Post Job Free

Resume

Sign in

Maintenance Manager / Production Manager

Location:
Dasmarinas, Cavite, Philippines
Posted:
July 20, 2020

Contact this candidate

Resume:

Position Applied : Maintenance Manager / Production Manager

Jose A. Nolasco II

Address: Blk#17 Lot#15 Villa Luisa Homes Dasmarinas, Cavite

Land Line #: (046-***-****

Cell phone #: 095******** / 094********

Email: adeqht@r.postjobfree.com

Career Summary:

•Started as full-time Maintenance Technician for almost 5 years, Technical experiences are mainly in an electronic/semiconductor Industries. Handled Blow-Molding /PET Injection, Wire Bonder, Die Attach, Burn-In Oven, Tester Handler machines during my Line Maintenance Technician years.

•Senior Production Supervisor for 2-years handling Final Test Operations with Intel Technology Philippines and ON Semiconductor Philippines.

•Maintenance Supervisor for 13 years (5 years at Intel Philippines) handling assembly FOL-EOL from Die Preparation, Die Attach, Wire Bond, Mold, Laser Mark, Ball Attach, Ink Mark, Saw Singulation, Auto-Fold and Auto-Stacking machines. Likewise, Handled Final Test – Mechanical Finish from Burn-In Oven, Tester/Prober, Handler and Tape & Reel machines.

•Engineering Assistant Manager for over 1 year handling Camera Module’s Assembly and Test Equipment, ensuring Assembly and Test Machines are running 24/7 to meet the target production requirement.

•Maintenance Head for over 1 year managing both facilities and production machineries to ensure target KPI’s are being met through scheduled monthly machine Preventive Maintenance and 24/7 Production Line Sustaining activities. Likewise In-charge of QMS maintenance document manual such as operating procedures, work instructions and other maintenance process flows. Experience includes bunker boiler and waste water operations.

Work Experiences:

Date: November 04, 2019 – March 31, 2020

Position: Maintenance Manager

Company: Ferna Food Corporation

Department: Maintenance Department

Manages maintenance department of two sister companies (Purechem and Ferna Food Corporation) handling building facilities, production equipment and waste water treatment. Maintenance covers monthly Preventive Maintenance (PM) of Facilities and Production Equipment including line sustaining activities to ensure production is running 24/6 every week with-out major facilities and machines issue impacting production KPIs. Production machines are 500Kg-1 Toner Ribbon Blender, Pulverizer, X-ray, Metal Detector, Vertical Packing, Box Closer, Auto Capping, Auto Sealer and Ink Jet Printer machines.

Main KPIs are hitting target Machine Utilization (MU), 100% execution of scheduled machine Preventive Maintenance, zero quality issue brought by equipment and zero safety issue with regards to facilities and machine safety.

Date: April 22, 2019 – October 18, 2019

Position: Field Service Engineer (FSE)

Company: Global Engineering Services (GES) Saigon High Tech Park, Ho Chi Minh, Vietnam

Department: Engineering - Supporting ST Micro Electronics LSP Calamba

Field Service Engineer for Optical Wafer Sort (OWS) equipment which is a combination of a Tester and Robot Arm-Loader machines. Main tasks are to do machine characterization and qualification for production readiness. Other activities include machine software, electrical and mechanical upgrades for new device/product readiness. Supports production DOE’s, machine repair, Preventive Maintenance (PM) and production personnel machine trainings

Date: August 09, 2018 – April 18, 2019

Position: Final Test Sr. Production Supervisor (Regular Employee)

Company: ON Semiconductor Philippines (OSPI Carmona)

Department: Final Test Manufacturing Department

Job Function:

Handling Digital Line consisting of 70 production personnel. Main objective is to hit daily target OEE on Teradyne J750 / A510 /A520, Trillium, Synchro, Maverick and TMT Testers. Develops production operators’ competency through machine operation cross-training and coaching through regular 1-on-1 meeting. Regularly attends to daily operations meeting for weekly target delivery (planned volume & line item products) status. Coordinates needed support from Engineering on machines not meeting the target OEE for tactical and strategic machine improvement projects and even escalates needed help from other support groups.

