ARNOLD LIRA LINCE
Dubai Investment Park DIP * Lagoon Ewan Residence U.A.E.
E-mail add: *************@*****.***
Mobile No. +971*********
Job Objectives:
To achieve professional growth by immersing into a hands-on, practical, and varied application of Technology inherent to my profession.
To imbibe a realistic perspective of the peculiarities, prospective contributions and potentials of my chosen profession to the work organization I belong and to the community as a whole.
Educational Background:
Tertiary:
BSIT Batchelor Science Industrial Technology SY - 1997- 1998
Surigao Del Norte School of Arts and Trade
Surigao City
Vocational Education
Practical electricity SY - 1994
Torres evening vocational school
Gagalangin, Tondo Manila
Secondary Education:
Pres. Sergio Osmena High School SY – 1993 -1994
Gagalangin Tondo Manila
Metro Manila
Elementary Education:
Nonoc Elementary School SY – 1988 -1989
Nonoc Island, Surigao Del Norte
Person to be contacted in case of emergency
Angelyn Pejer Lince
Block 4 lot 9b San Marino Classic Brgy., Salawag Dasmarinas, Cavite, Philippines
Contact no. +63-956******* / +63-977*******
POSITION : ELECTRICAL FOREMAN OR SUPERVISOR
PERSONAL DATA:
Age : 45 years old
Date of Birth : November 22, 1975
Date of Place : Surigao city
Sex : Male
Height : 5’6
Weight : 150 lbs.
Civil Status : Married
Spouse Name. : Angelyn P. Lince
Daughter. : Yshai P. Lince & Gellian mich P. Lince
Religion : Roman Catholic
Nationality : Filipino
Passport No : P1693989A Due Date 20 Jan. 2022
SSS No. : 33-3790651-5
TIN No. : 233-***-***-***
Character References:
Bobby Byrne ***********@*****.** HSE LOTO Commissioning manager
Tel. +971********* TAV Midfield Terminal Contractor
Abu Dhabi New international Airport
Ricky R. Steed ******@********.** HSE LOTO Commissioning manager
Yanbu 2 Power & Water Project
Yanbu Saudi Arabia
Antonina J. Alonso Phone no. Admin Supervisor
+632-***-**-** to 56 EEI CORPORATION
I hereby certify that the above information is true and correct according to my ability and to the best of my knowledge.
ARNOLD L. LINCE
Applicant Signature
WORK EXPERIENCE :
Company: BERKSAN MUHENDISLIK INSAAT VE SANAYI AS
Position : TESTING COMMISSIONING ELECTRICAL SUPERVISOR
Inclusive Date: OCTOBER 17 2019, up to PRESENT
Main Contractor: EXPOLINK
Project: EXPO2020 RAIL WAY PROJECT
EXPO2020 DUBAI UAE.
Duties and Responsibility
* Review design and supervised onsite commissioning activities.
* Prepare and maintain commission record of site observation testing processes and checklist.
* Outline procedure, norms. and details for writing the systems manual.
* Monitor installation submittals and usage of engineering tools adhesing to project and commissioning guidelines.
* Guide testing processes and motivate specialists to achieve standard result,
* Assist with identification and red ressal of commissioning and malfunction issues.
* Track and review progress through meetings.
* Evaluate contractual commissioning statistics and instruction guidelines in accordance with the need of the project.
* Energization and testing of power and control circuit LV SWGR. SMDB, DB, ECS MCC, AHU, FAHU, RAHU, SEF, FCU, CRAC, CSF, EF and operate & program the VFD & SOFT STARTER in required the motor rating.
* Energization and testing of electrical equipment and check the trip test in required the rating of ELCB & RCB and check the loop impedance test.
* Energization and testing of power and loop testing of instrument
* Compile commission records.
* Schedule and supervise operational reviews in association with functional
Staff.
* Create an empowering and inspiring work culture with commission team.
