Post Job Free
Sign in

Civil Power Plant

Location:
Ranchi, Jharkhand, India
Salary:
16000 SR
Posted:
July 29, 2020

Contact this candidate

Resume:

Senior Construction Manager - Civil

Personal Statistics

Contact No. +91-808*******/790-***-****

Email ID: ********@******.*** / **********@*****.***

Syed Afroz Alam

Ranchi, Jharkhand, India

Skype ID : kirmani1234

Career Objective : Intend to build a career with leading corporate of hi-tech environment with committed & dedicated people, which will help me to explore myself fully & realize my potential, willing to work as a key player in challenging & stress environment with deadlines

Career Synopsis : Over 22 Years’ Experience in Civil & Construction/ infrastructure engineering, Procurement, design construction transition to execution & management for Oil & Gas– Onshore, Pipeline, Refinery,Petrochemical and Power plant, Process & Non Process Industrial facilities, participated in EPC, EPIC, PMC, FEED, Field & SCADA System, Shutdown engineering, Operations & Maintenance Contributing in various activities for Administration, Planning, Supervision, Field Scheduling,Budgeting, Estimating, Documentation, Quality standard & control of the works

Key Skills & Accreditation : Site Engineering Project Management & Co-ordination, Strategic Planning & Supervision, Quality Control & Assurance, Client Relationship & Vendor Management, Project Engineering & Resource Management, Contract & Financial Management, Team & Self- Management, Communication & Risk Management, Stake Holder & Facilities Management, Shutdown Engineering,Operation & Maintenance System development & Implementation

Software Skills : Primavera P6, MS Project, AutoCad, MS word, Excel, Outlook, Tally, Access, Lotus, Spread Sheet, Power Point, Oracle & (MMS, CMMS, PAAMS, CCMS & PCMS) etc.

Professional Certification: PMP - Course Code: SIMPMPSOL2013 (35 Hours of PDU)

Key Competencies :

Representing to employers in technical, contractual, and administrative issue

Leadership through influence and effective conflict resolution

Project Co-ordination and execution strategies which can achieve Company and Customer Target

Execution Strategies to Improve Project/construction Planning, Productivity, Certification of works and Service Quality Interface with key internal and external stakeholders at work with diverse stakeholders at all levels in order to negotiate win to win situation

Perform to work in a motivated team and assigns and evaluates the work of staff for accuracy, suitability & Completeness

Implement control over spending and procurement strategies to ensure adherence to department budget

Generation strategies & implementation improve project & improve techniques overall administration of the construction records & documents

Profession Characteristics & Behavioural Aspects:

Confident, Self-driven& starter,focused, results, quality oriented, Punctual and Good at multitasking and Stress handling

Meet the deadlines for the tasks and appreciate the importance of targets

Closure orientation, Persuasive Influencing and Motivational abilities

Technical and Functional Training :

Analyse the training needs based on appraisal data collected from HRD

Update need based on site visit and interaction with functional needs

Organize training programs for technical, Mentor,Counselling, Coaching and development advice for Engineers

Assist and guide to bid team on all aspect of Construction and field subcontractor

Achievements /Special Contribution :

Maintain excellent relations with all employees enhancing their satisfaction through excellent relationship building skills

Provide highest quality of service with mutual respect and a spirit of co-operation while supporting the organization’s prosperity and growth

Successfully drive activities which provide avenues for cost reduction and operational efficiency

Area of Expertize :

Familiar with Designing, developing, Supervise, managing, maintaining & Safe Execution of construction work in oil & gas, Refinery, Petrochemical & Power plant of Civil and Structural, Electrical, Mechanical completions objective for Erection, Fabrication, Installation, inspection / Foundation / Transportation/Operations/Pre-Commissioning/ Commissioning & Completions

EPC particularly on construction Field project (e.g. Actual situation of resolving, Technical Queries, Resolving non-Conformities’ Change orders etc

