CURICULUM VITAE
IndraKurniawan
:June *nd
, ****
Address :PTB Duren Sawit Blok R 4 No : 14 Jakarta 13440, Indonesia Phone : +628********** .+628**********
Email:**********@*****.*** . *****.*********@*****.*** Education
Bachelor of Petroleum Engineering ( 1997 ), University of Trisakti,, Jakarta – Indonesia Training and Courses Certificates
Course of Upgrading Coiled Tubing Application In Drilling and Workover Operations, presented by Indonesia Associations of Oil and Gas Drilling Contractors (APMI), July 1997, Jakarta – Indonesia
Course of Hole Deviation And Horizontal Drilling Techniques And Operatons, presented byIndonesia Associations of Oil and Gas Drilling Contractors (APMI), October 1997, Jakarta – Indonesia
Course of Mud School, presented byM-I L.L.C, January – March 1998, Houston – U.S.A
Course of Offshore Orientation and Basic Sea Survival, presented byPetroleum Educational Council, January – March 1998, Houston – U.S.A
Course of Local Content, presented by Amanah Global Energy at China Oilfield Services Limited Office, Jakarta - Indonesia
Other Certificates
Thesis Adviser for Drilling and Drilling Fluid, presented by University of Trisakti, Jakarta
- Indonesia
CURICULUM VITAE
Job Experiences
August 17
th
2019 – Present
Company : FOCUS ENERGY LIMITED, India
Position : Drilling Supervisor
Division : Drilling
Supervisor : Amit Varma ( VP Operation)
Job Description :
- Resposible for drilling program and designed Rigs : HOUSTON, DENVER, OSLO, WARI, NORTH SEA, DAQING
- Communicated with driller, rig sup and tool pusher
- Person in charge for fuction test approval for well intervention equipment.
- Monitoring rig equipment including aseccories and spare part.
- Monitoring progress drilling operation
- Reporting drilling report and communicated with drilling manager
- Monitoring for drilling fluid sytem, engineer and chemicals
- Decide mud system used while drilling including mud parameter. Job Area
Rajasthan, India
Interval Depth = 0 - 4500 meters ( 0-800 meters w/ 12 ”, 800 – 3000 meters w/ 8 ”, 3000- 4500 meters w/ 6”) Mud sytem = KCl PHPA Polymer with 1.2 – 1.35 of SG
Lithology : Thick Green SHALE and black SHALE. Interbed SANDSTONE and LIMESTONE
No contomination Gases : H2S and CO2
No Shallow gas or Pocket Gas
Problem : Floccing and overpulled
Average ROP : 2.8 m/h – 35 m/h withoutt BOP @ 12 ”, Drilling w/o Mud Motor With long open hole 800 – 4500 meters.
Bottom Hole Temperature = 150 – 155o
C
Treatment : Used chemical concentration gradually and KCl 11%, No mud chemical as thinner
May 17
th
2018 – August 17
th
2019
Company : PERTAMINA DRILLING SERVICES
Position : Integrated Petroleum Management Coordinator DWO Division : Drilling and Work Over
Supervisor : Nur Akbar (Project Manager)
Job Description :
- Coordinated Rig Up, Rig Down, Rig Moving.
- Coordinated Safety, Work Plan for DWO
- Coordinated Service Companies for DWO project
CURICULUM VITAE
- Coordinated for Rig Crew with Rig Superintendent
- Supervised Rig Inventory
- Managed Reclamation and socializing for local person.
