CURRICULAM VITAE
RAJENDRAN S
NAME : Rajendran S
DATE OF BIRTH : 01st
June 1974
EXPERIENCE : 24+Years
PROFESSION:070067139 : Civil Engineering
CONTACT INFORMATION : +91-701******* Email - *******@*****.*** Tirunelveli Dist, Tamil Nadu, India.il. NATIONALITY : Indian
EDUCATION : Degree in Civil Engineering
COUNTRIES OF WORK EXPERIENCE : India, Bahrain
KEY QUALIFICATION : Over 24 + Years of fruitful & Enriching experience in the field of Water Supply and Waste Water Scheme. Capable of working independently on Project Management, Construction Management in Transmission & Treatment Of Water & Wastewater which includes Treatment plant, Lift stations, Pump systems, Storage tanks, Collection system, Water transport,Distribution system, Irrigation system, Storm water management and sewage pumping stations, Sewer network, Intake well, Elevated service reservoir, Sump and pump house, Sewage treatment plants.
Good expertise in constructing the pump house, WTP, Reservoir, Sumps & Water related structures. Good exposure in water pipeline & water related civil structures. Laying, jointing, and testing of various types & various diameters of pipelines and other related infrastructure projects. Experience in the developing water and waste project management process for large scale projects (national & international projects) and committed to providing high - quality service to every project, with a focus on health, safety, and environmental issues. KEY AREAS OF EXPERTISE/COMPETENCIES:
• Execution of projects meeting timelines and budget.
• Execution of projects meeting timelines and budget Coordinate required procurement of materials and equipment with purchasing agent, with emphasis on buyout plan to meet, or improve on, established schedule dates and budget cost.
• Monitoring construction costs and prepare monthly construction cost reports, Including projected cash flows for the project, Project expenses, and payments, outstanding payments due under the contract and adjustments to the Contract Sum due to variations etc. including Earned Value Management.
• Providing leadership and technical support to project engineers, Field engineers and superintendents.
• Lead technical support to Operations and Engineering as required, e. g. In troubleshooting and problem analysis.
• Maintaining profit/loss accountability for individual projects to include job cost controls as established by the execution team and take proactive measures to meet or beat budgeted costs.
• Ensuring availability of sufficient and suitable resources, Materials and equipment to complete all project work within approved project budgets, timelines and quality.
• Order and properly allocate cost for all material resources needed to complete the project.
• Monitoring self-performed work to ensure labour and equipment resources are in line with needs.
• Ensure assigned projects are properly staffed with appropriate field forces. This includes: 1) Review, updating and approval of labour resource loading; and, 2) Labour productivity.
• Track project progress and exploit critical path of the project to meet the project timelines.
• Submitting regular billings to owners to ensure prompt payment.
• Review all billings to ensure accurate reflection of job cost.
• Managing the client interface in terms of deliverables, grievances, and issues.
• Coordination with the Client and project team and subcontractors, Vessels’ teams for smooth project delivery and fulfilment of contractual obligation.
• Responsible for overall financial performance of all assigned projects, including continual cost control, Management and forecasting.
• Guide and ensure effective development of schedule and cost control formats for the project and budget monitoring purpose.
• Developing and implementing the process for defining the BOQ and regularly updating the same concurrently to the design changes/deviations/variations.
• Good knowledge in standard contract forms such as FIDIC, MDB (Multilateral Development Bank) Harmonized edition for bank financed projects, MDB construction contract. Good knowledge in adjudication and arbitration contract procedure.
• Enriched practice of construction method as per Indian Standards /JBIC National & International, FIDIC Conditions of Contract and Execution Method.
• Performing tasks requiring knowledge of the FIDIC Contract and specific legal procedures, extensive follow up of contractual rights & duties.
• Ensuring that contractual notices are issued in accordance with conditions of contract.
• Reviewing all incoming contractual correspondences from Consultants / Clients / Sub Contractors related to the projects.
• Administrating contractual communications and sending notifications as per Contract, Managing completion / work provisional / final acceptance certificates.
• Guide to Preparing and reviewing the weekly and monthly Program and progress with consultants & clients.
• To ensure contract agreements are expeditiously secured, reviewed, processed and executed.