Date: December 12, 2016 – August 07, 2018

Position: Senior Production Supervisor (Regular Employee)

Company: Collins Aerospace Philippines (formerly known as B/E Aerospace Phils.)

Department: Advanced Lavatory and Cabin Interior (ALCI)

Job Function:

Manages P1/P2 Lines (60 production personnel), responsible for panel fabrication from raw material preparation (Panel Mold Press), CNC machine panel cutting (5-axis/3-axis) and panel preparation (bonding, potting, edge-filling, sanding and painting) for final Lavatory assembly line readiness. Responsibility includes process and yield improvement for Over-all Equipment Efficiency (OEE). Develops personnel’s competency through cross-training to other processes for their over-all productivity.

Date: August 08, 2014 – December 09, 2016

Position: Final Test Line Sustaining Maintenance Supervisor (Regular Employee)

Company: ON Semiconductor Philippines (OSPI Tarlac)

Department: Final Test Manufacturing Department

Job Function:

Handling QFP Final Test Line Sustaining Group (LSG) composed of Tester, Handler and Set-up Technicians. Responsible for production machine line sustaining activities such as repair/troubleshooting of Teradyne J750/ Advantest T7323/ Yokogawa TS2000 Testers, Epson Handlers and Burn-In Ovens. Main objective is to hit daily Over-all Equipment Efficiency (OEE). Responsibility includes driving Continuous Improvement Projects (CIP), technical skills competency improvement of all Line Sustaining Technicians. Regularly attends to Daily Operations (Daily OPS) meeting for closure of any machine related issue that will hamper operations’ performance.

Date: May 04, 2013 – August 04, 2014

Position: Equipment Maintenance Asst. Manager (Regular Employee)

Company: Nanos Technology Electronics Corp., Carmelray Industrial Park II Calamba Laguna

Department: Engineering Department

Job Function:

Directly reports to a Korean Plant Manager. In-charge of "Camera Module" assembly and test equipment production line sustaining activities such as machine repair, preventive maintenance, spare parts management, machine/jig improvement and equipment operation trainings to all production operators. Assembly equipment includes direct material cleaning equipment, Die Preparation, Plasma, Die Attach, Curing Oven, Wire Bond and Housing Attach. Test equipment includes Singulation, Auto Soldering, Auto Focusing, Final Test, Ink Marking, Tape Attach and Vacuum Seal machines. Critical Success Indicators (CSI) is machine uptime and over-all machine efficiency/utilization.

Date: August 22, 2011 – February 28, 2013

Position: Senior Engineering Supervisor (Regular Employee)

Company: Optis Philippines, Incorporated, Carmelray Industrial Park II Calamba Laguna

Department: Engineering Department

Job Function:

Directly reports to a Korean Engineering Manager. Supervises a group Production Engineers whose main task is to ensure smooth assembly operation of “Optical Pick-UP” by performing daily calibration / mastering of all assembly machines including its’ Jigs and Fixtures. Responsibility includes machine and jig/fixture improvements including maintaining the over-all machine uptime indicator. Leads engineering quality task force (TF) and safety management by walking around (SMBWA) Audit.

Date: June 21, 2010 – March 31, 2011 (Regular Employee)

Position: Maintenance Supervisor

Company: PCI Worldwide Inc., Mount View Industrial Complex Carmona Cavite

Department: Maintenance Department

Job Function:

Manages Maintenance section composed of electricians, mechanics, welders and boiler operators. Responsible for ensuring a-well maintained equipment and plant facilities including over-all planning and implementation of engineering activities for line productivity, quality and safety. Responsibility includes Preventive Maintenance (PM) planning / scheduling of all production equipment up to Boiler Operations and Waste Water Treatment Facilities. Handles maintenance section’s document manual for ISO Audit readiness on preventive maintenance procedures and machine operating instructions.

