOKKALINGAM & CO (1988-1994)
Functional Responsibilities-Tendering to Completion of the following Projects
Project Handled in Integral Coach Factory
Extension of factory buildings (Pre-cast Concrete members like column, trusses, monitor truss, purlin, glazing panel, louvre panels jointing through gazette plate welding and bored pile foundations)
Marriage Halls with driven pile foundations
Hospital Building with bored pile foundations
Administrative Building with bored pile foundations
Ferro Cement Tanks & Static Tanks
Railway Protective Force (RPF) – Barracks Building
Construction of manholes for Residential colonies
Counter Blow Hammer Machine Foundations with pile bored foundations within restricted area’s
Mezzanine Floors for shops (glazed)
Improvements to Staff Quarters
Replacements of AC-Sheet Roofing’s
Provision of Mono Rails
Project Handled in Railways
Station Building Modification
Route Relay Interlocking (RRI) cabin building in Chennai Central Railway Station with pile foundation with-out affecting running railway traffic.
Hospital Building with bored pile foundations
School Building with bored pile foundations
Railway Platform Modifications in Bangalore City
Railway Foot-over bridges from Chennai Beach to Tambaram–dismantling the existing concretes bridges and fabricate and erection of steel bridges for nearly thirteen station without disturbing the running trains mainly erection in the line block (few hours).
Modification of platform shelters
Widening/Strengthening of minor bridges (27 kms. in various locations)
Provision of Bore-well with pipe line for Train coaches in station
Project Handled in Oil & Natural Gas Commission (ONGC)
Hardening the Drill Site
Construction of Approach Roads
Construction of Site Accommodations
Construction of Chemical Storage Sheds
Project Handled in Tata Steel Yard
Hardening the surface by Water Bound Macadam (WBM) & Black Trapping (BT)
Administrative Building with Weigh Bridge
Boundary Walls
Staff Quarters
Overhead Tanks with Well & Pipelines
Covered Storage Shed
Organizational Achievement
Promoted as Project Manager and Business Head during tenure
Managed team of engineers and 400 workers per day
SITE ENGINEER – S.R ENTERPRISES, BILASIPARA, ASSAM (1988)
Functional Responsibilities
Site – Dhubri and Kokrajar District
KVIC (steel fabricated tanks)& Deenabandu Type Bio gas Tanks (State-Assam)
TECHNICAL ASSISTANT – TAMILNADU STATE GOVERNMENT (INDIA) – 1986
– 1988
Functional Responsibilities Site – Zoological Park Chennai
Mass Random Rubble Masonry – Animal Enclosures & boundary Walls
Bird Sanctuary
Nocturnal Animal House
Land Sapping for Animal Houses, WBM& BT Roads to Entire parks
Technical Assistant in State Public Works Department.
SITE – Kodungaiyur Drainage Project
Drain side concrete walls
Site – Maduranthagam Lake
Revetment
Tank Bunds
PERSONAL DETAILS
Name
:
K. Anandhu
Father’s Name
:
(Late Mr.K. Kaliyamoorthy)
Sex
:
Male
Date of Birth
:
April 06, 1967
Marital Status
:
Married
Strengths
:
Sincerity, Commitment, Perfectionism
Driving License
:
F/TN/31U/002425/2003
Passport No
:
H3767226, Valid upto26/04/2019
I K. Anandhu, to declare that all the facts stated above are true to my belief
Signature
K. ANANDHU