- Managed and Supervised for DWO activities to achieved target of DWO job. Job Area and Fluid System
a. Pertamina Hulu Energy (ex. Exxon), location Lhoksukon, Aceh. Rig Operation N80/UY3 1000 hp for PLUG AND ABANDONED 37 wells onshore
March 11
th
2013 –May 17
th
2018
Duration : 6 years and 2 months
Company : Energi Tunggal Persada
Position : Drilling Fluid Supervisor
Division : Drilling Fluid
Supervisor : Andita Sri Rachmanto
Job Description :
- Person in charge for drilling fluid designed
- Prepare mud system as company requested by drilling program
- Suggested and designed formulation for potential problem while operation
- Inventory and report to company man for incoming mud chemical on site
- Report daily used of mud chemical to company man
- Supervised mud properties test while drilling checking by junior or mud boy
- Calculated hydrostatic pressure every 1 stand drill pipe
- Calculated Kill Mud Weight for every interval or Mud weight as desired
- Report and monitoring daily mud report
- Build up Heavy mud for killing
- Build up LCM for potential loss zone
- Build up Hi Vis for cleaning hole
- Build up Black Magic formulation for Differential Sticking Pipe
- Monitoring and function test all solid control equipment
- Run circulation from mud pit, mud pump, cellar, shaker, solid control equipment, sand trap, mud pit before job
- Checking spare part of mesh shaker
- Set up mud lab test equipment at dog house
- Well Summary
Job Area and Fluid System
b. Petrochina – Papua, Indonesia / 4 wells / onshore 1500 HP KCl PHPA Polymer 425o
F section 26” – 17 1/2”
/ Oil Based Mud (Saraline 195V) 350o
F
section 12 ”
– 8 ”; Total Depth : 3000 – 3300 meters; Deviation well. Problems : Gumbo, Bit Balling, Shale, Partially Loss Additional Chemicals : Calcium Carbonate (F/M), Black Magic, Disperse Fluid, Tanni, Oil Conditioner
CURICULUM VITAE
c. Kerui Indonesia – Papua, Indonesia / 3 wells / onshore 1000 HP KCl PHPA Polymer 350o
F section 26” - 12 ”
/ Oil Based Mud (Saraline 195V)300o
F
section– 8 ”; Total Depth : 2300 – 2500 meters; Deviation well. Problems : Gumbo, Bit Balling, Shale, Partially Loss Additional Chemicals : Calcium Carbonate (F/M), Black Magic
February 1
st
2011 – March 2013
Duration : 2 years and 1 months
Company : Geolink Nusantara
Position : Drilling Fluid Supervisor
Division : Drilling
Supervisor : T.B Indra
Job Description
- Person in charge for drilling fluid designed
- Prepare mud system as company requested by drilling program
- Suggested and designed formulation for potential problem while operation
- Inventory and report to company man for incoming mud chemical on site
- Report daily used of mud chemical to company man
- Supervised mud properties test while drilling checking by junior or mud boy
- Calculated hydrostatic pressure every 1 stand drill pipe
- Calculated Kill Mud Weight for every interval or Mud weight as desired
- Report and monitoring daily mud report
- Build up Heavy mud for killing
- Build up LCM for potential loss zone
- Build up Hi Vis for cleaning hole
- Build up Black Magic formulation for Differential Sticking Pipe
- Monitoring and function test all solid control equipment
- Run circulation from mud pit, mud pump, cellar, shaker, solid control equipment, sand trap, mud pit before job
- Checking spare part of mesh shaker
- Set up mud lab test equipment at dog house
- Well Summary
.
Job Area and Fluid System
a. Pertamina Java Area – West Java, Indonesia / 22 Development wells and 4 exploration wells / onshore 750 – 1000 HP.
Native Mud section 26” – 17
, KCl PHPA Polymer 300 - 350o
F”
12 ”
– 8 ”; Total
Depth : 3000 – 3300 meters; Deviation well.
Problems : Gumbo, Bit Balling, Shale, Partially Loss, Differential Sticking, High Temperature and High Pressure, Under Balanced Fluid Additional Chemicals : Kwik Seal (M/C), Calcium Carbonate (F/M), Black Magic, Disperse Fluid, Lime, 3M under balanced chemical. HTHP Liquid. b. Pertamina( Gas Development Project of Matindok ) – Central Sulawesi, Luwuk. Indonesia / 11 wells / onshore 1000 HP
Native Mud section 26” – 17
, KCl PHPA Polymer 250 - 325o
F”
12 ”
– 8 ”; Total
CURICULUM VITAE
Depth : 3000 – 3300 meters; Deviation well.
