CHANDRASHEKHAR V HULL
Mobile: +91-888*******
E-Mail: ******@*****.***
Career Summary
As a Project Engineer (Mechanical) with 8 years of Project coordination/Project Management experience in EPC companies.
As a Mechanical/Maintenance Engineer with 12 years of Maintenance experience in manufacturing/engineering industry.
Worked in Multi-disciplinary and multi-cultural environment.
Graduate Mechanical Engineer/Design coordinator with 18 years of experience in Infrastructure Projects and Maintenance
Objective
Looking for a responsible position as a team player with a people-oriented organization where I will be able to maximize my experience in Project management inside a challenging environment for achieving all the corporate goals.
Professional Skills and Abilities
Knowledge of project execution and implementation stages.
Developed engineering skills on rotary and stationary equipment like pumps, aboveground storage tanks, above piping, underground pipelines, tie-ins.
Exemplary relationship management, communication skills with the ability to network with various stakeholders.
Good knowledge in project management practices, Project Systems module, and procurement process.
In-depth knowledge of estimating project cost, scheduling work flow, and mechanical inspection procedures.
Ability to handle multiple tasks and meet project deadlines.
Employment Profile
August 2018 – August 2019 with M/s. Hyundai Rotem Company Qatar as Mechanical/Piping Engineer.
Project Title: CP652- DBOM of Al Dhakira Sewage Treatment Works & Associated Pipelines.
Capacity: 56,200cum/day
Client: Ashghal, Qatar
Responsibilities:
Support Piping Manager in all piping design aspects of the project and ensure work is executed in accordance with technical requirements.
Assist Piping Manager in the development of piping work preparation schedule.
Review of Design drawings prepared by Design consultant and coordinating with other discipline for preparation of combined services drawing.
Review and modification of pipe support drawings, pipe routing and confirming with site team to ensure there is no interference with other structures, cable trays, other piping structures/racks.
Review of GA drawings related to piping (Underground & above ground) with respect to isometric drawings.
Modification of piping drawings to incorporate any changes/revision in the equipment layout.
Preparation of shop drawings and coordinating with Client for obtaining approval.
Attending technical meetings with the Client representative to resolve issues related to piping design and site constraints.
Raise concern regarding interference of piping and piping supports with civil structures, electrical manholes, drainage manholes.
Ensure work packages related to piping (method statements, complete subcontracts) are timely prepared, reviewed and discussed with the Piping Manager.
Prepare procurement schedule in liaison with the Piping Manager and ensure adequate tracking of materials and reconciliation during execution of the project.
Coordinate construction activities at site and manage the activities of Site Engineers, Draftsmen, Surveyors and material collector.
March 2016 to August 2017 – Self Employed.
May 2014 – Feb 2016 with M/s. Tecton Engineering & Construction W.L.L, Qatar as Sr Project Engineer
Tecton is an EPC company executing Infrastructure, Oil & Gas, and MEP Projects.
Project Title: GTC 524- Installation of Emergency TFS’s & Internal piping improvement.
QP Contract No. GC13106600 - EPIC OF WATER STORAGE TANKS, PUMP STATION AND CHLORINATION BUILDING IN DUKHAN FIELDS
Client: Kahramaa, Qatar and Qatar Petroleum, Qatar
Responsibilities:
Review of Design and Construction/Shop drawings related to A/G 2 nos steel storage tanks of 2.0 MMIG capacity.
Supervision of storage tank subcontractor works related to fabrication, erection and various testing activities.
Liasoning with TPI inspectors and Client representative for inspection and approval during various stages of tank fabrication and other related site works.
Arranging for Hydrotesting of storage tanks and liasoning with various stakeholders for smooth execution.
Execution of all associated pipeworks/valves and accessories related to the storage tanks.
Supervision of painting works of the storage tanks.
Review & optimization of Design drawings with respect to project specifications, scope of works and site conditions.
Discussion with Design Consultants to resolve bottlenecks and liaise with the Consultant Design Engineer on modifications if required.