*Attain customer statisfaction through adhering to owner guidelines with the entire project team
WORK EXPERIENCE :
Company: TAV tepe Akfen Investment Construction & Operation
Position : Sr. HSE LOTO OFFICER / ELECTRICAL TECHNICIAN
Inclusive Date: APRIL 03, 2016 to September 10 2019
Main Contractor: TAV tepee Akfen Investment Construction & Operation
Project: MIDFIELD TERMINAL BUILDING
ABU DHABI INTERNATIONAL AIRPORT
Duties and Responsibilities:
vEnsures safe work and proper work procedure before commencing Energized, de-energization and test on Electrical and Mechanical system by reviewing and approving Permit to works and evaluate Task Safety Assessment form.
vInspects all major Electrical and Mechanical equipment, ensures standard and proper installation of said equipment and materials, approves Lock out tag out on a system.
vCheck and monitor’s all isolation permit, archiving list of authorized permit requestor.
vObserved monitor’s Energization Low Voltage and Medium Voltage Switchgear, SMDB Panel, FDB Panel and Final Circuit
WORK EXPERIENCE:
Company: Hanwha Engineering & Construction
Position: HSE LOTO OFFICER / ELECTRICAL TECHNICIAN
Inclusive Date: December 21, 2014 – April 02, 2016
Main Contractor: Hanwha Engineering & Construction
Project: Yanbu 2 Power & Water Project
Yanbu Saudi Arabia
Duties and Responsibilities:
vEnsures safe work and proper work procedure before commencing Energization, de-energization and tests on Electrical and Mechanical system by reviewing and approving Permit to works and evaluates Task Safety Assessment forms.
vInspects all major Electrical and mechanical equipment, ensures standard and proper installation of said equipment and materials, approves Lock out Tag out on a system.
vReviews and coordinate Lock Out tag Out safety Tagging request through LOTO Permit System, with correct P & ID's, E & ID's, Schematic, Single Line and load schedule Diagrams.
vPrepares weekly and monthly evaluation and audit reports of Permit requestor and Responsible Persons.
vEnsures safe work and proper work procedure before commencing Energized, de-energization and test on Electrical and Mechanical system by reviewing and approving Permit to works and evaluate Task Safety Assessment form.
vInspects all major Electrical and Mechanical equipment, ensures standard and proper installation of said equipment and materials, approves Lock out tag out on a system.
vCheck and monitor’s all isolation permit, archiving list of authorized permit requestor.
vObserved monitor’s Energization Low Voltage and Medium Voltage Switchgear, SMDB Panel, FDB Panel and Final Circuit.
WORK EXPERIENCE:
Company: Young Jin Electrical and instrumentation
Position: Electrical Supervisor
Inclusive Date: April 01, 2013 – October 31, 2014
Main Contractor: Hyundai Engineering and Construction
Project: Ma Aden Alumina and Refinery Project
Duties and Responsibilities:
vRead and interpret electrical plan, circuit diagrams and industrial plan drawing
vFamiliar with and understand the Electrical codes and provisions for industrial and Building, wiring and equipment installation.
vPre start talk before start of work for safety procedure
vPrepare arrange the permit the commissioning area and client side area
vPrepare, arrange, all drawing need, the manpower in site area
vSpread the manpower in site area, area by area and give the task of work as per drawing schedule
vInstallation of cable tray. Ladder type, perforated tray, race way
v Measuring lay out for the foundation support of cable tray
vMeasuring hole for the gland plate of MCC panel cubicle, VSD panel, Distribution Board panel, UPS panel, AC/DC, pin cabinet, PA panel, CP panel, DCS panel
vDressing cable, boring, glanding of MCC panel, VSD panel, DB panel, UPS panel, AC, DC, pin panel, PA panel, CP panel, DCS panel
vTermination of power cable, control cable, LSC, MCC panel, VSD panel, DCS panel, Pin cabinet, Public Address panel, CP panel
vInstallation, arrange the battery in battery rack, wiring termination
vInstallation of isolator panel board for battery bank & UPS AC, DC, measuring lay-out for lighting, socket outlet, fire alarm
vTermination of transformer oil type primary and secondary side 630mm2 & 120mm 3core cable XLPE, 132kv, 110kv, 65kv, 34.5kv 25kv.
vTermination of dry type transformer for the small power distribution panel
vTermination of MCC panel primary to secondary to distribution of cubicle
vProper use and operation of testing equipment such us multi tester and megger tester insulation resistance test
vTracing circuit and auditing us belt of electrical system.
