Resume

Sign in

Power Plant Engineering

Location:
Abu Dhabi, United Arab Emirates
Salary:
7000aed to 12000aed
Posted:
July 27, 2020

Contact this candidate

Resume:

Unrestricted *

Endralin Morales Tuquero

Al Madhr St. Al Wahda Area, Abu Dhabi, United Arab Emirates Cell # +971********* (UAE) adevjz@r.postjobfree.com / adevjz@r.postjobfree.com

Senior Document Controller for in which responsible for managing company documents while ensuring their accuracy, quality and integrity and adhering to the company’s document lifecycle procedures, and archive inactive records in accordance with the records retention schedule with knowledge on document management and storage system such as SharePoint, eFilestore, Secuhard and PS system and CMMS. Also have knowledge on managing Spare Parts pre-inspection, handoverring and coordination for missing and discrepancies of Spare Parts in construction and manufacturing company for planning and executing the procurement and acceptance of the end users. A CMMS

(Computerized Maintenance Management System) Team Leader in which gathered all data needed for CMMS System requirements to have correct and efficient maintenance management.

SIEMENS POWER AND GAS DIVISION

(Main Contractor)

Dubai Electricity & Water Authority

CCPP – M-Extension Project

Dubai, UAE

700 MW

Document Controller (QA/QC)

(15 October 2017 to 31 March 2020)

Reports to the Project QA/QC Manager

Ensure that all controlled Quality documents related to the Project are maintained to the latest issue, and that these documents are made available at all locations where operations essential to the effective functioning of the Quality Management System are performed.

Verify that only the last revision drawings, submittals, etc. are distributed to all locations and involved parties concerned including sub contractors.

Maintain project drawing/documents distribution record.

Control & maintain the system for issuance recording / filing, tracking, Retrieval of documents like procedures, plans, QA/QC records, Specifications, drawings and related documents.

Responsibilities include record keeping, all documents such as specification procedures, inspection schedule and records, inspection release notice and quality records book with numbering system according to project filing procedure. Handling of all engineering documents. Controlling all records and sub-contractors documents.

Submitting technical documents for review and approval.

Well aware of all types of quality documents like ITP, Checklist, RFI, method statements, Nonconformance report, Technical queries, Inspection assignment package, Disposition Report, Material Request, Technical Approval Request, Hydro test packages and other miscellaneous project contract documents.

Preparing and update of various logs and registers. Unrestricted 2

HYUNDAI ENGINEERING AND CONSTRUCTION CO., LTD.

(Main Contractor)

Mirfa International Power & Water Company (MIPCO)

MIRFA – IWPP Project Site

Abu Dhabi, UAE

1,600 MW

Senior Document Controller

(Sep 2014 to Sept 2017)

Receiving and sending transmittals (technical documents and drawings) and correspondences (letters and email) to Client, Consultant, Vendors and Subcontractors for their information, review and approval via electronic submission and provide hard copy for filing.

Maintains registers and files for all documents and transmittals such as Letter & Email correspondences, MoMs and QAQC, Engineering, Vendor documents/drawings and its records.

Ensures that completed records for received and submitted documents/drawings and must be contain all the required documents and records prior to filing.

Control and distribution of all documents/drawings as instructed and ensure superseded versions of documents are segregated from updated versions in all disciplines.

Checks documents for submittal if compliance with latest approved templates according to Company’s document numbering / referencing system and advise originators of discrepancies or error in a timely manner.

Where necessary, liaises and coordinates with the Client’s Engineer Document Controller regarding submission of documents, errors and corrections.

Ensure the current version of each document is available at the point of use.

To comply and to verify with requirements outlined during document submission and receiving as per the document procedure.

Ensure all released documents are compliant and accurate.

Issuing of document reference numbers based on the document numbering procedure for new documents and drawings to be submitted to Client.

Knowledge on document management and storage system such as SharePoint

(CH2M), efilestore (ANSALDO ENERGIA), Secuhard (Hyundai Engineering Co., Ltd) and Project Space (Hyundai Engineering Co., Ltd.

HYUNDAI ENGINEERING AND CONSTRUCTION CO., LTD.

(Main Contractor)

Dubai Electricity & Water Authority

CCPP – L2 Project Site

Dubai, UAE

1,200MW

Spare Part Coordinator and CMMS (Computerized Maintenance Management System) Team Leader

(Apr 2008 to Aug 2014)

CMMS (Computerized Maintenance Management System) Team Leader

(Dec 2010 to Aug 2014)

Check each OEM manual of each parts of the equipment (exploded drawings) and input in data log for CMMS data requirements.

