Post Job Free
Sign in

Industrial Engineer

Location:
Arlington, TX
Salary:
$50,000-$55,000 per year
Posted:
July 27, 2020

Contact this candidate

Resume:

VIREN PATEL

*****.*****@****.***.*** 682-***-**** www.linkedin.com/in/virenpatel94 Arlington, TX Passionate, determined and goal driven Industrial Engineer with an interest towards Logistics, Supply Chain Management, Quality Control, Manufacturing, Operations, Production and Inventory Control, looking forward to highlight my skills and abilities towards effectively achieving desired results for the organization. EDUCATION

Master of Science in Industrial Engineering, University of Texas at Arlington, TX, USA May 2020 Bachelor of Engineering in Mechanical Engineering, University of Mumbai, Mumbai, India May 2016 SKILLS

Quality and Improvement Tools: DMAIC, PDCA, FMEA, Root Cause Analysis, Statistical Process Control (SPC), Kaizen, Total Quality Management (TQM), Ishikawa Diagram, Value Stream Mapping (VSM), 5s, 8D, Kanban, Correction & Preventive Action (CAPA)

Software: Solidworks, AutoCAD, Tableau, SAS, Microsoft Office (Word, Excel, PowerPoint), Windward 5.0 (ERP System)

Technical: QS 9000/ISO 9000, ISO 14000, ISO/TS 16949, Production Part Approval Process (PPAP), Advanced Product Quality Process (APQP), Operations, Data Analysis, Inventory Management, Forecasting, MRP, Warehouse Management System, Project Management, Simulation, Manufacturing

Interpersonal: Positive Attitude, Punctuality, Leadership, Team Management, Decision Making, Problem Solving, Teamwork, Adaptability, Multitasking, Communication Skills

WORK EXPERIENCE

Process Improvement Intern, Ravi’s Import Warehouse, Dallas, TX, USA Feb 2020 - April 2020

Developing and maintaining standard operating procedures, metrics and quality improvement activities

Assisted in resolving inventory control problems by implementing 5s and poka-yoke

Implemented ABC analysis to categorize items for better inventory control and identified problems using root cause analysis

Monitored and reported on KPI’s like inventory accuracy, inventory turnover, space utilization and receiving efficiency

Lead and participate in problem solving and continuous improvement projects regarding material flow in the warehouse

Forecasted future trends using company’s Windward 5.0 ERP software Supply Chain Intern, Kanal Enterprises, Mumbai, India Dec 2016 - June 2017

Assisted planning, preparing and coordinating material movement of auto parts between warehouse and distribution areas

Monitored inventory levels for smooth operation and reported Supervisor with the daily leads

Introduced color labeling to improve stock rotation

Prepared, maintained and reviewed purchase order reports and price lists PROJECTS

Rejection of Automobile Part Clutch in an Automobile Manufacturing Industry Nov 2019

Analysed using DMAIC methodology for improving and optimizing existing process problems

Implemented quality improvement tools like SIPOC Model, Fishbone Diagram, Pareto Principle and 5s methodology to identify the defects and eliminate them

Rejections of clutches decreased from 6.8% to 1.81% leading to an improvement of 70% Simulation report for Photovoltaic Panel Production Facility April 2019

Prepared a simulation model on WITNESS Simulation using the 40-20-40 simulation methodology

Validated, analysed, modified the model to achieve maximum production of PV panels within the facility, and prepared the 12-step simulation report

Multiple Linear Regression Analysis on Efficiency of various Automobiles Nov 2018

Developed a multiple linear regression model to study and analyse how predictors that influence average miles per gallon of an automobile affect efficiency of automobiles

Analysis was done using SAS (Statistical Analysis System) to find out the relationship between the response variable and the predictor variables

Studied Scatterplot Matrix, Correlation Matrix, Anova Table and using model search defined the best model Design & Fabrication of Fiber Extracting Machine from Banana Tree April 2016

Designed model using SOLIDWORKS and analysed using ANSYS. Built a frame using mild steel and rollers were attached using a gear system for removing water and extracting banana fibers. Electrical motor operating at 1200rpm aided for operating the rollers

Conclusion was to keep the gap between rollers as minimum as possible CERTIFICATIONS & ACCOMPLISHMENTS

Tableau Essential Training Certification from LinkedIn Learning.

Soon to be a Six Sigma Green Belt and Certified Quality Process Analyst (ASQ).

Member of Institute of Industrial & Systems Engineers (IISE) and American Society for Quality (ASQ).

Certificate of participation in “Virtual BAJA SAEINDIA 2015” & “BAJA STUDENT INDIA 2016”, organized by SAEINDIA.



Contact this candidate