Analyzing Tender & Project scope,budget & cost control,prepare Technical Drawing,package, assess risks, Materials and cost etc

Familiar with international codes, standards, Civil engineering principal, Theories, concepts and procedures to be applied during FEED, EPC phase and project

Exposure in Field and PMC for Engineering & design standard of onshore project coordination

Familiar with Job Hazard Analysis, JSA, isolation procedures, Confine space Entry, risk assessment and Permit to work system

Exposure in execution of Maintenance/Shutdown of oil&gas /Refinery Project as per contract, scope, design or parameters

Project Work Experience in Hand:

Reinforcement Concrete for Sub & Super Structure Work, Light & Heavy Equipment’s, Foundation – Pipe Rack execution, Columns, U.G Tanks & Pipes, Installation, Structural Erection, Fabrication, Steel Structure, Transmission, Distribution, Pump & Power Stations exclude all the Sub-Stations & Control Building, Rebar & RCC Slab etc.

Asphalt Work for Bund wall and Tank’s Pads for Crude oil Storage Tanks

Reinforcement Concrete Pavement for Non Crane & Crane road

Reiforcement Concrete for Cable Trench, Duct Bank, Box Culvert, Utilities works, Ditch Manhole, Storm Water & Drainage System

Piling Works :(Bore Pile cast in situ, Driven Pile cast in situ & Micro Pile - Diametre of 1.2 to 1.5”, Depth 30 to 40 Metres, in rock 12 to 15 Metres)

Pipeline Installation by Horizental Directional Drilling technique across sea bodies and Depth of 140 mtr below ground leve,

Drilling, Subsurface and work over operations, well completion Artificial Lift & Well Stimulation including hydraulic fracturing

Perform lifting schedule & heavy equipment installation of reactors by using 1200-1600 Tons crane

Dismantling of 720 Tons of Equipment’s, Structures and Piping and 440 Tons of Old Civil Foundations and Erection of 480 Tons of Equipment’s (single lift as 240 Ton max), 105 Tons of Structural, 380 Tons of New Civil Foundations

Piping of 29500 Dia, inches as Alloy Steel, SS, & CS (from 1/2” to 48”-in shutdown 8500 dia, inches and 132 tie-ins) with a different specification that includes the pre-commissioning activities

Project Execution of Cross Country Pipeline, Trunk Line, Flow line Pipeline): Grouting, Mixing, ROW Preparation, Civil Earth works, Excavations, Trenching, grading, levelling, Surfacing, Rock/Sand Blasting, Underground pipes laying, Concrete Structure, Underground Telecom works, Pipeline Corridors crossing, Trench-less crossing, Road Crossing, Top soil remove, Pipe Stringing, lowering of Pipelines, Soil/ Sand Bedding, Pre/Post Padding, Hydrotesting, Dressing, Backfilling, Compacting & clean up

Execution of Refinery construction & Power Project/Onshore Oil&gas Field development project including onshore gas Processing plant Facilities & Non Process Plant): within Oil & Gas construction (Up & Down Stream- along with revamping of Green & Brown Field installation, SCADA,Basic & Conceptual design, Feasibility & FEED Study < Overall Civil and Structural works such as pouring, protection, backfilling including site asphalting, concrete mix & placement, Concrete Rehabilitation & Curing methods include precast elements, Electrical, Mechanical & Instrument Support works all around plant area, Installation of equipments, Plant equipment foundations, Underground Utilities operation,Concrete & Steel structure works, Equipments erection & Fabrication, Conveyor Pipeline & Power cable installation, insulation – removal, repair & Completion, masonry structures, Plant Layout & modification, numerous Plant roads and building, fireproofing works 4000 Sqm, flooring, Pipe coating, sand Blasting, electrical networks installation, HV cable laying, Lifting, scaffolding erection,Painting of structures 90000 Sqm (concrete surface only) below and above the ground level, industrial cleaning etc.

