Post Job Free
Sign in

Engineer Engineering

Location:
Medan, North Sumatra, Indonesia
Posted:
July 18, 2020

Contact this candidate

Resume:

PERSONAL DETAILS

Name : Suryantoro, ST

Marital Status : Married

Sex : Laki-Laki

Nationality : Indonesia

Religion : Islam

Email : *****.**********@*****.***

Residential Address : Mutihan RT/RW 05 Wates Kulonprogo Yogyakarta.

Telephone : 081*********

JOB EXPERIENCE

1 JANUARY 2019 – until now

Employer: Facility Representative CHEVRON PASIFIC INDONESIA – BLOK ROKAN DURI RIAU

Hired by PT. SMBR (EPCM - Singgar Mulia – Kelog Brown Root)

Position held & description of duties: Construction Engineer - Secondeed

for COMPREHENSIVE PIPELINE MANTENANCE (CPM-EPCM), Project Enhanced Oil Recovery (EOR) supporting. Provision of all area Cevron.

Job responsibility/Duties:

To run the day-to-day operations on the construction site and control the short-therm schedule, important safety, quality control and contractor coordination responsibilities

Assist in the development and maintenance of preconstruction, construction, and closeout execution plans

Assist in reviewing project drawing and specification to gaina full undesstanding of project scope, client goals and expectations, and resource requuirements for each phase of the project

Identity construction approaches and risk to ensure efficiency and mitigate exposure

Assist in soliciting and coordinating constractor for labor, material and equipment

Assit in the development and maintenance of project schedules, durations, and sequencing logic

Oversee the activities and performance of constractors to ensure compliance with quality requirements

Manage client interaction and promote positive relationships

Coordinate with Manager Engineering to do facility representative Chevron jobs

Monitor project progress to ensure compliance with financial, operational, and/or scheduling requirements

Move quickly to ensure the achievement of the essentials of HCT, Field Oil, Utility, pigging, hydrotest, PSSR, Star Up Commissioning piping and Pipeline maintenance/project.

2017 AUG – 31 Desember 2018

EMPLOYER: PT. PGN Solution – EPC (Engineering Procurement & Construction) Project.

POSITION HELD & DESCRIPTION OF DUTIES: Mechanical - Field Construction Engineer

RESPONSIBILITIES:

Construction Engineer for Provision of Dumai Receiving Facilities Offtake Station (DRF) part of PJDD at Dumai for PGN Tbk project. The project is to develop offtake station of natural gas facilities, particular assembly and instalation of piping, pipeline Utility System (Air Compressor, Diesel Engine Generator, Utility Water/Water Treathment, Air Conditioning and Fire Water System), the gas filter, gas chromatograph, Moisture Analyzer, H2S Analyzer and HCDP Analyzer and Metering and regulating System (MR/S) measured by ultrasonic meters (USM).

Job responsibility/Duties:

●Preparing-Evaluation Bid Document.

●Detail Engineering Design (DED)

●Mechanical Engineering documents (Specifications, Calculation, Data Sheets, Procedures, and Drawings) review.

●Move quickly to ensure the achievement of the essentials of MR/S, Utility, piping and Pipeline project.

●Material Analysis

●Piping/Pipeline document for Hydro Test

●Supervisi at field/site

●Mechanical Completion

●Pre Commisioning, PSSR, Start Up & Commissioning,

2016 Okt – 2017 AUG

EMPLOYER: PT. PGN Solution – EPC (Engineering Procurement & Construction) Project.

POSITION HELD & DESCRIPTION OF DUTIES: Construction Engineer-Field

RESPONSIBILITIES:

Construction Engineer for Provision of Proyek Pelaksanaan Pekerjaan Pengembangan Jaringan Daerah Duri - Dumai (PJDD) for PGN Tbk project.

The project is to develop the transmission and distribution of natural gas facilities including develop metering station an integrated pipeline insfrastructure in order to increase the utilization of natural gas, gathering 24” pipeline 60 Km from the Duri - Dumai Pipeline to DRF and sales gas pipeline from the DRF to Natural Gas Distribution Line Facilities in Riau Province and Dumai City.