Date: January 2001 – March 31, 2006 (availed V.S.P. / Early Retirement)

Position: FOL-EOL Maintenance Supervisor

Company: Intel Technology Philippines Inc., Gateway Business Park Gen. Trias Cavite

Department: FLASH - Process and Equipment Engineering Department

Job Function:

Manages a group of Line Sustaining Technicians that will ensure a safe, well maintained and effectively utilized process and equipment modules. Handles Front-Of-Line (FOL) and End-Of-Line (EOL) assembly lines from Die Preparation, Die Attach, Wire Bond, Mold, Laser Mark, Ball Attach, Ink Mark, Saw Singulation, Auto-Fold and Auto-Stacking machines. Plans daily line sustaining activities to ensure daily production targets are met. Implements continuous improvement projects including Technician’s competencies to have efficient Line Sustaining activities. Attends daily operations meetings (Daily Ops, Delivery Watch, and Game Plan) to coordinate needed help/problem including recovery plans as well as needed external support.

Date: December 1999 – December 2000

Position: Production Supervisor

Company: Intel Technology Philippines Inc., Gateway Business Park Gen. Trias Cavite

Department: Flip Chip – Manufacturing Department

Job Function:

Manages a group of Final Test production operators. Regularly checks machine performance and productivity with the goal of hitting the daily target Machine Utilization (MU). Supervisor is also responsible for ensuring a well-supported production in terms of manpower and other direct and In-direct materials to be used in the operations. Likewise, responsible for escalating problems to management by attending daily operations meetings (Daily Ops, Delivery Watch, and Game Plan) to coordinate needed support including recovery plans as well as needed external support.

Date: March 25, 1996 – November 1999

Position: Assembly / Test Line Sustaining Technician

Company: Intel Technology Philippines Inc., Gateway Business Park Gen. Trias Cavite

Department: Flip Chip/CMO - Process and Equipment Engineering Department

Job Function:

Handles KnS1488 Wire Bonder, KnS SP2100 Lead Bonder, ESEC Die Attach, Schlumberger BLU/NGH & Burn-In Criteria 18 Ovens. Production Line Technician is responsible for maintaining equipment optimum performance through repair and troubleshooting including Preventive Maintenance (PM) activities of FOL/EOL equipment. Regularly performs area 5S/housekeeping, practices safety and proper pass down to next shift. Supports Engineering activities for process and equipment improvements in terms of Safety, Quality and Productivity including Cost. Hitting equipment MU, MTTA, MTTR and Process Yield goals are the critical success indicators.

Date: June 23, 1995 – November 27, 1995

Position: Jigs and Fixtures Technician (Contractual Employee)

Company: Uniden Philippines, Inc. FTI Complex Taguig City

Department: Industrial Engineering Department

Job Function:

Jigs and Fixtures Technician is responsible for in-house fabrication, repair and maintenance of all types of device testing jigs and fixtures for beeper, cell phone, two-way radio and scanner devices (Mechanical, Electrical & Electronic wiring Installations) for total production efficiency. Handled CAD PCB Drilling machine, Surface Grinder, Lathe machine and Milling machine for Jigs and Fixtures fabrication.

Date: April 26, 1993 – March 31, 1995

Position: Maintenance/Facilities Technician (Contractual Employee)

Company: IPI Blossomer Plastic Corporation, Libis Quezon City

Department: Engineering Department

Job Function:

Responsible for production equipment Preventive Maintenance (PM) and repair/troubleshooting activities of Blow-Molding / Injection Machines with the goal of hitting equipment target capacity with total quality. Maintenance includes its facilities such as chillers, trimmer motors, air compressors, building wiring and lighting fixtures.

Educational Background:

Tertiary:

Course: Bachelor of Science in Engineering Technology (BSET), Major in Electrical Technology

Technological University of the Philippines – Visayas

Talisay City, Negros Occidental

Course: Industrial Electrical Technology

3-Year Full Scholarship Program, Industrial Technician Course

Meralco Foundation Institute – Pasig City

Secondary:

University of Rizal System – Morong Rizal

Primary:

San Guillermo Elementary School – Morong Rizal

Trainings/Seminars Attended:

Equipment Trainings / Seminars:

Refrigeration and Air-conditioning – April 1992, Meralco Foundation Institute

Pneumatic Maintenance and Troubleshooting – February 1997, FESTO Philippines

KnS SP2100 Tape Automated Lead Bonder Operations and Maintenance – March 1996, Intel Phils.