Project Experience Statement in Areas of Specialized : (Current to Previous Organizational Scan)

Project SHPPL: (Shahdol- MP to Phulpur- India) Approx. 312 km, Dia”16") Trunk Line/Natural Gas Pipelines (T4S)” and “ASME B31.8 - Gas Transmission and Distribution Piping System” / Crude Tank Farm Facilities Works such as Pipeline laying construction, Pre-Construction, Commissioning, Field/Entire civil/Pipeline protection activities in ROU as well as Compressor, Metering, MLV, IP Station including site development, Area grading, Boundary wall Reconstruction, Building, Foundations, Valve Stations and Pipe support works, HDPE Duct Laying & OFC Blowing, drilling equipments for Grouting, Mixing, PLC & SCADA System,HDD & Telecom Facilities works across SHHPL Employer Name : Reliance Gas Transportation Infrastructure Ltd.@ HFCL Designation : Sr. Construction Manager Civil Period : 23,Nov 2015 to Still in Role Budget : $ 3.5 Billion Scope of Works : Responsible for developing co-ordination mechanism with various internal stakeholders like SCM, Finance, Project Planning, Scheduling, Execution of deployment of Infrastructure /Construction, Quality teams etc. & conduct regular meetings to avoid gaps and ensure timely completion of project

Project Saudi Arabian Oil Operation Field MSAE003-005 (Onshore ) : Construction of upstream Oil & Gas Gathering Network” & Gas Wells, processing facility & Down stream Pipeline / Installation of SCADA in (SAOO - Brown Field flow lines for sour gas through Two Phase lines (Liquid & Gas ) connecting wells to production manifolds range from 2 to 20”( Site development & Over all civil, structural, Mechanical equipments & Piping/Instrument Cable Installation,Compaction, Final Back filling etc.

Employer Name – Saudi Kentz SNC Lavalin Group Client : Saudi Aramco Designation : Sr. Construction Manager Period : 13,Sept 2013 to 16, August 2015 Location- Al-Hasha, (Saudi Arab) Scope of Works : Responsible for overall Site development design criteria and others scoping documents related to civil & structural design and mechanical completions work and indentify, resolves engineering issues which are critical for project schedule & cost Budget : $ 2.5 Billion Reason for Leaving : Personal Problems

Onshore Project MDPL- Mangla Development Crude Oil Pipeline-700 Km Long, Construction Field/ Trunk Line from 8” to 36” (36”, 24”, 18”, 12” and 8”):Barmer to Salaya coastal location of Bhogat (Distribution) Terminal Jamnagar Arabian sea cost in Gujrat, India Employer Name : China National Petroleum Corporation Ltd @ KEC Designation : Site Manager Client: GSPL India Gasnet Limited Period : 16,Nov 2012 to 31,Aug12013 Scope of Work: Responsible for overall Project construction, Execution Planning & Managing construction sites and direct site personnel, directing for project requirements & Supervision of construction, Erection, Foundation, Installation and commissioning activities Budget : $ 1.8 Billion Reason for leaving : Contract Finish

Project : Jindal Steel & Power Ltd. : 4X 600 MW units at Tamar Chhattisgarh- 400 KV double circuit Transmission Line to pump the power into the national Grid & Combine Cycle (Steam & Gas Turbine) Thermal Power Plant (Green Field and Brown Field) Coal based connected with oil gas industry both in Onshore and offshore Works such as Project connected with Onshore/ Offshore Power cable installation & Onshore Electrical substations- MV/LV including utilities, Ponds & Pump Station, Soil investigation, stabilisation,Step grading, setting out of cable route, Stub setting, Cable Trench & GRE Conveyor Pipeline installation, underground HV cable Laying, Swicth Yards,Topsides, OHL systems, Transformer foundation, Storm water & Drainage layout with ducting etc Employer Name: Marg Group Ltd. (India) Position Held: Site Manager Period : 23/05/2010 to 12/04/2012 Budget : $ 3.2 Billion Scope of Work: Responsible for construction works on site, Coordinating, Supervising and managing all resources for the construction works, such as personnel, equipment, materials & sub-contractors, schedules & contracts while maintaining client satisfaction & Internal standards of Safety & Quality.’ Reason for Leaving : Contract Finish