Job responsibility/Duties:

Site supervision and inspection with respect to drawing.

Coordinate with site surveyors and contruction departement.

Coordinate for various engineering issues.

Assist the work and all the activities related to the field engineer, prepare a Field Change Notice design changes that occur in the field.

Move quickly to ensure the achievement of the essentials of MR/S, piping and Pipeline project.

Conceptual of Engineering Work.

HAZOP, HAZID Engineering

Precommisioning

Start Up Commissioning

Commissioning

2015 Okt – 2016 AUG

EMPLOYER: PT. PGN Solution–EPC (Engineering Procurement & Construction) Project.

POSITION HELD & DESCRIPTION OF DUTIES: Construction Engineer – Field

RESPONSIBILITIES:

Construction Engineer for Provision of Contract Package No. 9 Paket Penyediaan Penyaluran Gas Muara Karang - Muara Bekasi (PPGMM).

The project is to develop metering station an integrated 200 MMSCFD 24“ distribution pipeline 45 Km from the Muara Bekasi – Muara Karang Jakarta Utara including tie-in and metering station at Indonesia Power Jakarta.

Job responsibility/Duties:

Site supervision and inspection with respect to drawing.

Coordinate with site surveyors and engineering departement.

Coordinate for various engineering issues.

Assist the work and all the activities related to the field engineer, prepare a Field Change Notice design changes that occur in the field.

Coordinate with Project Manager to do its job.

Move quickly to ensure the achievement of the essentials of MR/S, piping and Pipeline project.

Conceptual of Engineering Work.

Step Process of Engineering Work.

HAZOP, HAZID Engineering

Precommisioning

Start Up Commissioning

Commissioning

2013 Mey – 2015 okt

EMPLOYER: Facility Representative PT. PGN Hired by PT. PGN Solution

Solution – Project Management Consultan (PMC)

POSITION HELD & DESCRIPTION OF DUTIES: Engineering Coordinator/Manager of Tecnical Assistance Services (TAS) as PGN Facility Representative

RESPONSIBILITIES:

Consultant of technical assist the owner in preparing the procurement of goods.

-Prepare Technical Bid Tender Document schedulling by baseline implementation of investment activities budget year 2014 of PGN TBk.

-Prepare Anwijzing process, escorting up to technical document review

Job responsibility/Duties:

coordinating the project execution operation involving planning.

to ensure the achievement of basic design Piping & Pipeline Bid evaluation Tender.

Lead pipeline / piping engineer of Offtake Station and Metering (MRS system) piping, Surveyor

As senior piping and pipeline engineer perform checking on various documents and drawings of offshore pipeline and piping design for MR/S plant Offtake Plant.

Tender support on various bidding.

PGN Project - PMC List at 2013 – 2015 :

2004 – 2012

EMPLOYER: PT. Kobar Flare Combustion : (Epc - Ko Drum – Piping - Pipeline - And Flare System

POSITION HELD & DESCRIPTION OF DUTIES: Project Manager Construction & Engineer

Duties:

Prepare Technical Bid Tender

Prepare Engineering Project proposal for next year's budget – Engineering Estimate

Engineering Phase in Oil Gas Project, Supervise to improved target to design engineering.

Front End Engineering Design (FEED)

Detail Engineering Design (DED)

Material Analysis

Safety First in Process Engineering

HAZOP, HAZID Engineering

Process specification & Data Sheet (DS)

Onshore and Offshore Production System

Green Field and Brown field process engineering

Heat & Material Balance(HMB), Process Flow Diagram (PFD) dan Piping & Instrumentasi Diagram (P&ID)

Waste Gas Treatment process (gas dehydration, CO2 Flare, H2S Flare, Mercury flare)