• Identifying, evaluating and submitting all potential variations / claims. Attending meetings and addressing contractual matters with client / CURRICULAM VITAE
RAJENDRAN S
consultants and negotiating variations / claims seeking approvals and mitigating any contractual disputes.
• Submitting progress claims. Identify and managing changes including submitting, Administrating, and negotiating Change Orders and Time Extension claims (EOT).
• Liaison with counterparties to manage claims, disputes and contract discrepancies.
• Subcontract agreement negotiation, preparation, processing and execution.
• Monitoring the activities of subcontractors to ensure compliance with specifications and procedures and with the project objectives for safety, quality, productivity, schedule and cost. Provide solutions to subcontractor’s problems in order to achieve the successful execution of the project.
• Preparing Inspection and test plans, Method statements for the works to be executed on site.
• Oversee tools and rental equipment use on all assigned projects. Ensure that any tools and rental equipment not required, or not being utilized, are returned immediately.
• Co-ordinate work of procurement plan schedule &discuss with CLIENT and PIU for evaluation negotiation & award of tenders &assist client in entering into contracts with successful bidders. Check adequacy of contractor’s material inputs, Construction methods, Manpower, machine, and equipment for construction.
LANGUAGES SKILL:
Speak Read Write
English Excellent Excellent Excellent
Hindi Excellent - -
Telugu Excellent - -
Malayalam Excellent - -
Tamil Excellent - -
EMPLOYMENT RECORD :
Date: March 2020 – Present
Name of Organization: RG Industries.
Position Held: Project Manager
Name of Project: Water Supply Augmentation & Supply, Installation, Commissioning, and Operation & Maintenance for Smart Water Meters & Related Infrastructure Work for Water Supply System of Dehradun city including Operation and maintenance for 5 years under “Smart City Mission”. Client:Smart City Limited, Dehradun
Source of Funding: Government of India & Government of Uttarakhand Location: Dehradun, Uttarakhand
Main Project Feature: Proving and Laying Double Flanged (Screwed/Welded) Centrifugally Cast (Spun) Ductile Iron Pipes of class K-9 of 6.3 KM, Laying & Jointing of full length S&S Centrifugally Cast (Spun) Ductile Iron Pipes D.I. Pipe S&S K-7 of 43.0 KM & Providing and laying D.I. specials of class K-12 suitable for push-on jointing as per IS: 9523-2001& Supplying fixing of valves such as Non Return valve, Sluice valve and Air valve & Supply Inserting, Installation and fixing water meters of mechanical type AMR Water Meter with inbuilt wireless AMR facility based on R/F technology, Dry dial inferential type, Multi jet, Magnetically coupled Class-B or electromagnetic or ultrasonic pressure rating PN 16 temper proof Non Domestic Water Meters with plastic cap pre-equipped for remote reading complete with tubular strainer, brass nuts and nipples as per IS:779:1994 and ISO:4064 standard with EEC/MID certification mark with protection class of IP68 for wireless AMR water meter of 15 mm,20 mm,25 mm,40 mm
& 50 mm sizes. Construction of a Tube Well, Supply and Installation of Pumping Plant, Automation of Pumping Plant, Transmission line, its Rising Main up to the existing Over Head Tank and Stabilization. Construction of Boundary wall, Pump House & 3.60 M. wide Iron Gate with pillars. Operation and Maintenance of works for 5 years.
Activities Performed :
• Managing and supervising day-to-day operations of staff teams on assigned projects.
• Responsible for overall construction management, quality assurance and administration of the contracts under the project.
• Ensuring availability of sufficient and suitable resources, materials and equipment to complete all project work within approved project budgets, timelines and quality.
• Implementation of work as per design.
• Provide training on best practices in construction management; contract management and Performance.
• Monitoring of the contractors, Support in preparing Project Completion Report and progress reports.
• Assist in resolving contractual issue during implementation.
• Monitoring self-performed work to ensure labour and equipment resources are in line with needs.
• Track project progress and exploit critical path of the project to meet the project timelines.
• Ensuring work is carried out in accordance with HSE policy and procedures. Date:January 2017 – December 2019
Name of Organization: AECOM India Pvt. Ltd.