Project EWPL : East West Pipeline (Cross Country Pipeline) - Length 1375 km, 48"dia Gas Pipeline (Bharuch to Kakinada), India Employer Name : Punj Lloyd Ltd.@ KEC Position Held : Sr. Construction Engineer Period : 17 June 2009 to: 13 May 2010 Budget : $ 210 Billion Client : RIL Scope of Works : Supervise & Manage all site activities and delivers for specific project and ensure timely completions to the required quality standards

PMC Onshore Project : RL(3) Common Off Plot Project including Utilities, Tankage & Equipment’s for LNG & onshore works Brown Field- (Ras- Laffan Liquefied Natural Gas Company Ltd. (Qatar) Employer Name : Fluor Mideast Limited @ Qatar Kentz Position Held : Senior Civil Engineer Period : 22/01/2007 to 27/01/2009 (02 Years) Client: Ras-Laffan Liquefied Natural Gas Company (Qatar) Scope of Works : Responsible for ensuring Construction as per the agreed plans, guide the Sub-Contractor/ overall Management /PMC Construction planning teams to identify vulnerability & opportunities Reason for Leave ; Project Completed

Project : Green Field & Brown field of Construction Of ESSAR Oil Refinery, FCCU, 26 Control Building, Jamnagar, Gujrat (India) Employer Name : KEC-Samsung Engineering Co. Ltd Position Held: Construction Engineer Period : September 2005 to Nov 2006 PMC: Engineers India Ltd Scope Of Works : Responsible for Refinery civil construction and structural activities through the contractors supervision in respect of HSE, Method working practice, quality and timely execution of the work Reason for Leaving : Project Completed

Project : Refinery Facilities works, ESD Systems, Fire and Gas detection Systems and remote plant surveillance systems, ULG-Unleaded Gasoline/ LSGO – Low Sulphur Gas Oil Project - Location : Abu Dhabi Oil Refining Company, Ruwais (ADNOC -Takreer) Employer Name : AL Jaber Grinaker-LTA (Abu Dhabi) Position Held: Civil & Structural Engineer Period : 26 September 2004 to 2nd August 2005 (01 Years) Reson for Leaving : Project Completed Scope of works : Responsible for day to day construction activities of contractors on site, scheduling, Manpower and expediting receipt of equipments &materials for utilization at work

Project Mathura Refinery: Construction Of MSQ Unit Up-grading, ( Indian Oil Corporation India Limited, UP, India Employer Name : KEC Ltd. Position Held : Construction Engineer Civil From : Oct 2002 to Dec 2003 Reson for Leaving : Project Completed

Scope of work: Civil & Pipe rack Execution, Foundation, Erection, Structural Fabrication and steel structure etc.

PMC Project STAS: Total South Pars Field Development Phase 2 & 3 Onshore gas processing Plant Facilities project, (Iran) Employer Name : Naft Sazeh Qeshm PJSC Position Held: Construction Engineer Period: Nov 30, 2000 To June 18, 2002 (02 Years) Reason for Leaving : Project Completed Scope of works : Performing Constructability reviews and studies to optimize detail design propose modifications to engineering design review,Feed Engineering and interpret drawings, specifications and other technical documents for the sub- contractors