Walked down and check in the site the information of every parts of equipment in power plant if the document/drawings are not available.

Gathered all detailed data for CMMS requirements in each parts of power plant equipment for proper maintenance period frequency. Unrestricted 3

Check and gathered each OEM for maintenance period of each equipment and manage it’s check list.

Coordinate with client CMMS Engineer to provide correct data for CMMS system before uploading to their system.

Spare Part Coordinator:

(Apr 2008 – Nov 2010)

Responsible for pre-inspection of delivered spare parts prior handed-over to Client/Owner as per specification requirements.

Procures technical documents from main vendors (SIEMENS, ALSTOM, NEM & HHI) for providing client’s references in requesting for inspection and during inspection.

Prepare reports after pre-inspections of spare parts and after done inspection by clients.

Coordinates with vendors and clients to provide correction for any issues/discrepancy arises during inspections.

ANALOG DEVICES INC.

Cavite, Philippines

Semiconductor – Manufacturing (American Multinational Company) Equipment Maintenance

(May 1997 to March 2008)

Set-up Manufacturing Equipment (system, handlers for testing and machines for assembly) according to established procedure and parameter settings in the shortest possible time.

Conducts regular preventive maintenance, and hardware verification at pre- defined intervals following prescribed methods and procedures.

Exercises wise and intelligent use of spare parts as a means of cost control without sacrificing maintenance quality and equipment up time.

Ensures adherence to standard workmanship, policies, procedures, and specifications in the execution of function.

Performs initial set-up and verification of new or newly transferred Manufacturing Equipment and Hardware required by the existing quality requirements.

Fabricates and participates in the design and conceptualization of the production jigs.

Participates in company quality improvement program such as TPM, SPC, PDCA and 7 step-problem solving.

PSI TECHNOLOGIES INC.

Manila, Philippines

Semiconductor – Assembly Manufacturing

Assembly Technician

(Dec 1995 to Apr 1997)

Performs regular feedback to immediate supervisor on matters affecting equipment performance and seek his guidance for fast problem resolution when necessary.

Ensures full documentation of projects and other activities for traceability purposes.

Maintains good housekeeping habit and orderly work area.

Ensures adherence to safety procedures and use of safety equipment.

Observes proper ESD precaution when handling electronic components, PCB’s and other electronic fixtures.

In coordination with Maintenance and Manufacturing departments, execute preventive maintenance plan, participate in helpdesk / on-call troubleshooting support, supervised vendor’s maintenance interventions. Unrestricted 4

In coordination with Quality Assurance, execute computer system validation activities to comply with company procedures, international guidelines and regulation.

Essential Job Functions

1. Knowledge on SAP for documentation purposes of all mechanical tooling, modification of process in machines performances and flow of current spare parts availability.

2. Knowledge on PLC controls, do program modification for machine 100% working efficiency.

3. Computer-savvy and well-versed in Microsoft Office products. 4. Expose in Maintenance Management System were correct maintenance schedule are perform correctly and timely.

5. Knowledge on CMMS documentation in Power Plant. 6. Expose in communicating with Vendor, Supplier and Client relevant to Spare Parts and project documents in Power Plant.

7. Ability to plan and manage multiple tasks.

8. Good communication and leadership skills and able to deal with multiple inputs from various engineering disciplines.

9. Experienced in technical document within an EPC environment to enable delivery to the end client.

Trainings

Training Field Location Hours

Smartmark (laser diode) Laser marking Philippines 24 Machine Buy-Off

Advanced Machine

Training

Oita, Japan 72

Hydraulic System Hydraulic System Philippines 32

Basic PLC

Programmable Logic

Control

Philippines 40

Omron Sensors Sensors Philippines 8

Basic Operation ASM Machine training Philippines 8 Festo Monitoring System Logic Control Philippines 8 SPC (Statistical Process Contol) Process Control Philippines 8 Pneumatics Pneumatics System Philippines 32

Computer Technician Computer Philippines 1200

On The Job Training

Communication

Equipment

Philippines 1200

Permit to Work System Training Work Safety

Dubai, United Arab

Emirates

16

Education

Technological University of the Philippines

Electronic Communications Engineering Technology

1991-1994

Endralin Morales Tuquero



Contact this candidate