vPre-commissioning and commissioning stage, and Lock-out Tag-out
WORK EXPERIENCE:
Company: Sky Oryx joint venture/ Anel Electrical \Design and
Construction
Position: Electrical foreman and Data Encoder / LOTO OFFICER
Inclusive Date : August 01, 2010 – November 19, 2012
Commissioning team (lock-out tag-out)
New Doha International Airport (DOHA QATAR)
Duties and Responsibilities:
vSecures, organize and archiving documents including SRF, IRF’s, Progress
Reports, Transmittals.
vEnsures system installation and construction completeness.
vEnsures safe work and proper work procedure before commencing
vEnergization, de-energization and tests on Electrical and Mechanical system.
vInspects all major Electrical and mechanical equipment, ensures standard and proper
vinstallation of said Equipment and material, approves Lock out Tag out on a system.
vMonitor actual Installation during progress work and secure that Quality and safety is properly implemented.
vReviews and approves Lock Out tag Out safety Tagging request through site inspection and Schematic, Single Line and load schedule Diagrams.
vConducts safety meetings, toolbox, Lock Out Tag Out training, permit requestor
Orientation and Substation Energization Training Procedures.
vConducts toolbox meetings for quality and safety of work, progression and evaluation of workers.
vWork under tagging authority instructions and qualified to operate equipment.
vPrepared the required tags and locks for permits
vPosition and configures components listed on the permits.
vInstall appropriate tags and locks on the equipment
vRemoves locks and tags as required when directed by tagging authority completion work.
vFamiliar with lock-out tag-out procedures prior to energize of electrical panel.
vAssist start-up of (LVSS) low voltage substation, (ATS) automatic transfer switch (MDP) main distribution panel, (PP) power panel, and (MB) miniature breaker.
vResponsible on lock out tag out prior to testing, installation, commissioning and handover to owner.
vAssist energized and start-up of EF, SEF, TU, CRAC, FCU, AHU, HRU, CC and all related electro mechanical and Electrical equipment
vStrict implement of no permits no work.
WORK EXPERIENCE:
Company: Romago, Inc.
Position: Electrical Foreman
Inclusive Date : Feb 4, 2010 up to July 30, 2010
Eton Project Makati city
Building Construction / Condo Unit
Duties and Responsibilities:
vRead and interpret electrical plan, circuit diagrams
vFamiliar with and understand the electrical codes and building wiring
vRoughing-ins for high rise building residential and condo unit
vInstallation of bus way 220 to 440
vInstallation of grounding lightning protection system,
vRoughing-ins and wiring telephone, intercom, smoke detector, CCVT and CATV
vPerform loop checking cable,motor, transformer, mcc and switchgear panel
vInstallation of cable ray ladder type Enclosure type and perforated type
vWiring to finishing of lighting and Power System
vPerform conduit threading and bending using manual, hydraulic bender
vProper use and operation of testing equipment such us multi tester and megger tester insulation resistance test
vTracing circuit and auditing us belt of electrical system.
vPre-commissioning and commissioning stage
WORK EXPERIENCE:
Company: EEI CORPORATION
Position: Industrial Electrician
Inclusive Date: Nov. 29, 2007 – July. 18, 2009
New Nouvelle Caledonia in France
Nickel Refinery Plant Project
Duties and Responsibilities:
vRead and interpret electrical plan, circuit diagrams and industrial plan drawing.
vFamiliar with and understand the Electrical codes and provisions for industrial and Building, wiring and equipment installation.
vInstallation of cable tray, fittings including supports.
vPerform conduit threading & bending using manual & hydraulic bender.
vInstallation of Switchgear / MCC Panel, transformers, Panel boards, Bus duct, lighting and power devices.
vPerform above and underground cable pulling of power cables on conduit, cable rack and cable trench.
v Installation of Control Panel and circuit wiring connection based on diagram, cable glanding, cable splicing and termination of power and control cables,
vWiring and termination of lighting system.
vInstallation of grounding and lighting protection system, and auxiliary system such as CCTV and fire alarm system.
vPerform testing of cables, motors, transformers, MCC & Switchgear panels.
vFabrication of lighting fixture support, conduit and cable tray support, and panel bracket.
vFabrication of cable tray, Fittings elbow vertical and horizontal.
vProper use and operation of testing equipment such as Multi-meter, Insulation Resistance tester.
vFamiliar with general safety practices and lock-out procedures
vPre-commissioning & commissioning stage.