CURRICULAM VITAE
RAJENDRAN S
Position Held: Construction Manager
Name of Project: 24 x 7 Water Supply Scheme to Magadi Town Municipal Council. Construction of OHT’s, Distribution System &Providing House Service Connections. Consultancy Services & Preparation of DPR for Package 3 – 10 ULBs in the state Viz. Holenarasipura, Kanakapura,Magadi, Chikkamagalur, Kollegal, Nagamangala, Nanjangud, Sira, T.Narasipura& Shimoga1. Client: Karnataka Urban Infrastructure Development & Finance Corporation Source of Funding: World Bank Funding
Location: Magadi, Karnataka
Main Project Feature: The project comprises Rehabilitation work of WTP capacity of 5.8 MLD, Providing & Laying clear water rising main Length of 15Km DI Pipe. Providing and laying of HDPE Pipeline for Water Distribution from all Over Head Tank for a length of 82.74 Km, Construction of OHT –2No’s such as 750 KL and 150 KL, Providing of House Service Connection through MDPE Pipe containing Multi Jet Magnetic Wireless AMR
(Automated Magnetic Reading )Water Meter – 6100 No’s with residual pressure of 7M at consumer end. Implementation of Integrated Information Management System (IIMS) for Billing, Collection, and for enhanced Customer Care Centre in ULB. Construction of Pump House and allied Electro Mechanical works comprises Installation of VT & Horizontal Split Casing Type Pumps and Motors, Bulk Flow Meter, PH & Turbidity & Chlorine Analyzers, Flash Mixer, Flow Control valve and Variable Frequency Derive for Mass Balancing System. Providing and installation of Surge Protection System by installing Bladder Type Surge Protection Vessel and Surge Suppression Air Valve. The objective of the consultancy is to provide overall management support, formulation of project management plans, planning, design, detailed engineering services, procurement support, construction supervision support including reporting and advice on physical, financial, social, and institutional matters for implementation. Activities Performed :
• Assisting CLIENT & PIU in discharging day-to-day works related to supervision of construction and renovation of the project.
• Check and coordinate approval of designs, drawings& data sheets etc. submitted by contractors.
• Compile and review all day–to-day quality control data obtained from the construction sites, and verify the accuracy of such data by random checks of the records and by carrying out independent tests.
• Check& recommend of approval of contractor’s claims, Variation orders, and Time extension cases, Extra items additional components forwarded by contractor and prepare recommendations for approval of CLIENT/PIU.
• Order and properly allocate cost for all material resources needed to complete the project.
• Guide and ensure effective development of schedule and cost control formats for the project and budget monitoring purpose.
• Developing and implementing the process for defining the BOQ and regularly updating the same concurrently to the design changes/deviations/variations.
• Performing tasks requiring knowledge of the FIDIC Contract and specific legal procedures, extensive follow up of contractual rights & duties.
• Ensuring that contractual notices are issued in accordance with conditions of contract
• Reviewing all incoming contractual correspondences from Consultants / Clients / Sub Contractors related to the projects.
• Administrating contractual communications and sending notifications as per Contract, managing completion / work provisional / final acceptance certificates.
• Identifying, evaluating and submitting all potential variations / claims. Attending meetings and addressing contractual matters with client / consultants and negotiating variations / claims seeking approvals and mitigating any contractual disputes.
• Managing site contracts according to the agreed procedures.
• Managing the client interface in terms of deliverables, grievances, and issues.
• Providing leadership and technical support to project engineers, field engineers and superintendents.
• Lead technical support to Operations and Engineering as required, e. g. In troubleshooting and problem analysis.
• To ensure contract agreements are expeditiously secured, reviewed, processed and executed.
• Submitting progress claims. Identify and managing changes including submitting, Administrating, and negotiating Change Orders and Time Extension claims (EOT).
Date:May 2010 – December 2016
Name of Organization: M/s. Ravi Associates.
