CHINMAYEE. B
****************@*****.***
Hyderabad, India 979*******
OBJECTIVE:
Actively seeking full time position with a comprehensive knowledge of automotive communication protocols, automotive compatible microcontrollers to develop automotive ECU's, components and leverage organizational and research skills to prepare for an All-Electric future PROFESSIONAL EXPERIENCE:
Brakes India Private Limited, Chennai, India July 2018 - Present Customer Application Engineer, Hardware Engineer
Responsibilities:
Interface with customers (TML, SML, FML, VECVL, MTBD) to get design inputs
Translate design requirements into design outputs for in-house developed projects, verify adequacy of existing design and modify, if required
Support customer for mating harness finalization
Coordinate and support SDI/ MSE/ NP/ Marketing/ QA/ Manufacturing units for product development
Provide support to Vehicle Development Team for carrying out ABS validation
Obtain subjective sign-off from internal and external customers for carrying out validation in vehicle
Support customer for vehicle level homologation testing of products
Support production unit for flashing of EHCU's in vehicle or bench before dispatch to customer
Support customer for Assembly Line Trials - E&F, EOL
Prepare Risk Analysis, TGW, TGR documents
Prepare and manage project files to meet IATF16949 requirements
Support customer/ service/ QA for field and line issues
Review and adhere to new product development to meet timeline commitments in design and development activities
Prepare product development reports
Projects:
Development of Wheel Speed Sensor (WSS) testing kit for Assembly line check
Identify various faults in the WSS and display the type of fault on LCD
Develop hardware and software for detecting the type of WSS fault
Provide audible and visual alerts for WSS Pass/ Fail indication
Deploy the box at Assembly line and Customer end for any failure check Development and Installation of Wiring harness for ABS Calibration of Proto vehicles
Develop the wiring harness according to the length of the vehicle
Install and route the wiring harness on the vehicle and interconnect the wiring harness, MIL controller, Malfunction Indicator Lamps and other signals required by the ABS ECU.
Verify signals, nearness of Wheel speed values and vehicle speed using the DMX logger Preparation of ECU schematic for 2 Wheeler ABS (2WABS) development
Soldering TH (Through Hole), SM (Surface Mount) components for motor driver development, testing various motor faults
Preparation of ECU schematic for 2WABS development using Altium Designer and BOM release Installation of Mobileye procured ADAS in Fleet Management Company trucks, trailers and SUV's
Mobileye 630 product installation in SUV's, Sedans and Mobileye Shield + product installation in trucks, trailers and buses.
Main camera, rear camera installation and calibration using TAC board, Blind spot detection and main camera displays installation for visual and audio alerts
Modification of Mobileye alert sound using an external serial mp3 player, PAM 8403 amplifier, 2W speakers and Arduino to provide non-irritable sounds. Development of hardware and software for the above.
EDUCATION:
Bachelor of Technology in Electrical and Electronics Engineering CGPA: 8.2/10 SASTRA Deemed To be University, Thanjavur, India
April, 2018.
Relevant Course work: Electronic Devices and Circuits, Digital Electronics, Microprocessor and Microcontrollers, Signals and Systems, Electrical Machines, Power Electronics Intermediate SCORE: 976/1000
Narayana Junior College, Hyderabad, India
April, 2014
High School CGPA: 10/10
Sri Sathya Sai Higher Secondary School, Puttaparthi, India April, 2012
CURRICULUM PROJECTS:
Analysis of Partial discharge (PD) characteristics of liquid insulation in a transformer under forced circulation using closed loop control system
PD data is obtained and sent to a logic circuit, where the PD data are analysed.
If the data acquired indicates a high PD value, it sends out a signal to a control circuit connected with the electrical pump.
This control circuit will regulate the speed of the electrical pump based on the logic circuit’s output, which will further optimize the flow of oil inside the tank.
This will partially relieve the stressed portion of insulation by dispersing the impurities thereby regulating the intensity of PD. Circulation of liquid insulation leads to the reduction of PD in the transformer.
TECHNICAL SKILLS:
Communication Protocols CAN, CAN FD, UDS, LIN, SPI, UART, RS 232 Circuit Design Software Altium Designer, Orcad, Multisim Tools & Technologies MATLAB, MS Office, MPP
Programming Languages Basics of C, C++, JAVA, Python SOLITARY INFORMATION :
Date Of Birth : 15-May-1996
Father's Name : B. Kishan Rao
Mother's Name : B. Sandya
Address : Plot No : 187, Behind People's Sanjeevani Hospital, B.N.Reddy Nagar, Hyderabad, Telangana, 500070
Languages Known : English (Read, Write, Speak), Hindi (Read, Write, Speak), Telugu (Speak)