CURRICULUM VITAE
ASHFAQ AHMED SIDDIQUI
Mechanical Engineer (MEP) Present address: Abu Dhabi, U.A.E. Mob: +971-*********, +91-828*******.
Email: ******************@*****.***
Summary
I am a result oriented professional, having 4 years of experience in MEP Project Execution & Management work,Maintenance and Design. My area of Expertise include Residential and commercial projects in the specialization of HVAC-MEP services from Nov 2015 to Present. My professional Technical skills includes:
HVAC Software - HAP, TOSHIBA, Mc QUAY Duct & Pipe Sizer, BETA Performance data programmer, E 20, Career Psychometric Chart Analyzer, Converters.
Chillers, VRF, Split, Duct able, AHU, and FCUS.
Planning of HVAC system
Cooling and Heating load calculations
Chiller selection
AUTO-CAD Software
Software Skills
Hourly Analysis Programme (HAP)
Duct sizing
AutoCAD
MS excel
MS Office
Education
Bachelor Engineering (MECHANICAL)
From S.R.T.M University, Nanded (M.S.) INDIA, in 2016
Post Graduate Diploma
In H.V.A.C systems, in June 2016, Aurangabad, India Employment
Company : ESAPLLING Pvt Ltd.
Designation : Jr.Mechanical Engineer (Design and Execution Engineer) Duration : Nov 2015 - Nov 2016
Company : WADIA INTERNATIONAL CENTER, THE BOMBAY DYEING. Designation : Sr.Mechanical Engineer (Maintenance Engineer) Duration : Nov 2016 - Feb 2019
Company : Bin Aweidha Electro Mechanical, Abu Dhabi, U.A.E. Designation : Sr.Mechanical Engineer (Operational and Maintenance Engineer) Duration : Jun 2019 – Present
Responsibilities in Organization:
Monitored HVAC, Plumbing, Drainage and Fire Fighting system works to check the compliance with the approved shop drawings, specifications and quality standards as a responsibility for MEP works.
Air Conditioning Heat Load calculations by HAP & E20 by following ASHRAE codes.
Designing and Detailing for complete HVAC system, VRF, Air cooled chiller system, and Water cooled chiller system.
Designing of Air Distribution System by – Velocity Method, Equal Friction Method.
Selection of VRF/VRV System, Chillers, AHU’S, FCU’S, Exhaust Fan, Kitchen Hood, Pumps and other accessories.
Tenders submission in UAE.
Communications, Meetings & Discussions with Architect/vendors/Client/Site.
Handling of Site/Client/Sub contractors/ vendor management.
Preparation of BOQ for Projects.
Verify shop drawings based on tender drawings.
Complete design work of ducting network with preparation of drawings with complete standards.
Preparing measurement sheets for ducting, Grill, Diffusers, Dampers, piping for billing.
Complete design work of firefighting network with preparation of drawings with complete standards.
Handing over the project with all test reports, commissioning report, Project photos, as build drawing & Warranty.
Stock maintain in store and material purchase.
Project’s
Site Executed Project’s
The Bombay Dyeing, Mumbai, India.
The project was a commercial building with capacity 500TR where 23 AHUs were installed.
Cilicant, Pune, India.
The project was a commercial building. The heat load of the project was 60 TR and 3 AHUs were installed.
VTP solitaire Mumbai India.
The project was a commercial building. VRF System Supply & Installed: 50 HP VOLTAS
VTP solitaire Pune India.
The project was a commercial building. VRF System Supply & Installed: 60 HP VOLTAS. Maintenance Project’s
The Bombay Dyeing, Mumbai, India.
Maintenance of 500 TR Chiller plants, 23 AHUs, 15 duct able units.
Buildings and villas, UAE.
MEP Maintenance of buildings and villas.
Design Project’s
Verona Apartment.
Calculated Heat load of this project, Heat load was 120 TR, 8 duct able machines were installed.
Sterling Hospital.
Calculated Heat load of this project, Heat load was 55 TR, 6 AHUs were installed. Personal Details
Date of birth : 14 Nov 1993.
Language : English, Hindi, Urdu, Marathi.
Marital status : Unmarried.
NATIONALITY : INDIAN