Post Job Free

Resume

Sign in

Drilling Engineer

Location:
Jakarta, Indonesia
Posted:
July 22, 2020

Contact this candidate

Resume:

CURICULUM VITAE

IndraKurniawan

:June *nd

, ****

Address :PTB Duren Sawit Blok R 4 No : 14 Jakarta 13440, Indonesia Phone : +628********** .+628**********

Email:adesfu@r.postjobfree.com . adesfu@r.postjobfree.com Education

Bachelor of Petroleum Engineering ( 1997 ), University of Trisakti,, Jakarta – Indonesia Training and Courses Certificates

Course of Upgrading Coiled Tubing Application In Drilling and Workover Operations, presented by Indonesia Associations of Oil and Gas Drilling Contractors (APMI), July 1997, Jakarta – Indonesia

Course of Hole Deviation And Horizontal Drilling Techniques And Operatons, presented byIndonesia Associations of Oil and Gas Drilling Contractors (APMI), October 1997, Jakarta – Indonesia

Course of Mud School, presented byM-I L.L.C, January – March 1998, Houston – U.S.A

Course of Offshore Orientation and Basic Sea Survival, presented byPetroleum Educational Council, January – March 1998, Houston – U.S.A

Course of Local Content, presented by Amanah Global Energy at China Oilfield Services Limited Office, Jakarta - Indonesia

Other Certificates

Thesis Adviser for Drilling and Drilling Fluid, presented by University of Trisakti, Jakarta

- Indonesia

CURICULUM VITAE

Job Experiences

August 17

th

2019 – Present

Company : FOCUS ENERGY LIMITED, India

Position : Drilling Supervisor

Division : Drilling

Supervisor : Amit Varma ( VP Operation)

Job Description :

- Resposible for drilling program and designed Rigs : HOUSTON, DENVER, OSLO, WARI, NORTH SEA, DAQING

- Communicated with driller, rig sup and tool pusher

- Person in charge for fuction test approval for well intervention equipment.

- Monitoring rig equipment including aseccories and spare part.

- Monitoring progress drilling operation

- Reporting drilling report and communicated with drilling manager

- Monitoring for drilling fluid sytem, engineer and chemicals

- Decide mud system used while drilling including mud parameter. Job Area

Rajasthan, India

Interval Depth = 0 - 4500 meters ( 0-800 meters w/ 12 ”, 800 – 3000 meters w/ 8 ”, 3000- 4500 meters w/ 6”) Mud sytem = KCl PHPA Polymer with 1.2 – 1.35 of SG

Lithology : Thick Green SHALE and black SHALE. Interbed SANDSTONE and LIMESTONE

No contomination Gases : H2S and CO2

No Shallow gas or Pocket Gas

Problem : Floccing and overpulled

Average ROP : 2.8 m/h – 35 m/h withoutt BOP @ 12 ”, Drilling w/o Mud Motor With long open hole 800 – 4500 meters.

Bottom Hole Temperature = 150 – 155o

C

Treatment : Used chemical concentration gradually and KCl 11%, No mud chemical as thinner

May 17

th

2018 – August 17

th

2019

Company : PERTAMINA DRILLING SERVICES

Position : Integrated Petroleum Management Coordinator DWO Division : Drilling and Work Over

Supervisor : Nur Akbar (Project Manager)

Job Description :

- Coordinated Rig Up, Rig Down, Rig Moving.

- Coordinated Safety, Work Plan for DWO

- Coordinated Service Companies for DWO project

CURICULUM VITAE

- Coordinated for Rig Crew with Rig Superintendent

- Supervised Rig Inventory

- Managed Reclamation and socializing for local person.