Onshore Project : AMEC Foster Wheeler expansion of onshore Project,Gas Oil Separation Plant (GOSP) Brown Field include Civil Maintenance works, Yanbu, Refinery Saudi Arab as Client Saudi Aramco Employer Name : MMG Position Held : Civil Engineer Period : April 1997 To: Nov 1999 (2 Years & 7 months) Reason for Leaving : Project Completed Scope of works : Supervise and follow up maintenance service jobs as asphalting utility roads, Fabrication jobs & installation of equipments, building works & Civil Structure works Inside Saudi ARAMCO including Scaffolding, Insulations, Modification, Blasting, Surface Preparation, Lifting, Painting, Coating, Industrial Cleaning & civil work all around the plant Area

Execution of Maintenance Shutdown of Oil & Gas/Refinery/LSTK/Turnaround Project

Ist Shutdown- Duration 2 Months Start from 15/09/2015 to 13/11/2015 as Civil Maintenance Manager, Barauni, Refinery India) CDU Pump House – 02, Steel structure shed, Remove & Replace Wire mesh, Roofing sheet, Bad Corroded bolts/Nuts, Strengthen the anchor Bolts for Columns, Concrete Floor Repair Plant shelter/ shed/Roads & sewerage, control & Battery room/ Analyse and switch house repair works.

2nd Shutdown (LSTK)- Duration 6 Months from 06/02/2004 to 15/August/ 2004 as Civil Maintenance Engineer (Jamnagar Refinery, India) TANK - 46 Shell Crude Oil Terminal, Civil, Electrical, Mechanical, E&I Transformer building works- Asphalt Bund wall, Tank Pad, Pipe Support Repair, columns, exchangers, vessels, pumps, tanks, heaters, Piping works, Replacement, Modification, Refractory Maintenance, Plant road & structural repair, Utilities opeartion, small works & other items etc.

3rd Maintenance Project- Duration : from 06/02/2000 to 15/09/ 2000 ( Construction of FCC & DHDT unit for Refinery expanision project (Indian Oil Corporation Ltd.( as a Civil Maintenance Engineer) Execution of Equipment Erection, Steel Structure/ Structural Fabrication, Pipe Rack & Support maintenance works all aroud plant area, etc.

Roles & Responsibilities for Maintenance Shutdown : Supervise, Monitor and inspection of civil execution, Turnaround strategies & Plan, Review and Controls overall civil maintenance support for technical parties within work of plant & direct activities concerned with the contruction and maintenance of structures, facilities and systems as per contract, scope,design or parametres

Key Accountabilities and Core Responsibilities :

Supervise all engineers in order to give a clear picture of their daily task and convey to Engineers as well as Project Manager all scheduled works, Budget and targets

Lead the project team to implement and execute works according to schedule

Reviews of drawings, design,flow digram, specification, construction procedures, Project Bids, Permit works, Punchlist, certificates and calculation notes, quality, safety plans & data sheets and suggest recomendation etc. as required, develop/ maintain up- to-date project file

Overall technical direction & coordination of all civil & structural engineering & design works on assigned project in accordance with project execution plan, applicable project & procedures

Manage and coordinate a team of multi-discipline engineers to achieve a cost effective design through timely resolution of technical problem and engineering issues

Attend executive/Progress/Quality/Safety/technical & weekly meeting with client ''ARAMCO'' and others client to update works status and further project planning & schedule include monitoring & controlling the cash flow of project.

Supervise & Manage over all Civil construction,Electrical and Mechanical completion activities include provide technical inputs for methodology of construction and coordination with the site management activities

Supervise, selection, specification & Inspection the site and of all civil components and develop the work methodology, overall responsibilities to ensure project team are set achievable goals and meeting high level of HSE requirements

Prepare, Execute & Monitor all Civil & Structuctural Site works as per compliance with the Drawing, specification and schedule including asses potential risks, materials and cost

Manage & maintain of Contractor/ Sub-contractor with daily activities include equipments & site materials control operation & solutions to Construction problems

Performing,checking, reviewing and ensuring technical accuracy & quality of engineering deliverd the project

Manage site construction & site team for completion of construction activities with project objectives and priorities

Supervise & Managing Sub- contractor & manpower resources/ maintenance tools, stores and equipment’s

Execution of area pipeline Maintenance Management plans and execution as per key plan/Route map/Alignment sheets and as per Erection

Preparation of Engineering documents such as design basis, Material specifications and Datasheet for pipeline components and technical reports.

