Post Job Free
Sign in

Manager Project

Location:
Amarillo, TX
Posted:
July 19, 2020

Contact this candidate

Resume:

WWIILLLLIIAA

MM VV .SS

CCHHIILLLLEE

RR

**** ***** *****, ********, ***** 79119 512-***-**** ********@*****.*** 1 P a g e

QUALIFICATIONS PROFILE

Methodical, performance-focused, and analytical professional with comprehensive experience in business analysis and administration, material and cable management, and staff supervision. Armed with outstanding project management expertise in accomplishing small- to large-scale projects with focus on quality assurance and adherence to budget and time constraints to ensure achievement of project goals and objectives. Years of experience with Fiber/Telecom Construction of ISP & OSP plant environments. Adept at maintaining efficient operations through strict implementation of safety measures, company policies, and industry standards. Proficient with Microsoft Office Suite, Power Point & Google Earth. Articulate communicator with basic knowledge of Spanish. CORE COMPETENCIES

Systems Design and Implementation

Strategic Planning and Analysis

Root Cause Assessment

Product Management and Development

Information System Administration

Project and Program Development

Rapid Conflict Resolution

Quality Assurance and Material Control

PROFESSIONAL EXPERIENCE

ENERGY INSPECTION SERVICES (EIS) – WEST TEXAS, DELAWARE BASIN Utility Fiber/Communications Inspector 2018–2020

Keenly assed contractors technical and project daily performance.

Assed electronic installations of switches, routers, PDU’s and UPS’s.

Submittal of Encroachment permits for work being performed within ROW.

Coordinated efforts with internal OSP engineers and Contractors.

Interacted with Oxy Highline Management Team for project progressive updates, RFI’s and final project sign-off/close out packages.

Accomplish all projects in line with company policies, procedures, and industry-recognized standards.

Presided over Health and Safety Executive (HSE) on all Aerial/ OSP fiber projects. MMR GROUP – LAKE CHARLES, LA

Materials Manager, SASOL Mega Chemical Project 2017–2018

Create and implement a storage logistic process for indoor and outdoor stored equipment materials.

Take charge of evaluating materials onsite consumption, presenting reorder points, and submitting new orders through proper channels.

Administer onsite material deliveries, staging, and stocking, as well as the project-specific onsite logistics plan for material receipt, storage, and distribution.

Handle project-specific material delivery schedules in collaboration with site management staff.

Effectively supervised the materials team members, which resulted to zero lost time based on injury and property damage.

JC COMMUNICATIONS – AUSTIN, TX

Fiber Splicing Division Manager 2015–2017

Provided annual employee evaluations and consultation to help technician and foreman on their career goals setting and achievement.

Administered all fiber optic splicing and testing activities for the emergency response teams; weekly progressive project invoicing, and regular work packages.

Conceptualized and employed procedures for time tracking, work orders, tool room recordkeeping, and daily equipment and vehicle inspections.

Expertly managed entire general maintenance for fleet of splice trailers, bucket trucks, splicing machines, optical time-domain reflectometers (OTDRs), and test equipment.

Drove key efforts in maintaining a zero lost time injury safety record. WWIILLLLIIAA

MM VV .SS

CCHHIILLLLEE

RR

6011 NANCY ELLEN, AMARILLO, TEXAS 79119 512-***-**** ********@*****.*** 2 P a g e

OCI ORASCOM – WEVER, IA

Material Control Coordinator, IOWA Fertilizer 2014–2015

Assigned material control for all areas within the project, while controlling material usage in line with bill of material and actual build.

Demonstrated expertise in accomplishing wide-ranging duties:

- Arrangement and submission of structured reports to area managers on all areas of construction;

- Discussion of all issues regarding construction continuity;

- Operation of failed quality components containment;

- Control of material activity through supplier activity monitoring; and

- Administration of stock reconciliation and subsequent stock adjustment.

Observed strict compliance of material control with set-forth company budgets and objectives.

Coordinated with the Purchasing and Planning Team in guaranteeing materials meet demand for construction.

Procured miscellaneous structural HDWR and various piping materials. ON AIR SOLUTIONS – HOUSTON, TX

Sr. Project Manager 2012–2014

Conceptualized head-end layout comprised of racks, cabinets, RRUs, and equipment frames.

Project manager, in charge of all fiber optic splicing, terminations and testing.

Configured electrical circuits to power plants; provisioned distributed antenna system (DAS) and base transceiver station (BTS) cellular system; and installed -48 circuits for RRUs, DIU, and BTS.

Oversaw large installations with coaxial and fiber-based system from DAS head-end, base stations, and antennas.

KBR, CHEVRON EGTL LNG GAS PLANT – ESCRAVOS, NIGERIA Cable Management Supervisor 2009–2012

Facilitated regular inspections on rotating cable drums; monthly walk down inspections on specific areas and ensuring the compliance towards safety procedures and processes.

Worked collaboratively with client and contractors on cable schedule and materials, as well as with material transfer within Warri Port and EGTL Site.

Co-managed offloading of materials from barges and liners, including laydown areas prior to shipping.

Participated in construction discipline meetings in deliberating material issues and material updates.

Carried out administrative duties, including implementation of spreadsheet for shipping schedules, generation of cable trending reports.

Teamed up with electrical supervisors, engineers, and the Maintenance Department with construction drawings for effective validation of material specifications availability from national and international vendors. EARLIER CAREER

CABLE COM, INC. – AUSTIN, TX

Director of Operations

MATSON BUILDERS – AUSTIN, TX

Senior Project Manager

COLCOM, INC. – AUSTIN, TX

Sales Consultant Project Manager

CABLE COM, INC. – AUSTIN, TX

Project Manager Technician

PROFESSIONAL DEVELOPMENT

On Air

Solutions

Safety and Environmental Management System OSHA10 General Industry Safety and Health DuPont’s Safety Training and Observation Program Hazard Identification KBR International Property Measurement Standards (IPMS) – Asset/Inventory Management WWIILLLLIIAA

MM VV .SS

CCHHIILLLLEE

RR

6011 NANCY ELLEN, AMARILLO, TEXAS 79119 512-***-**** ********@*****.*** 3 P a g e

Total Safety Task Observation (TSTO) Cable Management Database (CARDS) Business Code of Conduct Personal Development and Management Dynamics of Time Management Total Safety Task Instruction (TSTI) Transportation Worker Identification Credential (TWIC) OXY LiveSafe



Contact this candidate