- Managed and Supervised for DWO activities to achieved target of DWO job. Job Area and Fluid System

a. Pertamina Hulu Energy (ex. Exxon), location Lhoksukon, Aceh. Rig Operation N80/UY3 1000 hp for PLUG AND ABANDONED 37 wells onshore

March 11

th

2013 –May 17

th

2018

Duration : 6 years and 2 months

Company : Energi Tunggal Persada

Position : Drilling Fluid Supervisor

Division : Drilling Fluid

Supervisor : Andita Sri Rachmanto

Job Description :

- Person in charge for drilling fluid designed

- Prepare mud system as company requested by drilling program

- Suggested and designed formulation for potential problem while operation

- Inventory and report to company man for incoming mud chemical on site

- Report daily used of mud chemical to company man

- Supervised mud properties test while drilling checking by junior or mud boy

- Calculated hydrostatic pressure every 1 stand drill pipe

- Calculated Kill Mud Weight for every interval or Mud weight as desired

- Report and monitoring daily mud report

- Build up Heavy mud for killing

- Build up LCM for potential loss zone

- Build up Hi Vis for cleaning hole

- Build up Black Magic formulation for Differential Sticking Pipe

- Monitoring and function test all solid control equipment

- Run circulation from mud pit, mud pump, cellar, shaker, solid control equipment, sand trap, mud pit before job

- Checking spare part of mesh shaker

- Set up mud lab test equipment at dog house

- Well Summary

Job Area and Fluid System

b. Petrochina – Papua, Indonesia / 4 wells / onshore 1500 HP KCl PHPA Polymer 425o

F section 26” – 17 1/2”

/ Oil Based Mud (Saraline 195V) 350o

F

section 12 ”

– 8 ”; Total Depth : 3000 – 3300 meters; Deviation well. Problems : Gumbo, Bit Balling, Shale, Partially Loss Additional Chemicals : Calcium Carbonate (F/M), Black Magic, Disperse Fluid, Tanni, Oil Conditioner

CURICULUM VITAE

c. Kerui Indonesia – Papua, Indonesia / 3 wells / onshore 1000 HP KCl PHPA Polymer 350o

F section 26” - 12 ”

/ Oil Based Mud (Saraline 195V)300o

F

section– 8 ”; Total Depth : 2300 – 2500 meters; Deviation well. Problems : Gumbo, Bit Balling, Shale, Partially Loss Additional Chemicals : Calcium Carbonate (F/M), Black Magic

February 1

st

2011 – March 2013

Duration : 2 years and 1 months

Company : Geolink Nusantara

Position : Drilling Fluid Supervisor

Division : Drilling

Supervisor : T.B Indra

Job Description

- Person in charge for drilling fluid designed

- Prepare mud system as company requested by drilling program

- Suggested and designed formulation for potential problem while operation

- Inventory and report to company man for incoming mud chemical on site

- Report daily used of mud chemical to company man

- Supervised mud properties test while drilling checking by junior or mud boy

- Calculated hydrostatic pressure every 1 stand drill pipe

- Calculated Kill Mud Weight for every interval or Mud weight as desired

- Report and monitoring daily mud report

- Build up Heavy mud for killing

- Build up LCM for potential loss zone

- Build up Hi Vis for cleaning hole

- Build up Black Magic formulation for Differential Sticking Pipe

- Monitoring and function test all solid control equipment

- Run circulation from mud pit, mud pump, cellar, shaker, solid control equipment, sand trap, mud pit before job

- Checking spare part of mesh shaker

- Set up mud lab test equipment at dog house

- Well Summary

.

Job Area and Fluid System

a. Pertamina Java Area – West Java, Indonesia / 22 Development wells and 4 exploration wells / onshore 750 – 1000 HP.

Native Mud section 26” – 17

, KCl PHPA Polymer 300 - 350o

F”

12 ”

– 8 ”; Total

Depth : 3000 – 3300 meters; Deviation well.

Problems : Gumbo, Bit Balling, Shale, Partially Loss, Differential Sticking, High Temperature and High Pressure, Under Balanced Fluid Additional Chemicals : Kwik Seal (M/C), Calcium Carbonate (F/M), Black Magic, Disperse Fluid, Lime, 3M under balanced chemical. HTHP Liquid. b. Pertamina( Gas Development Project of Matindok ) – Central Sulawesi, Luwuk. Indonesia / 11 wells / onshore 1000 HP

Native Mud section 26” – 17

, KCl PHPA Polymer 250 - 325o

F”

12 ”

– 8 ”; Total

CURICULUM VITAE

Depth : 3000 – 3300 meters; Deviation well.

