An accomplished professional with over Twelve years of diversified experience in the energy and gas industry. A reputation for maintaining the highest production, quality control and safety records. Effective at managing business relationship at all levels including Clients, subcontractors and vendors. Skillful in protecting workers, assets and the community in the most cost-effective manner.
ACADEMIC CREDENTIALS
B-Tech in Electrical and Electronics Engineering (2003—2007)
Diploma in Electrical Engineering (2000--2003).
KEY SKILLS
Construction Management Budgetary/Cost Control Team Building & Leadership
Quality assurance Precommissioning Handle stressful situations
Field Engineering Turnover Package Good HSE leader
Material Management Punch listing Authorized LOTTO
Progress Monitoring Problem solving Client relations
CORE COMPETENCIES
Installation and precommissioning of HV and LV Switchgears, Busducts, Transformers, NERs UPS and battery Chargers, HV & LV motors, Earthing system, Lightning protection system, Plant and building lighting system, overhead cranes, Cathodic protection system, Heat tracing system, Cable tray work, HV & LV cable laying including termination and testing.
Monitor site construction activities to ensure that discipline related activities, including material and equipment receipt, storage and installations are accomplished in full compliance with the HSE procedures, applicable specifications and standards.
Development of all technical documentation required to execute construction field installation activities including Method of statement and Risk assesment.
Familiar with HSE procedures and good HSE leader for safe implementation of work at site.
Field material take off and procurement support according to the project specification.
Conduct mechanical completion walk down and support precommissioning and turnover of plant facilities until provisional acceptance
Installation of all telecom system(PCS,PEAS,Telephone system & CCTV)
OTHER COMPETENCIES
KOC Approved Electrical Engineer (Ref: GP/15052373/60148/16)
Approved Authorized Electrical person for LOTO system(LV)
Approved permit issuer in KNPC CFP-MAB-1 Project(Green Field)
KNPC Approved Permit Executer(Brown Field)
SUMMARY OF EMPLOYMENT
Petrofac International Limited, Kuwait (2017-till date)
Alghanim International Gen trading & Cont. Co, Kuwait (2014-2017)
Snamprogetti/Saipem Saudi Arabia Ltd, Saudi Arabia (2011-2013)
MMG, Saudi Arabia (2009-2011)
Melcon Engineers, India (2007-2008)
EMPLOYMENT DETAILS
Period: -Jan-2017 to Till date (Oil & Gas Project)
Employer : Petrofac International Limited
Location : Kuwait
Designation : Construction Engineer- Electrical
Project : Clean Fuel Project-MAB-1, Kuwait National Petroleum Company (KNPC)
Job description:
Installation and precommissioning of HV and LV switchgears, Bus ducts, Transformers, NERs,UPS and battery Chargers,HV & LV motors,Earthing system,Lightning protection system, Plant and building lighting system, overhead cranes,Cathodic protection system,Heat tracing system, Cable tray work,HV & LV cable laying including termination and testing.
Supervise the subcontractor personnel to ensure contractor performs all work to agreed standards for safety, health and environment and to attaining high levels of HSE performance, applicable specifications and standards.
Promote safe work practices and environmental protection, ensuring that safety standards are respected.
Supervise construction and coordinate subcontractors work at site to maximize the effectiveness of construction delivery to time, budget and quality objectives.
Coordinate with vendor for testing and modification activities at site answer technical queries and provide continuous assistance to engineering to solve site related issues..
Monitoring progress and review construction installation and completions by the subcontractor at site.
Study the subsystem and arrange the MC Walkdown by closing all the related inspection test records and review /approve final punch before input in to database.
Detailing the work progress, number of Subcontractors personnel and equipment available on site and other related items identified in the scope of work.
Period: - Mar-2014 to Jan-2017 (Oil & Gas Project)
Employer : Alghanim International General Trading & Contracting Co. WLL
Location : Kuwait
Designation : Construction Engineer -Electrical
Project : Booster Station-171- Project, Kuwait Oil Company (KOC)
Job description:
Involved in all type of electrical construction activities in Booster Station-171 like equipment installations, cable laying, Cable tray, earthing, lighting, Glanding, Termination etc. according to the KOC Specification and standard.
Responsible for planning, coordinating and organizing the activities of construction team in order to meet agreed deadlines.
Prepare Maintain and tracking of bill of Quantities (BOQ) and Material take off (MTO) according to the project approved drawing.
Understand the scope of work/activities of project and proposing suitable corrective action through technical query if necessary, ensuring the easy establishment at work site which compliance with relevant standards.
Monitoring the contract documentation to assess feasibility of construction, identify any potential areas of difficulty and take note of any variations required in the construction.
Involved in procurement and technical review of bulk material specifications as per contract.
Issuing material requests for materials and consumables preparing and review project specification and other procedures to ensure comprehensive cover of all project activities as per the contract requirements.
