Post Job Free

Resume

Sign in

Manager Project

Location:
Milford, CT
Salary:
155,000 - 175,000
Posted:
July 22, 2020

Contact this candidate

Resume:

Page * of *

Philip W. Giegengack

** ******** ****** *******, ** 06460 203-***-**** adery3@r.postjobfree.com Objective

To obtain a position as a senior construction manager in a well-regarded construction management or real estate development firm.

Education

Master of Real Estate Georgetown University September 2018

· Real Estate Development

Bachelor of Arts Saint Louis University May 2005

· Major: History

· Major: International Studies

· Related Coursework: The Beijing Center Beijing, China – Study Abroad Skills & Abilities

Project Management – Experienced and results driven construction manager. Solution oriented and able to overcome difficult logistical and technical challenges. Leadership – Proven leadership ability. Able to accomplish goals through the effective management of other professionals. Leads by example.

Communication – Adept in verbal and written communication. Relationship Oriented – Maintains professional relationships with all members of a project team. Negotiations and Claim Resolution – Able to identify common ground and to negotiate mutually acceptable outcomes based on shared interests.

Scheduling – Skilled in critical path analysis and scheduling. Experience

Senior Project Manager Cauldwell Wingate Company June 2018 – May 2020 Managed a multiple phase lobby, corridor, and façade project to reposition a Park Avenue commercial property. This project included the improvement of a plaza, the expansion of the building’s Park Avenue lobby, the renovation of the lobby on Lexington Avenue, the replacement of two escalators, the modernization of thirty-five elevators, and five elevator lobbies. The project was situated directly above and required extensive coordination with the Metro North Railroad. Senior Project Manager Building and Land Technology April 2017 – June 2018 Managed the successful completion of large mixed-use development that consisted of two five story buildings with amenities space constructed on a multi-level podium parking structure, the renovation of existing commercial office spaces, and a boat storage facility. This project included all site infrastructure, utilities, roads, sidewalks, parking lots, dredging, docks, dock fire protection, a boat lift, and a bulkhead along a navigable channel.

Project Manager AP Construction June 2014 – April 2017 Managed the successful completion of a seven-story hospital office building and cancer center. This multiple phase project included the demolition of an apartment building adjacent to an occupied outpatient treatment facility, major façade modifications, and interior improvements to an occupied cancer treatment center and the construction of a new hospital office building. Managed the successful repositioning of three core commercial office buildings and an addition and a renovation to a country club in Greenwich, Connecticut.

Page 2 of 5

Philip W. Giegengack

98 Hillside Avenue Milford, CT 06460 203-***-**** adery3@r.postjobfree.com Project Manager ACC Construction April 2013 – May 2014 Managed the successful completion of projects for SL Green at 100 Church Street. This project included the renovation of a building lobby, and upgrades to more than one thousand offices and open office areas on five floors for the property’s anchor tenant. Project Manager Cauldwell Wingate Company May 2009 – April 2013 Managed the successful completion of multiple hospital renovation projects at New York Presbyterian Hospital and Columbia University. Managed the successful completion several tenant improvements for commercial clients. Managed the successful completion of a historic restoration of Thurgood Marshall US Federal Courthouse for the General Services Administration.

Assistant Project Manager CB&E Construction Group April 2008 – May 2009 Assisted in the management of hospitality projects including restaurants, hotels, independent living facilities, skilled nursing facilities and a collegiate baseball field including grandstands, dugouts, a concession area, and a press box.

Page 3 of 5

Philip W. Giegengack – Project List

98 Hillside Avenue Milford, CT 06460 203-***-**** adery3@r.postjobfree.com Below please find a short list of some of the construction projects I have worked on over the past twelve years. I believe this list will demonstrate a diversity of experience that has helped me to be successful in my role as a construction manager.

Delmar Garden Villas of O’Fallon, Missouri – This 164 unit independent living community encompassed more than 170,000 square feet, and included amenities spaces such as a library, a bowling alley, a movie theater, a large water feature, and indoor and outdoor swimming pools. This project is valued at

$33,000,000.00

Delmar Garden Skilled Care of O’Fallon, Missouri – This addition to an existing and occupied skilled nursing facility added 120 beds and almost 60,000 square feet of space. This project is valued at

$11,000,000.00.

Hyatt Place Hotel of Salt Lake City, Utah – This 123 key hotel was built for the Corporex Corporation of Covington, Kentucky and is one of the latest designs of the Hyatt flag. This project is valued at

$10,500,000.00.

Aloft Hotel of Phoenix, Arizona – This 143 key hotel was built for the Corporex Corporation of Covington Kentucky and is one of the most recent designs of the Starwood flag. This project is valued at $11,000,000.00.

The Wingate Inn of Weldon Springs, Missouri – This 120 key business class hotel overlooks the Missouri Bluffs golf course and is situated close to the Katy bike trail which spans the state, and passes through some of the area’s best known vineyards and wineries. This project is valued at $10,000,000.00. The Marriott at Saint Louis Union Station – This 200 key reflag of a Hyatt Hotel included the conversion retail shopping mall space into Class A conference room space, which established the Marriott at Saint Louis Union Station as a premier destination for corporate retreats, wedding receptions and other large events requiring substantial meeting venues. The renovation of this historic national landmark included the magnificent 65 foot barrel vaulted Grand Hall. This project is valued at $20,000,000.00. UMSL Baseball Facility – This new athletic facility, located on the campuses of the University of Missouri Saint Louis, demonstrates the university’s ongoing support for its athletics program which compliments the school’s longstanding commitment to provide a quality public education and a rigorous course of study. This project is valued at $2,000,000.00.