Schlumberger BLU 100 Operations and Maintenance – September 1998, Intel Phils.

Criteria 18 Burn-In Oven Operations and Maintenance – October 1998, Intel Phils.

LKT Laser Marking Operations and Maintenance – February 2005, Intel Phils.

Evertech FJ1000 Auto Folding Operations and Maintenance – July 2005, Intel Phils.

MIT IPS100 Ink Marking Operations and Maintenance – January 2005, Intel Phils.

Quality Tools (Training at Intel Technology Phils.):

Vista for ATM – January 21, 2005

Technical Structured Problem Solving – December 5, 2003

EATS Training – November 12, 2003

Change Management – October 22, 2003

Disposition Management – October 22, 2003

Statistics 101 – October 13-23, 2003

FMEA Methodology – September 17, 2003

ISO 9001:2000 Overview – February 19, 2002

ISO 9001:2000 Auditor Update – February 19, 2002

Commonality Analysis – February 5, 2002

E-Speed Internal Audit Tool – September 27, 2001

Manufacturing 101 –October 23-27, 2000

ETM/ETS Simulation Training – June 28-29, 2000

Engineering 101- April 10-14- 2000

Technical Report Writing - December 8, 1998

Intro to JMP – October 15, 1998

Design of Experiment – October 6-10, 1997

Process and Equipment Development Guide – July 25, 1997

Yield Engineering Development Guide - July 15, 1997

Intel Assembly/Test Technology – November 8, 1996

Basic Statistics and Graphics – September 2, 1996

7-Step Problem Solving – August 27, 1996

Basic Quality Tools – August 27, 1996

Control Charts – August 20, 1996

Failure Mode and Effect Analysis – August 7, 1996

ISO9000 Orientation – April 24, 1996

Personal Development Trainings (Trainings at Intel Technology Phils.):

Code of Conduct – September 22, 2005

Discipline and Discharge – November 20, 2003

Project: Countdown – November 18, 2003

ATM, Autonomous Maintenance – July 21, 2003

ATM, TPM Fundamentals – July 21, 2003

4K Work Shop – July 24, 2002

Focal Made Simple – July 9, 2002

Open Door Initiative – January 13, 2002

Managing Through People – June 25, 2001

Survey of Management Practices – June 20, 2001

Managing at Intel Workshop – May 25, 2001

Self-Performance management– March 22, 2001

Filipino Values– August 9, 2000

7-Habits of Highly Effective People– July 24-26, 2000

Managing Poor Performance – June 21, 2000

Writing Effective Review – February 15, 2000

Delivering Tough Messages - March 03, 1998

Effective Meetings – August 8, 1996

Performance Appraisal – March 28, 1996

Constructive Confrontation– March 26, 1996

Personal Development Trainings (Trainings at Optis Phils. Inc.):

Managerial Effectiveness – December 10, 2011

Strategic Planning – February 18, 2012

Total Productive Maintenance – March 5, 2012

Coaching and Counseling – April 28, 2012

Safety Trainings (Training at Intel Technology Phils.):

Drug Abuse in the Workplace – January 18, 2005

Advanced Electrical Safety – January 13, 2005

Manager Safety Training – September 26, 2003

Hazardous Waste Handling & Storage– August 15, 2003

Incident and Injury Free – July 16, 2002

COHE-Periodic Inspection– September 18, 2001

Energized Electrical Work– June 20, 2001

Waste Management– May 31, 2000

Self-Ergonomics– January 14, 2000

Inert Gases/Cryogen Hazard – October 7, 1999

Nitrogen Safety Orientation – April 30, 1999

Control of Hazardous Energies –September 4, 1997

Intermediate Electrical Safety– September 4, 1997

Basic Electrical Safety – September 4, 1997

Hazardous Compound– August 26, 1996

Safety Management by Walking Around – August 1, 1996

Safety Orientation – March 28, 1996

Personal Profile:

Name: Jose A. Nolasco II

Status: Married

Age: 47

Birthday: November 11, 1972

Birthplace: Mercedes, Poro Cebu

Nationality: Filipino

Religion: I.N.C.

Applicant’s Signature



Contact this candidate