Coordinating with all site supervisors and construction team including equipment coordinator, manpower coordinator and with other discipline team to ensure effective integration of tasks and minimize day to day construction delays.
Reviewing the progress of the project as per the project plan and against the contractor’s requirements and take corrective action whenever required, proper execution and implementation of work to ensure desired results.
Responsible for the timely follow up with the contractor on material approvals, construction work front clearances and any discrepancies in the drawings.
Liaising with clients and their representatives, including attending regular meetings to keep them informed of progress.
Coordinating and supervising site construction activities, document control, monitoring site safety and ensuring premium quality workmanship.
Take a prominent role in technical direction, chairing site meetings and liaising with engineers, subcontracts and suppliers.
Leading, mentoring & monitoring the performance of team members to ensure efficiency in construction activities and meeting of project targets.
Period: - Oct-2011 to Aug-2013 (Oil & Gas Project)
Employer : Saipem/Snamprogetti Saudi Arabia Ltd
Location : Kingdom Of Saudi Arabia
Designation : Electrical Supervisor
Project : Manifa Core Hydrocarbon Facilities Project (Saudi Aramco)
Job description:
Directs Subcontractor activities for electrical discipline, ensuring that plant construction works are performed according to the erection schedules and Project documents, within the assigned cost budget, and according to quality & safety procedures, as well as according to the terms and conditions of the subcontract.
Supervise the electrical works of the assigned site as per approved drawings and makes to ensure execution of works in line with specification of works.
Prepare daily site reports to ensure close monitoring of Sub contractor’s progress activities.
Attend progress meetings with sub contractors and clients whenever required.
Interacting with the pre-mechanical completion team with regard to system, discipline, and area-related issues, and for organizing and providing daily work direction and coordination of Systems Completion Team.
Arrange final mechanical completion (MC) walk-downs/punch outs of systems, and review/approve final punch before input into database; ensure that final, approved system punch is input into database.
Provide start-up support and operations supports up until provisional acceptance.
Period: - Oct-2009 to Sep-2011 (Oil & Gas Project)
Employer : MMG
Location : Kingdom Of Saudi Arabia
Designation : Site Engineer-Electrical
Project : MCHF Project (Saudi Aramco)
Job description:
Supervise Electrical crews in the installation of electrical equipments including transformers, panels, cables, grounding, light fittings, and power outlets Etc.
Work planning and distributing the manpower according to the work priority.
Material management and ensure availability of material at site on time.
Involved in the project measurement report preparation and verified all the data to ensure that it was accurate and accurately reflected the status of the project.
Ensures installations accordance with the specification of electrical codes and standards.
Period: - May-2009 to Oct-2009 (Petrochemical Project)
Employer : Abaja Const EST
Location : Kingdom Of Saudi Arabia
Designation : Site Engineer-Electrical
Project : Saudi Kayan Petrochemical Project (SABIC)
Job description:
Execute electrical construction activities like cable laying, earthing, lighting, cable tray works etc.
Coordinating and supervising site construction activities, document control, monitoring site safety and ensuring premium quality workmanship.
Plans and direct the preparation of project documents,scope of works, standards, specifications and implementation schedule
Prepare daily and weekly electrical progress and reports to the Discipline Manager
Execute tasks for assigned projects from planning, reviewing, inspection, installation to completion of the project progress.
Period: - Jul-2007 to Dec-2008 (Cement Plant Project)
Employer : Melcon Engineers
Designation : Site Engineer -Electrical
Location : Andrapradesh, India
Project : Ultratech Cement Plant Project, India
Job description:
Worked as an electrical Engineer and involved in installation of electrical equipments like, Current transformer, Potential Transformer, Power circuit breakers - SF6, VCBs & ACBs ranging up to 220kv, Power transformer up to 100 MVA, HT cables (up to 11KV), Slip ring induction motor with Liquid Resistance Starter, Oil cooled transformers with On Load and Off Load tap changers, Switch gear, MCC, Power panels, Lighting Panels & Bus duct, M.V Motors (Up to 7400 H.P) & L.V Motors,MCCBs & MCBs.
Supervision of cable tray erection and cable laying.
Support and assist the client during testing and commissioning of the equipment/System.
I.T SKILLS
MS Office,
AutoCAD 2007
PERSONAL DETAILS
Nationality : Indian
Date of Birth : 29-May-1985.
Skype ID : sudhipalliyalil
Passport No : M5451577
Address : Karattupalliyalil House, Malappuram,Kerala,India
DECLAIRATION
I hereby declare that the information furnished above is true, complete to the best of my Knowledge and belief and I have not suppressed any information. Iam aware that my Candidature can be terminated fourth with if the information given above is incorrect or incomplete.
Sudheesh Subramanian