The Thurgood Marshall US Courthouse – Consisting of more than 30 floors and 750,000 square feet of space this landmark federal courthouse, located in downtown Manhattan, underwent a historic two- phase complete renovation and infrastructure upgrade. This project is valued in excess of

$314,000,000.00.

New York Presbyterian Hospital – Spect CT – This interior renovation project will create a new nuclear camera procedure room, an exam suite, and inpatient, outpatient, and reception areas. This imaging facility will serve the patients receiving care from one of the best ranked hospitals in the United States. This project is valued at $2,400,000.00.

New York Presbyterian Hospital – Pediatric Cardiology – This interior renovation project will create a new echo cardiogram and exam room suite where children from around the country will receive treatment for life threatening conditions by some of the best cardiologists, nurses, and medical professionals. This project is valued at $3,100,000.00. Page 4 of 5

Philip W. Giegengack – Project List

98 Hillside Avenue Milford, CT 06460 203-***-**** adery3@r.postjobfree.com New York Presbyterian Hospital – Transplant Outpatient Center – This interior renovation project will create a new counseling center for patients who will be or may be receiving life sustaining organ transplants. This project consists of 3 phases and is valued at $4,400,000.00. New York Presbyterian Hospital – Atrium and Hospitality Suites – This design build interior renovation project will create a new amenities space in the hospital’s most select suites. This project is valued at

$1,200,000.00.

New York Presbyterian Hospital – Heart Center (Cath Lab K) – This interior renovation project will create a new catheterization lab that will treat a high daily volume of patients. Ultimately this project will create a facility that will save and prolong countless lives. This project is valued $1,150,000.00. 1412 Broadway – 7th

Floor Corridors/Core Bathrooms and Provident Bank Fit Out – This interior renovation project and tenant fit out created a foothold for Provident Bank in midtown Manhattan. The space will include a reception area, conference rooms, offices, and pantries that will feature a variety of architectural finishes. This project is valued at $1,000,000.00. 380 Lexington Avenue – 34th

Floor Pre-build – This interior renovation project and tenant fit out will provide the building owner/manager with a renovated space that which will be used to secure a new tenant and lease agreement. This space will include a reception area, conference rooms, offices, pantries, and restrooms. This project is valued at $1,000,000.00. 16 East 35th

Street – Church Pension Group – This interior renovation project included a complete MEPS building infrastructure upgrade as well as a wide variety of architectural finishes ranging from vaulted ceilings to an extensive trim and millwork package, and lighting control systems. The project consisted of more than 100,000 square feet over five floors and is valued at more than $40,000,000.00. 100 Church Street – SL Green Landlord Upgrades and Tenant Refresh Project – This interior renovation project included a new training area with advanced AV and Tel/Data infrastructure upgrades, mechanical upgrades to a critical IT center, and upgrades to architectural finishes in more than one thousand offices, corridors, and open office areas on six floors. This work also included electrical distribution. upgrades and ADA upgrades to the building’s core bathrooms and lobby. This project consisted of more than 300,000 square feet over six floors and is valued at more than $9,000,000.00. White Plains Hospital – Cancer Center – This addition to an existing and occupied cancer treatment center added exam rooms, offices, conference rooms, and amenities space. This project included the abatement and demolition of an apartment building and the construction of a new hospital office building as well as numerous upgrades to the existing cancer center. This project is valued at more than $40,000,000.00.

Pickwick Plaza - Owner Upgrades - This repositioning of three commercial office buildings included lobby renovations, new entrances, corridor, elevator lobby and core bathroom upgrades. This project is valued at more than $6,350,000.00.

Fairview Country Club – This addition to an existing building included a dining and amenities plaza and the renovation of the lower level locker rooms and adjacent corridors as well as the main level which included the addition of a new commercial kitchen, bar, banquet hall, dining area, main entrance and adjacent corridors and offices. This project is valued at more than $10,000,000.00. Page 5 of 5

Philip W. Giegengack – Project List

98 Hillside Avenue Milford, CT 06460 203-***-**** adery3@r.postjobfree.com Harbor Landing - Apartment Buildings – This development included all necessary site infrastructures and the construction of five hundred feet of bulkhead along a navigable channel. The project consisted of two four story multi-family apartment buildings constructed above a shared parking structure and included interior and exterior amenities space in and around both buildings. This project is valued at more than $50,000,000.00.

Hinckley Yacht Services – Boat Storage Building – This project included an engineered building with racks for the interior storage of boats. It also included docks, a retail space, amenities space, a boat lift, and refueling facilities. This project is valued at more than $3,000,000.00. 277 Park Avenue – Lobby and Façade Renovation – This multi-phased project includes the expansion of the building’s Park Avenue lobby, the improvement of the adjacent plaza, and the replacement building’s Lexington Avenue lobby. The project also includes the modernization of thirty-five elevators, two escalators, and two handicapped accessible lifts. This project is valued at more than

$110,000,000.00.



Contact this candidate