WORK EXPERIENCE:
Company: Unitec Resource Inc.
Position: Electrical Foreman
Inclusive Date : August 18, 2004 – Sep. 08, 2007
Pepmaco Canlubang Laguna
Champion Detergent Bar
Industrial project
Duties and Responsibilities:
vRead and interpret electrical plan, circuit diagrams and industrial plan drawing
vFamiliar with and understand the Electrical codes and provisions for industrial Building, wiring and equipment installation.
vRoughing –ins for Building, Residential and Industrial Electrical System
vWiring to finishing of lighting and Power System
vRoughing-ins and wiring for CCTV and Telephone System
vRoughing-ins and wiring installation of Fire Alarm System and Smoke Detector
vInstallation and Termination of Panel board, ATS, MTS and Control Panel
vTermination of Transformer Step Down and Step Up
vInstallation of Cable rack, wire way and fitting of cable rack
vTermination of motor control MCC and automation
vInstallation of current transformer for legal purpose of monitoring of ammeter
vRoughing –ins wiring motor control lighting arrester with used of cad weld
vTrouble shooting motor controls lighting power system fire alarm bell and smoke
Detector.
vTracing circuit and auditing us belt of electrical system
vFamiliar with general safety practices and lock-out procedures.
vProper use and operation of testing equipment such as Multi-meter, Insulation Resistance tester.
vPre-commissioning & commissioning stage
WORK EXPERIENCE:
Company: Phasor Construction Corp,
Position: Leadman Electrician
Inclusive Date : January 02, 2003- August 03, 2004
Building Construction
Duties and Responsibilities:
vRead and interpret electrical plan, circuit diagrams and industrial plan drawing.
vFamiliar with and understand the Electrical codes and provisions for industrial Building wiring and equipment installation.
vFabrication of lighting fixture support, conduit and cable tray support, and panel bracket.
vInstallation of conduits, cable tray and fittings including supports.
vPerform conduit threading & bending using manual & hydraulic bender, and fabrication of cable tray
vPerform installation of Switchgear / MCC Panel, transformers, Panel boards, Bus duct, lighting and power device.
vPerform above and underground cable pulling of power cables on conduit, cable tray and the cable trench
vInstallation and Termination of Panel board, ATS, MTS, ECB and Control Panel
vWiring to finishing of lighting and Power System
vRoughing-ins and wiring termination of auxiliary system telephone CCTV
CATV and fire alarm system
vTracing circuit and auditing us belt of auxiliary and electrical system.
vFamiliar with general safety practices and lock-out Tag-out procedures.
vPre-commissioning & commissioning stage
WORK EXPERIENCE:
Company: DNA Construction Corp.
Position: Leadman Electrician
Inclusive Date : January 04, 2002 - January 06, 2003
Philip Morris
Industrial Project
Duties and Responsibilities:
vRoughing –in for Building, Residential and Industrial Electrical System
vInstallation and Termination of Panel board, ATS, MTS, ECB and Control Panel
vWiring to finishing of lighting and Power System
vRoughing-ins and wiring termination of auxiliary system telephone CCTV, CATV fire alarm system
vWiring for termination of motor
vInstallation of Supply for VFD to the AHU power
vInstallation of dust smoke detector and termination of BMS panel
vTracing circuit and auditing us belt of auxiliary and electrical system.
vFamiliar with general safety practices and lock-out procedures.
vPre-commissioning & commissioning stage
WORK EXPERIENCE:
Company: JDO Aguilar Corp.