Precommisioning and Start Up Commissioning

Project Experiences List AT 2004 - 2012

No

Project

Location

Client

Owner

Years

1

6 unit ko drum, pipeline, welltest flare igniter, Piping and Pipeline

Salawati Field - Irian jaya

PT. Metallindo Perkasa Mandiri

JOB Pertamina - Petrochina Salawati

2004

2

15 MMSCFD Multi point ground flare, Piping and Pipeline

Tambun Area - Bekasi

PT. Klaras Pusaka International

PT Pertamina EP, Facility Tambun Bekasi

2005

3

15 MMSCFD Elevated flare, guy wire stack, Piping and Pipeline.

Koneng Station - Palembang

PT. Envico Indonesia

PT MedcoE&P Koneng Palembang

2006

4

60 MMSCFD Elevated flare, guy wired stack, water seal, Piping and Pipeline

LPG plant - Gresik

PT. Media Karya Sentosa

Pertamina PHE WMO, Gresik

2007

5

Flare tip and ignition system replacem, Piping and Pipeline ent

Pangkalan Brandan - Medan

PT. Atrakana

Pertamina EP, Pangkalan Brandan

2007

6

14" dia. X 18 meters over pressure vent stack

Muara Tawar - Bekasi

PT. Muladi

PT PJB – PLN Muaratawar

2008

7

3 unit vent stack, derrick supported, 10" dia. X 17 mtr c/w water seal

Muara Tawar - Bekasi

PT. Media Karya Sentosa

PT PJB – PLN Muara tawar

2008

8

3 unit well test mobile igniter – Jambi, Piping and Pipeline

Jabung - Jambi

PT. Indorimagas Lestari

PetroChina International Jabung, Ltd

2008

9

12" flare tip and ignition system replacement, Piping and Pipeline

Wampu - Medan

PT. Atrakana

Pertamina EP, Stasiun Pengukur Gas SP- X Wampu

2008

10

4" flare tip and ignition system

Gelam - Jambi

PT. Prime Petro Services

PT. Prime Petro Services

2008

11

15 MMSCFD Elevated flare, guy wire stack

Gunung Megang - Palembang

PT. Envico Indonesia

PT MedcoE&P Gunung Megang Palembang

2009

12

6 unit welltest flare igniter, Piping and Pipeline

Madura

PT. Metallindo Perkasa Mandiri

Pertamina PHE WMO, Gresik

2009

13

Flare Ignition System Replacement

Tambun Area - Bekasi

PT Satya Cipta Kreasindo

PT Pertamina EP, Facility Tambun Bekasi

2009

14

1 unit burn pit igniter

Salawati Field - Irian jaya

PT. Metallindo Perkasa Mandiri

JOB Pertamina - Petrochina Salawati

2009

15

1.5 MMSCFD Biogas enclosed ground flare

Pontianak - Kalimantan

PT. Envitech Perkasa

Monsanto Indonesia

2009

16

2 unit burn pit igniter

Jabung - Jambi

PT. Indorimagas Lestari

PetroChina International Jabung, Ltd

2009

17

1 unit flare ignition system

Cicau - Jawa Barat

CV. Mustika Rivamas

Pertamina Unit IV, Balongan

2009

18

3" elevated flare, self supported, water seal

Bangko - Riau

PT. Nikma Ismarta Kismareuda

Chevron, Banko Field

2010

19

16" flare tip and ignition system

Jambi

PT. Prime Petro Services

PT. Prime Petro Services

2010

20

12" Burn Pit Tip & ignition system

Banyuasin

PT. Power Sumber Solusindo

2010

21

igniter package for drilling

Bojonegoro

PT Centuri Dinamik Drilling

EXXONMobil Indonesia

2010

22

1.6 MMSCFD Enclosed Ground Flare

Lampung

PT Bio energy Indonesia

PT Bio energy Indonesia

2010

22

Direct Ignition system KF-DI-270 & Flare Tip KF-LP-8, Piping and Pipeline

Bekasi

PT Yudistira Energy

PT Pertamina EP, Facility Tambun Bekasi

2010

23

6" Air assisted flare 6 m height

Merak - Banten

CV. Laspro

BASF

2010

24

Flare ignition system, Piping and Pipeline

Cemara-Cirebon