Position Held: Project Manager
Name of Project: Improvements to Water Supply Scheme to Thoothukudi CMC – Package- III – Providing clear Water Feeder Main to Network with MS/DI Pipes Size of 1100mm to 150mm diameter from Transmission Main (near NH 45B) to all OHT’s with length a of 45.50 km for Thoothukudi WSIS
Client: Thoothukudi City Municipal Corporation
Source of Funding: JICA Funding
Location: Thoothukudi, Tamil Nadu
Main Project Feature: Thoothukudi City Municipal Corporation has proposed to cover entire town (including new/upcoming areas, slums etc.) with 100% sustainable drinking water supply facilities. The Government in G.O.Ms.No.3, Municipal Administration & Water Supply (MC-6) Department, and dated 22.10.2012 have accorded Administrative Sanction for an amount of Rs.282.44 crores to install and Rs.6.19 crores for maintenance of Water Supply Improvement Scheme to Thoothukudi City Municipal Corporation. The project comprises 6 packages includes (i) Provide Intake Well CURRICULAM VITAE
RAJENDRAN S
with Pump room at U/S of Maruthur Dam, Raw water pumping main for a length of 10.85KM Laying of 1100mm dia. MS Pipeline, Construction of 84 MLD Water Treatment Plant. (ii) Providing Clear water Gravity Transmission main with MS pipe size of 1200mm dia. from WTP to First Feeder main junction Near- NH 45B for Thoothukudi Water Supply. (iii) Providing Clear water Feeder main network with MS/DI pipes size of 1100mm to 150mm dia. from Transmission main (Near NH-45B) to all OHTs for Thoothukudi Water Supply. (iv)Providing Water supply Distribution system and Construction of 22 Nos. of OHTs for Zone Nos-1 to 30. Activities Performed:
• Oversee all projects operations Responsible to implementing Day to day activities of the project.
• Preparing and updating site daily report on time, Preparing Master program and ensure work progress in accordance with schedule. Build a key relationship with the client.
• Managing the cost of variation works and time implications, Certification of payment, site disputes, planning of site facilities.
• Control the use of site resources and overall project cost on site, To ensure works are being carried out safely and in accordance with the latest WSH Act provision.
• To ensure timely completion, Profitability, Safety and Quality of all projects.
• Monitoring and control wastage on site.
• Identify possible resource constraints and initiate preventive measures, Mobilize resources and take corrective action to resolve problems.
• Review of all necessary documentation for "Cost to Completion" Cash Flow forecast, Assess impact on time & cost of the project and share with relevant authorities.
• System implementation for Quality, safety, and environment.
• Understand and follow OH&S procedures, Lead the team of engineers for the assigned project, Safety – Responsible for personal safety, safe working practices for the Business Unit,
• Managing & Execution of entire site project.
Date:March 2008 – April 2010
Name of Organization: M/s. IVRCL Infrastructure & Projects Ltd Position Held: Deputy Manager
Name of Project: Providing Comprehensive Water Supply Scheme to Ambattur Municipality – Providing Distribution System, Construction of Distribution Station (Over Head Tank), Laying of Conveying Mains (Varies Diameter of D.I Pipes from 100mm to 600mm) – Chennai. Client: Chennai Metro Water Supply and Sewerage Board Source of Funding: JNNURM Funding
Location: Chennai, Tamil Nadu
Main Project Feature: 1. As a drought proofing measure and to augment supply of water to Chennai city, CMWSSB Board has set up a 100MLD capacity Sea water desalination plant on Design, Build, Own, Operate and Transfer (DBOOT)basis. CMWSSB Board entered in to Bulk Water purchase Agreement (BWPA) with the Special Purpose Vehicle, M/s. Chennai Water Desalination Limited (M/s. CWDL) for setting up the plant. This agreement will be in force for a period of 25 years and during this period, CMWSSB Board will purchase the water from M/S.CWDL as per the conditions stipulated in the BWPA. The asset will be transferred to CMWSS Board after 25 years. The plant was dedicated to the Chennai city. Project focuses on conveying 100 MLD product water from the Desalination plant to various pumping stations through 1000mm dia DI pipeline. Main Project Feature: 2. Project focuses on Providing Comprehensive Water Supply to Ambattur Municipality 257.24 MLD of Water – Providing Distribution System, Construction of Distribution Station (Over Head Tank), Laying of Conveying Mains (varies Diameter of D.I Pipes from 100mm to 600mm) – Chennai.
Main Project Feature: 3. The Proposal of Providing Sewerage System to Pallavaram Municipality in 250 Wards covering an extent of 585 Hectares. This will Serve Projected Population of 1, 07,751 in the year 2036. The work involves 3101 No of Manholes at varies depth from 1.5 m to 6 m and collection main pipeline RCC 13960 m and for branch Sewer Main Stoneware Pipeline 75915 m and House Service Connection 48772 m of Stoneware Pipeline.