Position: Leadman Electrician / BMS Technician
Inclusive Date : January 02, 2000 – January 02, 2002
Call Center
Duties and Responsibilities:
vRoughing –in for Building, Residential and BMS Electrical System
vWiring of finishing of smoke detector and dust smoke detector
vRoughing-ins and wiring for CCTV fire alarm system
vInstallation of current transformer for monitoring of ammeter
vTrouble shooting of smoke detector and dust smoke detector
vInstallation of Supply for VFD to the AHU power
vInstallation of dust smoke detector and detector and termination of BMS panel
vTracing circuit and auditing us belt of electrical system auxiliary system
vFamiliar with general safety practices and lock-out Tag-out procedures.
vPre-commissioning & commissioning stage
WORK EXPERIENCE:
Company: ACRO Infrastructures Incorporation
Position: Electrician
Inclusive Date : February 1999- Nov. 1999
Building Construction
Duties and Responsibilities:
vRead and interpret electrical plan drawing and circuit diagram
vFamiliar with understand the electrical codes and provisions for building wiring
vRoughing –in for Building, Residential and BMS Electrical System
vWiring of finishing of smoke detector and dust smoke detector
vRoughing-ins and wiring for CCTV fire alarm system
vInstallation of current transformer for monitoring of ammeter
vTrouble shooting of smoke detector and dust smoke detector
vInstallation of Supply for VFD to the AHU power
vInstallation of dust smoke detector and detector and termination of BMS panel
vTracing circuit and auditing us belt of electrical system auxiliary system
WORK EXPERIENCE:
Company: BETA Electric Corp.
Position: Electrician
Inclusive Date: January 1998-1999
Hospital Project
Duties and Responsibilities:
vRead and interpret electrical plan drawing and circuit diagram
vFamiliar with understand the electrical codes and provisions for building wiring
vRoughing-ins for high rise building residential condo unit
vWiring to finishing of lighting and Power System
vInstallation of cable rack Ladder type, Enclosure type
vInstallation of bus way 220 to 440
vInstallation and termination of lighting panel board
vPerform conduit threading and bending using manual, hydraulic bender
Tracing circuit and auditing us belt of electrical system.
OTHER SKILLED
Plumber
Duties and Responsibilities:
vInterprets blueprints and building specification to map layout for pipes, drainage system, and other materials
vInstalls pipe and fixture, such as sinks and toilet for water air and other liquid.
vInstalls supports for pipe, equipment and fixture prior to installation
vAssembles fittings and valve for installation
vModifies length of pipe, fixture, and other plumbing materials as needed for a building.
vUses saws and pipe cutters as necessary
vTest plumbing system for leaks and other problem
vAnalyses problem and identifies appropriate tools and materials for repair.
vChooses plumbing materials based on budget, location, and intended used of building.
vCollaborates with contractors, constructions workers, electrician, pipefitters and repairing plumbing.
vPerforms inspection of plumbing system to identify and replace worn parts.
vFollow health and safety standards and complies with building code
Acu and HVAC
Duties and Responsibilities:
vInstalling, maintaining and repairing ventilation and air condition system and equipment.
vIdentifying maintenance risk on equipment.
vDiagnosing electrical and mechanical faults for ACU and HVAC system.
vCleaning, adjusting and repairing system
vKeeping daily logs and records of all maintenance functions
vComplying with service standards, work instruction and customer requirements.
vOperate and setting the VFD and SOFT STARTER required the motor
TRAINING CERTIFICATE
HYOSUNG
450, Gongdeok-Dong, Mapo-Gu, Seoul
Korea 121-720
Tel. 82-2-707-700 FAX: 82-2-707-7799
www.hyosung.com
Date : December 24, 2014
To : Hanwha Engineering & Construction
Ref. No. 560-E2014-001
Subject: Certificate for training of Swicthgear Operator
BUREAULINK
SAFETY MANAGEMENT CONSULTANCy
Basic First Aid Awareness
Cert. No. BLSMC/BFAT 0719-185
Cert. No. BLSMC/BFAT 0719-185
Issued Date: 08/07/2019
Valid till: 07/07/2020
Special Skills
·Can read mechanical and electrical drawings.
·Calculate electrical wiring requirements and termination.
·Technically competent & with good communication skills.
·Flexible at work to adapt to changing priorities on a fast-paced environment.
·Welding and fabrication works
·Computer proficient (MS Word, MS Excel, MS PowerPoint & Visual Basic.)