Problems : Gumbo, Bit Balling, Shale, Partially Loss Additional Chemicals : Kwik Seal (M/C), Calcium Carbonate (F/M), Lime, H2S scavenger, Corrosion Inhibitor, Oxygen Scavenger, Biocide, Lubricant c. PertaminaBunyu – East Kalimantan, Indonesia / 11 wells / onshore 1500 HP Native Mud section 26” – 17
, Oil Based Mud Saraline 98 V 250 - 325o
F”
12 ”
– 8 ”;
Total Depth : 3000 – 3300 meters; Deviation well.
Problems : Gumbo, Bit Balling, Shale, Partially Loss Additional Chemicals : Kwik Seal (M/C), Calcium Carbonate (F/M), Oil Conditioner d. Pertamina Exploration – West Java, Indonesia / 6 wells / onshore 1500 HP Native Mud section 26” – 17
, KCl PHPA Polymer 250 - 325o
F”
12 ”
– 8 ”;Total
Depth : 3300 – 3500 meters; Deviation well.
Problems : Gumbo, Bit Balling, Shale, Partially Loss Additional Chemicals : Kwik Seal (M/C), Calcium Carbonate (F/M), Lime, H2S scavenger, Corrosion Inhibitor, Oxygen Scavenger, Biocide, Lubricant
April 16
th
2008 – January 3
rd
, 2011
Duration : 2 years and 8 months
Company : China Oilfield Services Limited ( COSL ) Position : Drilling Fluid Supervisor
Division : Chemical Oilfield
Supervisor : Sun Gang
Job Description :
- Person in charge for drilling fluid designed
- Prepare mud system as company requested by drilling program
- Suggested and designed formulation for potential problem while operation
- Inventory and report to company man for incoming mud chemical on site
- Report daily used of mud chemical to company man
- Supervised mud properties test while drilling checking by junior or mud boy
- Calculated hydrostatic pressure every 1 stand drill pipe
- Calculated Kill Mud Weight for every interval or Mud weight as desired
- Report and monitoring daily mud report
- Build up Heavy mud for killing
- Build up LCM for potential loss zone
- Build up Hi Vis for cleaning hole
- Build up Black Magic formulation for Differential Sticking Pipe
- Monitoring and function test all solid control equipment
- Run circulation from mud pit, mud pump, cellar, shaker, solid control equipment, sand trap, mud pit before job
- Checking spare part of mesh shaker
- Set up mud lab test equipment at dog house
- Well Summary
CURICULUM VITAE
Job Area and Fluid System
a. C.N.O.O.C South Java Sea – South East Sumatra, Indonesia / 65 Development wells. Work Over Well / offshore 2000 HP Jack Up.
Salt Gel Mud section 26” – 17
, DescoCFPolymerand Oil Based Mud (Saraline 98V)
300 - 350o
F”
12 ”
– 8 ”; Total Depth : 1500 – 2500 meters; Deviation well. Problems : Corrosion, Bit Balling, Shale, Partially Loss, Differential Sticking, High Temperature and High Pressure.
Additional Chemicals : Kwik Seal (M/C), Calcium Carbonate (F/M), Black Magic. b. ELNUSA TRISTAR RAMBA – South Sumatra, Indonesia / 3 Development wells. Work Over Well / onshore 1000 HP.
Native Mud section 26” – 17
, KCl PHPA Polymer 250 - 300o
F”
12 ”
– 8 ”; Total
Depth : 2500 – 2800 meters; Deviation well.
Problems : Gumbo, Bit Balling, Shale, Partially Loss Additional Chemicals : Kwik Seal (M/C), Calcium Carbonate (F/M), Lime, H2S scavenger, Corrosion Inhibitor, Oxygen Scavenger, Biocide, Lubricant
February 1
st
, 2006 – april 1
st
, 2008
Duration : 2 years and 2 months
Company : HexindoPetronusa
Position : IPM Project Coordinator
Division : Drilling
Supervisor : EdySyahbandi
Job Description :
- Prepare document for tender (technical and commercial)
- Design for drilling fluid and cementing formula
- Prepare for mobilization Rig and accessories to site
- QC for function test to all rig equipment
- Prepare step for well control
- Prepare crew mobilization
- QC for rig superintendent, driller, ass driller
- Socialized safety induction and stop card
- Prepare drilling fluid and cementing program
- QC for equipment and engineering
- Monitor progress operational
- Under taking problem solving on site
- Budgeting control
Job Area and Fluid System
a. Pertamina Unit Business Tanjung – South Kalimantan, Indonesia / 19 Development wells. Work Over Well / onshore 550 HP.