Activities Performed:
• Involved in Supervision of on-site construction activities to ensure completion of the project within the stipulated time & cost
• Involved in interacting with client & consultants to get their approval at every stage of the activities
• Preparing material & workers forecasting to complete the job scheduled.
• To ensure execution of the project as per specifications of the tender & deviations.
• Involved in adjudication and arbitration contract Claims.
• To ensure execution of the project in accordance with FIDIC, MDB (Multilateral Development Bank) Harmonized Edition for bank financed projects, and MDB Construction Contract.
• To certify bills of subcontractors, effective utilization of manpower, materials, and machineries, take approval of consultant & client’s engineer for the commencement of activities.
• Monitoring worker deployment at fronts.
• Co-ordination with site engineers for execution of construction activities.
• Effective resource utilization to maximize the output. CURRICULAM VITAE
RAJENDRAN S
• Monitoring and control wastage of material on site.
• Coordinating all activities related to the project coordination procedure, including technical documents, drawings and commercial correspondence, constantly liaising with corporate legal experts with regards to the obligation, liability and indemnities under the contract. Date:July 2004 – November 2007
Name of Organization: M/s. Subhash Projects And Marketing Ltd. Position Held: Assistant Manager – Projects
Name of Project: Investigation, Design, Supply, Installation, Testing & Commissioning of Pumping Station, Electrical Substation, Rising Main of 12 KM including Construction of Pump House, Intake Canal & all Civil Structural Work. Excavation of approach Channel Construction of Pump House, Supply and Commissioning of Pumping Machinery to Lift 8.5 TMC, Transformers, sub-stations, Pressure Mains Supply and Layers of Pipelines from Barrage to NTPC Balancing Reservoir. MS Pipeline - 2500MM diameter. Client: Irrigation and CAD- Dept, Andhra Pradesh & Karnataka Neeravari Nigam Limited Source of Funding: Ministry of Irrigation Govt of India Funding Location: Ramagundam,Andhra Pradesh, Gokak Karnataka Main Project Feature: 1. The project envisages providing drinking water for villages along the water distribution channel. A combined effort to supply water for industrial, irrigation and drinking purpose. Supply of 8.50TMC of water from Sripadasagar to NTPC Ramagundum in Karimnagar district, Andhra Pradesh
Main Project Feature: 2. Ramesshwar lift irrigation scheme to irrigate 13,800 hectares of land in drought – prone areas of Gokak, Ramadurg and Saundatti taluks by the supply of 2.20 TMCft water. Supply & Laying of M.S. Pipe 2500 mm diameter at a length of 14 km. Activities Performed:
• Involved in Preparing detailed work program and establish material procurement schedule.
• Preparing monthly outlooks of manpower and material requirements, Reviewing daily work schedule, equipment and manpower requirements, and engineers.
• Reviewing construction drawing, resolve, and discrepancies with engineer consultant.
• Coordinating with consultants and client.
• Monitoring safety performance of all personnel on site and improvements procedure.
• Supervising construction proceeding as per approved plans and drawings, specifications.
• Preparing monthly outlooks of workers and material requirements.
• Effective utilization of Manpower, Materials, and Machineries.
• Set-out benchmarks and hand-over complete information to the Contractors to enable them proceed with the detailed setting out of works. Date:October 2002 – May 2004
Name of Organization: M/s. Habib Ali Awachi & Sons - Kingdom Of Bahrain Position Held: Construction Engineer
Name of Project: Water Supply System & Underground Sewerage & Drainage System for Bahrain International airport Upgrade of Parallel Taxiway Executive cargo apron Works for Bahrain Country Infrastructure Development. Client: Ministry Of Bahrain Water & Electricity Authority Source of Funding: Ministry Of Bahrain Water & Electricity Authority Funding Location: Kingdom of Bahrain
Main Project Feature: Government of Bahrain has proposed to upgrade parallel taxiway executive cargo apron works for Bahrain country infrastructure development. The work comprises Supply & Installation of 12 km of GRP Pipeline with a dia. ranging from 600 mm to 1000 mm dia, depth varies from 1m to 6m and construction of RCC manholes with GRP liner laying and testing of clayware pipes and fixing of road kerbs and footpath works. Valve fixing and construction of valve chambers, construction of irrigation tank (GRP), laying and testing of 110 mm uPVC pipeline with manholes.