Liaison with other engineering discipline leads for co-ordination of engineering drawings.
Review of all material and drawing submittals before submitting for Clients approval.
Support Project Manager in all engineering aspects of the project and ensure work is executed in accordance with technical scope requirements.
Assist Project Manager in the development of work preparation schedule and ensure resources, project schedule and contract strategies are appropriate.
Prepare a list of deliverables to the Project Plan.
Ensure work packages (method statements, complete subcontracts) are timely prepared, reviewed and discussed with the Construction Manager.
Prepare procurement schedule in liaison with the Project Manager and ensure adequate tracking of materials and reconciliation during and after execution of the project.
Coordinate construction activities at site and manage the activities of the Site Engineers, Draftsmen, Surveyors and material collector.
Assist as necessary with QA Audits and assist Project Quality Engineer in field inspections on assigned projects.
Liaise with project planner on changes to overall project schedule and alert project management of potential schedule risks.
Keep the project team informed on all relevant aspects of engineering issues that arise on the project, in terms of progress, quality, safety and subcontractor / supplier performances.
Attends progress review meetings and co-ordination meetings to assist the Project Manager Engineer in resolving any site issues such as discrepancies in projects drawings.
Carryout technical audit of final bills to ensure correct application of contractual conditions and verification of specifications, measurements and classification, handling emergencies and critical works on / off project sites, monitor effective utilization of company resources deployed at site and identify the gaps of potential risks.
Assists in subcontracts administration and related correspondences, measurements, payment certification, closing final account etc.
Prepares a List of Project Materials along with the required quantities and maintains continuous project materials reconciliation.
Attends progress review meetings and co-ordination meetings to assist the Project Manager in resolving any site issues such as discrepancies in projects drawings.
Assist with resolution of engineering problems and provide technical guidance by carrying out investigations, evaluating solutions and writing recommendations.
Assists in preparing budget and current estimates and monitor any variances.
June 2012 – August 2013 with M/s. Hasan Juma Backer Trading & Contracting Co as Project Engineer
Hasan Juma Backer is an EPC company executing Infrastructure, Civil and MEP Projects.
Project Title: i) GTC -78 UPGRADING OF WESTBAY AND GHARAFFA WATER STATION
ii) GTC – 109 MADINAT AL SHAMAL AND ASSOCIATED PIPELINE
Client: Kahramaa, Qatar
iii) EPIC FOR RLC POTABLE WATER STORAGE TANKS & PUMPS FOR QATAR PETROLEUM IN QATAR (GC09107200)
Client: Qatar Petroleum, Qatar
Responsibilities:
Review of Design and construction drawings related to 2 nos of A/G Steel storage tanks of 11400 cu.m working cap (Dia 34m & Ht 15.5m).
Supervision of storage tank subcontractor works related to fabrication, erection and various testing activities.
Liasoning with TPI inspectors and Client representative for inspection and approval during various stages of tank fabrication and other related site works.
Arranging for Hydrotesting of storage tanks and liasoning with various stakeholders for smooth execution.
Execution of all associated pipeworks/valves and accessories related to the storage tanks.
Supervision of painting works of the storage tanks.
Review and study of all Pipeline layout drawings, Pump Station drawings, pipeline isometric drawings, calculations/reports and highlight issues pertaining to design, specification, Project scope.
Ensured that all engineering works assigned is within the budget and schedule.
Executed Pumps, piping, pipeline, valves, pipe supports installation works.
Executed Tie-ins works to existing and new facilities.
Preparation of Red line markup drawings.
Preparing the pipeline and piping for Hydrotesting and disinfection.
Project scheduling including planning of resources (material, manpower, machinery, money)
To guide & facilitate all necessary support to the Project managers in terms of drawings, staff support, materials, internal decisions, technical solutions, resolving contractor issues and all other resources on a timely basis.