Conversant with all the international design codes of practices such as API, ASME, ASTM, ANSI etc.

Attend Issue ITP, JSIs, SWIs, NCR as the case may be applicable & Prepare SER, CER, CDR, FOR, and inspection Reports

Focus and Technical Support to project management to evaluate any variation request

Manage and control construction/ mechanical completions/Operations/Maintenance, installation, Pre-commissioning & Commissioning works on site personally and through subordinates to ensure that work is carried out in accordance with agreed specifications, contract procedures and final handover to client

Maintaining the highest quality standards while administering good construction safety practices with all on site activities

Maintain all necessary documents for successful project delivery and Payment

Monitoring about 100 to 300 Skilled and unskilled worker & site management of 20 staffs both blue & white collar

Handling infrastructure and construction project worth $ 100 to, $ 300 Billion each

Conduction internal meeting daily/weekly with civil and QC staff to discuss daily issues and resolve it

Plan & execute the erection of process pipe work of new & existing plants, erection of equipment (vessels, columns, exchanges, Integrate Transmission, Substations & pumps etc. as per GA Drawings

Develoep, lead & manage onshore gas processing plant facilities FEED objectives in support of the project including FDP and technical input to project information mamorandum

Supervise all onshore operation construction of civil & Mechanical completions works in connection with verify & sign EPIC Engineering contractors daily time sheets and completions certificates

Coordination and Management of Project Documentation Engineering Procurement Site Construction Activities- Planning of Site Activities and Construction Schedules- Site Coordination with all Contractors RFI related to civil works

Civil engineering execution in detailed design, production of calculations for light & heavy equipment foundations, buildings and steel structures

Coordination and obtaining Approval from Customer for all Site Construction Activities and Project Documentation the drawings and execute the works, Mechanical completions, Substation, onshore construction contractor and Building etc

Monitor generation of field materials requisitions (FMR), receipt of materials, and preparation of material summary reports.

Manage the change control procedure and ensure that project deliverables are completed within the planned cost, timescale and resource budgets.

Ensure compliance with all company statutory procedures and quality and safety standards including any defined recording and reporting procedures

Civil Project Site execution/Construction Management :

Participating in project review meetings for evaluating project progress providing technical inputs to construction methodology, Strategic, Planning & budgeting, Risk assessments, Project cost analysis & Cost control measures

Supervise and assist to execute all civil works like foundations, Columns, Pedestals of pipe rack, foundation for equipment, Transmission, & Substations, pumps paving, trenches, roads, culvert, ditch, duct bank, and E & I Building transformer, structural steel installation & alignment of pipe rack and equipment structure by myself.

As Construction Manager on site, handling the over all civil works, building Tank elements, Mechanical completion objectives, Civil & Structural engineering in coordination with the Construction Head/Project Management & reporting

Lead & manage a team of engineers, inspectors, provide discipline as direction, guidance & advice

Participating weekly PMC meeting and updating the status and direct reporting daily to the Project Manager,

Preparing Alignment sheets/Data for site survey and Civil Foundation, Route Maps, Data Sheets, Calculations Road Crossing Analysis Report and Assist in development of plot details survey checks & plot area

Prepare cost estimates, budgets and of the CDR and Inspection Report for the Erection, alignment of the Steel Structure & Equipment’s and submits the same to and get is checked by our Consultant

Manage sub-contractors awarded work and their issues

Project Management Consultants :

To look the all over Refinery Site observations and integrated Transmissioninspection of all type of civil works including mechanical completions & support works and Excavation, Working under Project Management Consultants as QA/QC Department.