CV. Cahaya Agung Mandiri

Pertamina Unit IV, Balongan

2011

25

Flare ignition system

Sorolangun - Jambi

PT Karsa Daya Utama

Chevron

2011

22

1.6 MMSCFD Enclosed Ground Flare

Lampung

PT Bio energy Indonesia

PT Bio energy Indonesia

2010

26

8" Flare Tip & Ignition System KF-DI-270

Pondok Tengah - Bekasi

CV. Mustika Rivamas

PT Pertamina EP, Facility Tambun Bekasi

2011

27

4" flare tip and ignition system

Gelam - Jambi

PT. Petroflexx

PetroChina International Jabung, Ltd

2011

28

Flare System Package Supat, Puyuh, & Rebon Jaro

Grissik

PT. Yusonda

-

2012

29

Open Ground Flare, Piping and Pipeline

Tambun Area - Bekasi

PT. Trinergi Mugi Mandiri

PT Pertamina EP, Facility Tambun Bekasi

2012

30

Biogas Flare 6M

Palembang

Palmpro - Zebra

Monsanto Indonesia

2012

28

Enclosed ground flare

gresik - jatim

Kodeco

-

2013

29

14" elevated flare, guy wired supported, c/w water seal

Riau

Kondur Petroleum

Kondur Petroleum

2013

31

Produce Water Evavorizer

Sembakung - Simenggaris

PT. Raga Perkasa Ekaguna

-

2013

2002 – 2004

CV. General “PLC” Service (www.gps-jogja.com)

as Construction - Engineer Manager

Duties:

Coordinate/Support with all Maintenance to installed, maintained and repaired of Equipment, Utility & Building or process plant in any industry

Flow Diagram & Instrumentation

Codes & Specification

Mechanical Equipment Drawing

Making Equipment Layout

Project Arrangement Drawing, Section & Elevation

Standard Drawing Details

Project System

Project List :

-Designed of digital scale. Merck “Duto”, specification of 10 ton weight.

-Preparing/making industrial autoimmunization by Microcontroller AT89C and PLC in PG MADUBARU Yogyakarta as sugar mill industries of entire/all middle java and east java.

-Coordinated with PT United Tractor Guide the Engineering in making of prototype Hand Tractor Machine with the specification of Full Gear.

-As Design Engineer and head project / Project Leader contract the job of PT of Gamma Engineering Yogyakarta by PT. GALANG SARANA DWITAMA Bandung in the form of work agreement of equal levying of goods and service in the form of " Short Lead Machinery And Tools Group" as order of PT KAI of Balaiyasa Lempuyangan, Yogyakarta, Indonesia, consisted of the :

1. Rotating Fixture for Engine Block.

2. Rotating Fixture for Play The Generator

3. Rotating Fixture for Irrigate the Compressor.

-Installed, maintained and repaired this machine.

●1997 – 1999

PT Mulia Keramik Indah Raya

as Supervisor Design Workshop Engineering,, Bekasi.

Duties:

Coordinate/Support with all Maintenance Division to installed, maintained and repaired of Equipment, Utility & Building of Ceramic process plant (Press Machine, Glass Application Machine, Packaging Machine, Compressor, Blower, Cooling water, Gas LPG in Kiln Machine, Oxygen, Air handling, Structure Building)

●1996 – 1997 PT Mulia Keramik Indah Raya, Bekasi

as Drafter Workshop Engineering

Duties:

Develop shop drawing.

●1995 – 1996

PT Mulia Keramik Indah Raya, Bekasi, as Technician Maintenance Division

Duties:

Keep/prepare equipment and maintenance continuously ceramic machine (body preparation machine, press machine, gas kiln machine and automatic packaging machine).

●1993 – 1994 GAMA Collection As a Mathematical Tentor.