Native Mud section 17” – 13 3/8
”, KCl PHPA Polymer 250 - 275o
F”
12 ”
– 8 ”; Total
Depth : 1500 – 2000 meters; Deviation well.
Problems : Gumbo, Bit Balling, Shale, Partially Loss CURICULUM VITAE
Additional Chemicals : Kwik Seal (M/C), Calcium Carbonate (F/M), Lime, H2S scavenger, Corrosion Inhibitor, Oxygen Scavenger, Biocide, Lubricant
January 1
st
, 1998 – March 6th, 2006
Duration : 8 years and 2 months
Company : M-I SWACO
Position : Drilling Fluid Engineer
Division : Drilling Fluid
Supervisor : Steve Latanzi, Dash Sihombing
Job Description :
- Person in charge for drilling fluid designed
- Prepare mud system as company requested by drilling program
- Suggested and designed formulation for potential problem while operation
- Inventory and report to company man for incoming mud chemical on site
- Report daily used of mud chemical to company man
- Supervised mud properties test while drilling checking by junior or mud boy
- Calculated hydrostatic pressure every 1 stand drill pipe
- Calculated Kill Mud Weight for every interval or Mud weight as desired
- Report and monitoring daily mud report
- Build up Heavy mud for killing
- Build up LCM for potential loss zone
- Build up Hi Vis for cleaning hole
- Build up Black Magic formulation for Differential Sticking Pipe
- Monitoring and function test all solid control equipment
- Run circulation from mud pit, mud pump, cellar, shaker, solid control equipment, sand trap, mud pit before job
- Checking spare part of mesh shaker
- Set up mud lab test equipment at dog house
- Well Summary
.
Job Area and Fluid System
a. Exxon Mobil, Lhoksukon– Aceh, Indonesia / 2 Exploration wells / onshore 1500 HP. Native Mud section 17” – 13 3/8
”, Oil Based Mud (Diesel) 350 - 425o
F”
12 ”
– 8 ”; Total
Depth : 2500 – 3000 meters; Conventional well.
Problems : Gumbo, High Temperature, Oil water Ration, Shale b. GULF, Palembang – South Sumatera, Indonesia / 14 Exploration,Development and Work Over wells / onshore 1000 - 1500 HP.
Native Mud section 17” – 13 3/8
”, KCl Polymer Mud (Disperse) 300 - 325o
F”
12 ”
– 8 ”;
Total Depth : 2500 – 3000 meters; Conventional well. Problems : Gumbo, High Temperature, Sloughing Formation, Differential Sticking, Partially Loss
c. GULF, Kakap – Natuna, Indonesia / 2 Development and Work Over wells / Offshore 2000 HP.
CURICULUM VITAE
Native Mud section 17” – 13 3/8
”, Oil Based Mud (Diesel) 350 - 425o
F”
12 ”
– 8 ”;
Total Depth : 2500 – 3000 meters; Conventional well. Problems : Gumbo, High Temperature, Oil water Ration, Shale e. Maxus, West Java Sea – Java, Indonesia / 10 Development and Work Over Wells / Offshore 2000 HP.
Native Mud section 17” – 13 3/8
”, Oil Based Mud (Diesel) 350 - 425o
F”
12 ”
– 8 ”;
Total Depth : 2500 – 3000 meters; Conventional well. Problems : Gumbo, High Temperature, Oil water Ration, Shale
SUMMARY
a. Total Years Experiences : 20 years and 5 months b. Total Years Onshore / Numbers : 10 years / 95 wells c. Total Years Offshore / Numbers : 9 years / 77 wells d. Total Years OBM : 5 years
e. Total Years WBM : 14 years
f. Total Years HTHP : 10 years
Other Activities
1995 – 1996 Vice President of Trisakti Volley Team 1992 – 1996 Member of Taekwondo atUniversity ofTrisakti 1991 – 1996 Member of Aikido atUniversity ofTrisakti 1991 – 1996Trisakti Football AssociationatUniversity ofTrisakti Regards,
IndraKurniawan