Review civil and structural design calculations for the buildings, columns, Foundations, rotary machines such as compressors, turbines etc

Monitor vendor communication, vendor drawing & data review and material requistion

In PMC, Prepare and submit the monthly Self-Appraisal Report to reporting Manager in Daily/weekly & monthly

Quality Control and Quality Assurance Department under PMC-I gives the final authorization for all the inspection works

carried by the above said Contractors and Sub-contractors.

Manage design changes due to revision of input data, P& ID and revision requirements from other disciplines and proposes solutions where necessary.

Communication with EPC contractor to ensure that selections are made as per the prevailing standards and codes

Follow up quotations, price comparison and finalizing quotations

Manage and the interface with the client for all relevant matters to construction activities

Maintain up to date Engineering documents, Project wise to address spot Audit checks

Strategy and Execution Planning :

oPreparing a daily, weekly and monthly plan with the help of schedule engineer to control the Sub-contractors and their site activities

oPreparing 3 month ahead schedule based on the Project Master Schedule, submit it to the Contractor as well as departmental staffs to monitor the progress and guide accordingly

oPrepare for construction plan for projects and modifications

oSummarizing daily report from subcontractor for updating including man hours, construction equipment status, work volume, Trending, claims, special event showing achieved and forecasting data

oHandling to Sub-Contractor Task/Implementation and Execution of construction works as per plan and designed

QA/QC Management :

oDevise, Establish and Monitor quality assurance system for project sites

oAttend inspection reports and provide comments in line with standards, specifications and approved quality plant

oCheck the document of test report for concrete test Back-fill test before casting test, rebar test

oInspection test plan, quality assurance plan and ensure its implementation Rate contracts, job work contracts & raw materials planning

oInspection cube testing, batching plant and all types of civil works & Civil construction works for onshore Pipeline

Contract Management :

oControl and stewardship of construction projects ensuring that all the governance, legal and regulatory requirements are complied with.

oHandling and prepare the Sub-contractor Task and Negotiation & Contract finalization

oManage the execution of all civil related works of the project, (Budget), contract documents, specification and all applicable standards

oCheck and control of design revisions

Coordinating :

oOverall co-ordination, Liaising and relationship management with the employer for project related issues with company’s team, leaders, Client, Consultant and Contractors/ Sub-Contractors to ensure timely completion of Projects

oCoordinating all overlapping & interface activities at plant boundary

oReview and Monitor/Coordination and Management of Project Documentation, Engineering, Procurement Site Construction Activities- Planning of Site Activities and Construction Schedules- Site Coordination with all Contractors

Site Management :

oSupervise construction sites and direct site personnel and sub-contractors to make sure standard of performance, Quality Budget, Costs, Schedules and supervisions of safety

oOversee the quality control inspections/a team of Supervisors/Engineers for various types of job & resolving bottlenecks

oProviding technical advice and solving problems on site & coordinate personnel’s from different disciplines

Professional Specialization & HSE Management :

oAs a focal point and KPI to implement in all areas of responsibilities, ensure all work carried out are in compliance with HSE Standards & guidelines, regulations, Codes and Standards and a responsible to environmental

oMonitor outcomes against the predicted & prepare to exploit the new operational business environment

oReporting all accidents/incident and unsafe Acts/conditions in a timely manner

oSupporting, coordination and participating in safety, quality and technical reviews to assure overall facilities, integrity and safe operations in line with the project quality plan, QHSE management system

oEnsuring the safety of all activities of professional activities in the project and follow the instruction to the superior accordingly to company rules and procedures and environtal performamce of all drilling related opeartions

Administration & Management :

oOverall supervision and administrative oversight of personnel including skilled, Unskilled Staff, Engineers, Designers and technical specialists

oCo-ordinating with superior for support in projects

oExecuting contracting works, coordinating among consultants, contractors and clients

oProvides advices & recommend solutions for drilling problemsof serious nature



Contact this candidate