Problems : Gumbo, Bit Balling, Shale, Partially Loss Additional Chemicals : Kwik Seal (M/C), Calcium Carbonate (F/M), Lime, H2S scavenger, Corrosion Inhibitor, Oxygen Scavenger, Biocide, Lubricant c. PertaminaBunyu – East Kalimantan, Indonesia / 11 wells / onshore 1500 HP Native Mud section 26” – 17

, Oil Based Mud Saraline 98 V 250 - 325o

F”

12 ”

– 8 ”;

Total Depth : 3000 – 3300 meters; Deviation well.

Problems : Gumbo, Bit Balling, Shale, Partially Loss Additional Chemicals : Kwik Seal (M/C), Calcium Carbonate (F/M), Oil Conditioner d. Pertamina Exploration – West Java, Indonesia / 6 wells / onshore 1500 HP Native Mud section 26” – 17

, KCl PHPA Polymer 250 - 325o

F”

12 ”

– 8 ”;Total

Depth : 3300 – 3500 meters; Deviation well.

Problems : Gumbo, Bit Balling, Shale, Partially Loss Additional Chemicals : Kwik Seal (M/C), Calcium Carbonate (F/M), Lime, H2S scavenger, Corrosion Inhibitor, Oxygen Scavenger, Biocide, Lubricant

April 16

th

2008 – January 3

rd

, 2011

Duration : 2 years and 8 months

Company : China Oilfield Services Limited ( COSL ) Position : Drilling Fluid Supervisor

Division : Chemical Oilfield

Supervisor : Sun Gang

Job Description :

- Person in charge for drilling fluid designed

- Prepare mud system as company requested by drilling program

- Suggested and designed formulation for potential problem while operation

- Inventory and report to company man for incoming mud chemical on site

- Report daily used of mud chemical to company man

- Supervised mud properties test while drilling checking by junior or mud boy

- Calculated hydrostatic pressure every 1 stand drill pipe

- Calculated Kill Mud Weight for every interval or Mud weight as desired

- Report and monitoring daily mud report

- Build up Heavy mud for killing

- Build up LCM for potential loss zone

- Build up Hi Vis for cleaning hole

- Build up Black Magic formulation for Differential Sticking Pipe

- Monitoring and function test all solid control equipment

- Run circulation from mud pit, mud pump, cellar, shaker, solid control equipment, sand trap, mud pit before job

- Checking spare part of mesh shaker

- Set up mud lab test equipment at dog house

- Well Summary

CURICULUM VITAE

Job Area and Fluid System

a. C.N.O.O.C South Java Sea – South East Sumatra, Indonesia / 65 Development wells. Work Over Well / offshore 2000 HP Jack Up.

Salt Gel Mud section 26” – 17

, DescoCFPolymerand Oil Based Mud (Saraline 98V)

300 - 350o

F”

12 ”

– 8 ”; Total Depth : 1500 – 2500 meters; Deviation well. Problems : Corrosion, Bit Balling, Shale, Partially Loss, Differential Sticking, High Temperature and High Pressure.

Additional Chemicals : Kwik Seal (M/C), Calcium Carbonate (F/M), Black Magic. b. ELNUSA TRISTAR RAMBA – South Sumatra, Indonesia / 3 Development wells. Work Over Well / onshore 1000 HP.

Native Mud section 26” – 17

, KCl PHPA Polymer 250 - 300o

F”

12 ”

– 8 ”; Total

Depth : 2500 – 2800 meters; Deviation well.

Problems : Gumbo, Bit Balling, Shale, Partially Loss Additional Chemicals : Kwik Seal (M/C), Calcium Carbonate (F/M), Lime, H2S scavenger, Corrosion Inhibitor, Oxygen Scavenger, Biocide, Lubricant

February 1

st

, 2006 – april 1

st

, 2008

Duration : 2 years and 2 months

Company : HexindoPetronusa

Position : IPM Project Coordinator

Division : Drilling

Supervisor : EdySyahbandi

Job Description :

- Prepare document for tender (technical and commercial)

- Design for drilling fluid and cementing formula

- Prepare for mobilization Rig and accessories to site

- QC for function test to all rig equipment

- Prepare step for well control

- Prepare crew mobilization

- QC for rig superintendent, driller, ass driller

- Socialized safety induction and stop card

- Prepare drilling fluid and cementing program

- QC for equipment and engineering

- Monitor progress operational

- Under taking problem solving on site

- Budgeting control

Job Area and Fluid System

a. Pertamina Unit Business Tanjung – South Kalimantan, Indonesia / 19 Development wells. Work Over Well / onshore 550 HP.