EDUCATIONAL BACKGROUND:

FORMAL :

1977 – 1983 SDN Negeri 4 IKIP, Wates Kulonprogo Yogyakarta

1983 – 1986 SMP Negeri 1 Wates, Wates Kulonprogo Yogyakarta

2086 – 1989 SMA Negeri 1 Wates, Wates Kulonprogo Yogyakarta

1989 – 1992 D III Teknik Mesin Universitas Gadjah Mada, Yogyakarta

1999 – 2002 S1 Teknik Mesin Universitas Gadjah Mada, Yogyakarta

NON FORMAL :

2019 Certificate of Appreciation SKKMIGAS – CHEVRON

-14000 pairs sleeve and 900 spots road croosing improvement

2019 Basic and Standar Chevron Training (HES Pasport)

-MSW Fundamental A&B SWC/SYLA

-Zero Harm

-Devense Driving

-Welding Inspector CSWIP 3.0 TWI code.

2018 CAESAR II – STRESS ANALYSIS SOFTWARE

2018 SCADA system

-SCADA PCS & SIS Engineering

-SCADA PCS & SIS Operator ESD

-SCADA PCS & SIS SCD2200 Operator

2017 Commissioning Enginer By PETROS

2016 Cathodic Protection System SACP & ICCP Training Certificate

2016 RISK MANAGEMENT - HSE

2006 Sap 2000 For Construction In Ssc Mechanical Engineering Ugm.

(Certificate : 2006/SSC1/SHORT/SAP/018)

2014 Fundamental Project Management Training

Certificate Rina - Registro Italiano Navale

Sponsor by PT. PGN, Mercure Hotel Kuta Bali.

2013 Workshop Course PI.n.D

-Standard code OIL&GAS ASME B31.3 Design

-Standard code OIL&GAS ASME B31.8 Design

-API 510-Pressure vessel Inspector.

2004 HQ The Quality In Machinery Steel.

-Steel Properties in Machinery And Maintenance Cost, Pt. Tira

Andalan Steel.

2000 Use E-Commerce For The Business Of Global From

Mr. Ono W. Purbo, Hotel Santika Joint With

Gadjah Mada University.

1999 Supervisory Interpersonal Skill Training In

Mulia Industrindo

(Certificate : 317/Tod-Tsis/Vii/99)

21 Juny – 02 July 1999

In The Form Of :

-Way Of Facing Employees Which Have Low Achievement.

-Appreciation To Employees Which Have Above Average Achievement.

-Studying Habit - Bad Employee’s Habit.

-Submitting Change To Employees.

-Orient For New Employees In Your Environment.

-Conversing Possibility Of Discipline Action With Employees.

-Assessment From Result Work.

-Way Of Submitting Sanction To Employees.

-Counseling Of Passing Interview.

1997 Iso 9002 In Recognition Of Complettion

Of A Training Session In Iso 9002 Quality Awareness And Work Of Instruction Of In Engineering Workshop, PT. Mulia Industrindo Jakarta.

In The Form Of :

-Quality Management System Iso 9002.

-Operating Procedure Engineering Standard

-Part Regeneration, Welding Structure.

1997 Kursus Bahasa Ingris Conversation Borobudur Course, Cikarang Bekasi

1985 Kursus Microsoft Word – Excell Broadway

Computer, Wates Kulonprogo

1984 Kursus Patroli Keamanan Sekolah

ABILITY/KEMAMPUAN

Microsoft Office Word, Exel, Project, Power Point, Access & Outlook, Corel Draw, Corel Photo Paint.

Autocad, 3D Piping CAD SolidWorks, SAP 2000 For Construction, CAESAR II

Exel untuk Akutansi ( Neraca, Laporan Rugi Laba, Penganggaran, Journal dan Buku Besar )

Excel untuk Proposal Studi Kelayakan (Feasibility Study), RKAP, RAB, BQ dan EE (Engineering Estimate)

Preparing the S-Curve [Microsoft Project] for Project Management Office.

Problem Solver

oIdentify the problem (make a list of the causes, challenges and potential threats from the problem)

oExamine the choice of problem solutions (From each factor and potential threat, make a number of possible solutions to the problem)

oMake a plan (Make several plans from beginning to end with several backup plans)

oMeasure the Consequences and risks (From the plan, measure how much risk is there and how to anticipate it).



Contact this candidate