Activities Performed:
• Involved in project execution of laying and testing of Clay ware pipes and fixing of road kerbs and footpath works
• Responsible for project execution of laying and testing of 110 mm UPVC pipeline with manholes.
• Reviewing construction drawing and resolve and discrepancies with engineer consultant.
• Responsible for project execution of Valve fixing and construction of valve chambers.
• Responsible for project execution of construction of irrigation tank (GRP).
• Monitoring safety performance of all personnel on site and improvements procedure.
• Controlling the wastage of materials, this should be within the limits specified by the Organization.
• Managing efficient Project Order Execution to ensure strict adherence to quality standards.
• Construction of RCC manholes with GRP liner supervising construction proceeding as per approved plans and drawings, specifications. CURRICULAM VITAE
RAJENDRAN S
Date:August 1998 – September 2002
Name of Organization: M/s. B.Engineers & Builders Ltd Position Held: Project In charge
Name of Project: Interceptor Works for North Mylapore and Ice House Pumping Main and Gravity Main for Ice House – Chennai City River Conservation Project (CCRCP) – Underground Sewerage Scheme). Client: Chennai Metro Water Supply and Sewerage Board Source of Funding: National River Conservation Directorate (NRCD)-India Funding Location: Chennai, Tamil Nadu
Main Project Feature: Government of Tamil Nadu jointly with Ministry of Environment and Forest (National River Conservation Directorate) Government of India under took a comprehensive study examining the cause of pollution of the waterways and its impact on the environment and formulated “Chennai City River Conservation Project.” The project comprises Construction of Underground Sewerage Scheme of Includes 9192mtr of Interceptor Stoneware Pipes (Dia 200 mm to 375mm), Pumping Main PSC Pipes 2950m (Dia 800 mm) and 260 Mtr of RCC pipeline for gravity main, Pumping Station, Pumping main and Gravity Main. Activities Performed:
• Involved in preparing detailed work program and establish material procurement schedule.
• Checking Daily progress report and analysing it for the further improvement.
• Coordinating with internal departments like procurement, design, Process, QC, Stores to completing the project in time,
• Coordinating with consultants and clients.
• RA bills follow up with concern department staff.
• Fixing the target to my subordinates.
• Co- ordination with the different departments to fulfil the Team requirement.
• Reviewing daily work schedule, equipment and manpower requirements, and engineers. Date:June 1996 – July 1998
Name of Organization: M/s. Bhoorathnam & Co
Position Held: Supervisor
Name of Project: The project component included Supply & Laying of 26 km PSC Pipeline with a dia. of 800 mm and 1200 mm along with M.S Fabrication & Gap closing and making thrust block and specials, valves fixing, Valve Chambers and hydraulic testing of pipe line. Client: Chennai Metro Water Supply and Sewerage Board Source of Funding: World Bank Funding
Location: Chennai, Tamil Nadu
Main Project Feature: The project component included Supply & Laying of 26 km PSC Pipeline with a dia. of 800 mm and 1200 mm along with M.S Fabrication & Gap closing and making thrust block and specials, valves fixing, Valve Chambers and hydraulic testing of pipe line. Activities Performed:
• Responsible for project execution of Laying & Testing of Pipeline.
• Coordinate with consultants and clients.
• Daily Labour allocation as per the priority of activities.
• Benchmarks fixing and transferring in accuracy by using automatic levelling instrument. Total Experience in Water Supply, 24X7 & Waste Water Scheme more than 24 Years Sr.No
Position Held
Name of Organization
Period
Assignment
Period
1 Project Manager RG Industries March 2020 Present On Going 2 Construction Manager AECOM India Pvt. Ltd January 2017 December 2019 36 Months 3 Project Manager M/s. Ravi Associates May 2010 December2016 80 Months 4 Deputy Manager M/s. IVRCL Infrastructure & Projects Ltd March 2008 April 2010 26 Months 5 Assistant Manager M/s. Subhash Projects And Marketing Ltd July 2004 November 2007 41 Months 6 Construction Engineer M/s. Habib Ali Awachi & Sons - Kingdom Of Bahrain October 2002 May 2004 20 Months 7 Project In charge M/s. B.Engineers & Builders Ltd August 1998 September2002 53 Months 8 Supervisor M/s. Bhoorathnam & Co June 1996 July 1998 25 Months