Native Mud section 17” – 13 3/8

”, KCl PHPA Polymer 250 - 275o

F”

12 ”

– 8 ”; Total

Depth : 1500 – 2000 meters; Deviation well.

Problems : Gumbo, Bit Balling, Shale, Partially Loss CURICULUM VITAE

Additional Chemicals : Kwik Seal (M/C), Calcium Carbonate (F/M), Lime, H2S scavenger, Corrosion Inhibitor, Oxygen Scavenger, Biocide, Lubricant

January 1

st

, 1998 – March 6th, 2006

Duration : 8 years and 2 months

Company : M-I SWACO

Position : Drilling Fluid Engineer

Division : Drilling Fluid

Supervisor : Steve Latanzi, Dash Sihombing

Job Description :

- Person in charge for drilling fluid designed

- Prepare mud system as company requested by drilling program

- Suggested and designed formulation for potential problem while operation

- Inventory and report to company man for incoming mud chemical on site

- Report daily used of mud chemical to company man

- Supervised mud properties test while drilling checking by junior or mud boy

- Calculated hydrostatic pressure every 1 stand drill pipe

- Calculated Kill Mud Weight for every interval or Mud weight as desired

- Report and monitoring daily mud report

- Build up Heavy mud for killing

- Build up LCM for potential loss zone

- Build up Hi Vis for cleaning hole

- Build up Black Magic formulation for Differential Sticking Pipe

- Monitoring and function test all solid control equipment

- Run circulation from mud pit, mud pump, cellar, shaker, solid control equipment, sand trap, mud pit before job

- Checking spare part of mesh shaker

- Set up mud lab test equipment at dog house

- Well Summary

.

Job Area and Fluid System

a. Exxon Mobil, Lhoksukon– Aceh, Indonesia / 2 Exploration wells / onshore 1500 HP. Native Mud section 17” – 13 3/8

”, Oil Based Mud (Diesel) 350 - 425o

F”

12 ”

– 8 ”; Total

Depth : 2500 – 3000 meters; Conventional well.

Problems : Gumbo, High Temperature, Oil water Ration, Shale b. GULF, Palembang – South Sumatera, Indonesia / 14 Exploration,Development and Work Over wells / onshore 1000 - 1500 HP.

Native Mud section 17” – 13 3/8

”, KCl Polymer Mud (Disperse) 300 - 325o

F”

12 ”

– 8 ”;

Total Depth : 2500 – 3000 meters; Conventional well. Problems : Gumbo, High Temperature, Sloughing Formation, Differential Sticking, Partially Loss

c. GULF, Kakap – Natuna, Indonesia / 2 Development and Work Over wells / Offshore 2000 HP.

CURICULUM VITAE

Native Mud section 17” – 13 3/8

”, Oil Based Mud (Diesel) 350 - 425o

F”

12 ”

– 8 ”;

Total Depth : 2500 – 3000 meters; Conventional well. Problems : Gumbo, High Temperature, Oil water Ration, Shale e. Maxus, West Java Sea – Java, Indonesia / 10 Development and Work Over Wells / Offshore 2000 HP.

Native Mud section 17” – 13 3/8

”, Oil Based Mud (Diesel) 350 - 425o

F”

12 ”

– 8 ”;

Total Depth : 2500 – 3000 meters; Conventional well. Problems : Gumbo, High Temperature, Oil water Ration, Shale

SUMMARY

a. Total Years Experiences : 20 years and 5 months b. Total Years Onshore / Numbers : 10 years / 95 wells c. Total Years Offshore / Numbers : 9 years / 77 wells d. Total Years OBM : 5 years

e. Total Years WBM : 14 years

f. Total Years HTHP : 10 years

Other Activities

1995 – 1996 Vice President of Trisakti Volley Team 1992 – 1996 Member of Taekwondo atUniversity ofTrisakti 1991 – 1996 Member of Aikido atUniversity ofTrisakti 1991 – 1996Trisakti Football AssociationatUniversity ofTrisakti Regards,

IndraKurniawan



Contact this candidate