Carryout technical audit of final bills to ensure correct application of contractual conditions and verification of specifications, measurements and classification, handling emergencies and critical works on / off project sites, monitor effective utilization of company resources deployed at site and identify the gaps of potential risks.
Evaluation, preparation of schedules, work orders, agreements, etc. for Sub-contracting works, handling criticalities of material delivery, contractual claims.
Originate, follow up Punch lists till close out.
Close co-ordination with Commissioning co-ordinator to complete the pre-commissioning, commissioning and start up activities.
Liasoning and close co-ordination with Clients regarding technical and contractual issues.
Attending weekly progress meeting with Client and preparation of Minutes of Meeting.
Coordinated workflow within the engineering team, reinforced and promoted quality and safety standards, interfaced with client and vendor engineering staff of projects.
Additional Responsibility:
Material take-off from Tender drawings.
Rate analysis of Electro-Mechanical items.
Estimation & Costing for Electro-Mechanical/Structural Steel package in conjunction with project BOQ, Specifications & Drawings.
Preparation of final Technical Bid and Commercial bid of multidisciplinary Tenders
January 2012 – May 2012 with M/s. Ahmed Mansoor Al A’Ali, Bahrain as Mechanical Engineer
M/S Ahmed Mansoor Al A’Ali is an Engineering & Construction company doing structural and infrastructure projects.
Responsibilities:
Preparation of daily progress report.
Preparation and submission of weekly progress report to the Client.
Estimation & Costing for Electro-Mechanical /Structural Steel package in conjunction with project BOQ, Specifications & Drawings.
March 2007– July 2011, with M/s. Hasan Juma Backer Trading & Contracting Co, Qatar as Project Engineer
Hasan Juma Backer is an EPC company executing Infrastructure, Civil and MEP Projects
Preparation of material submittals.
Preparation of drawing submittals.
Coordinating with Client for approval of engineering deliverables.
Attending weekly progress meeting and preparing of minutes of meeting.
Preparation of commercial and technical comparison for all the equipments.
Sept 2000– April 2006, with M/s. Nusi Maritime Academy, Goa India
Nusi Maritime Academy is a marine training academy for cadets and technicians
April 1997– Sept 2000, with M/s. Nicomet Industries Ltd, Goa India
Nicomet Industries Ltd is a manufacturing company engaged in manufacture of Cobalt, Copper metal and their solutions
Responsibilities:
Maintenance & troubleshooting experience on continuous process plant equipment like Centrifugal Process Pumps, Vacuum Pumps, Air Operated Pumps, Centrifuges, F.B.D’s, FRP Reactors and Tanks, Agitators, Blowers, Air Compressors, Gear Boxes, Diesel Generators, Manual and Hydraulic operated Filter Press, Thickners, Rotary Furnace, Bucket Elevators, Screw Conveyors, Steam Jacketed Reactors, Pulverisers, Oil burners.
Fabrication, Installation and Maintenance of M.S/S.S/FRP tanks.
Installation and Maintenance of Steam and Heat generation systems like Fire tube boilers (1.5T) and Thermopac and allied network.
Maintenance of Safety Valves, Regulating Valves, and PP valves for corrosive liquids.
Handled and co-ordinated with Production Department for planned/unplanned plant shutdowns and start-ups.
Provided technical guidance and day-to-day supervision of the Jr Engineers and Technicians.
Measured contactors work and signed off time sheets.
Co-ordinating with Government Department for various permits and approvals.
Development and implementation of scheduled maintenance plans, lubrication plans, overhauls, inspections, instruction books, and checklists.
Feb 1995 - March 1997, with M/s. Atlas Gears Ltd, Maharashtra, India
Atlas Gears Ltd is a engineering company engaged in manufacture of transmission gears.
Educational Qualifications
Degree/
Diploma
Name of Institution
Year of passing
Grade/class
B.E -Mechanical Engineering
KLE’S College of Engineering & Technology, Belgaum (Karnataka University)
1994
First class
Achievements
Initiated, Prepared and got approval from Client for positive Variation amounting QAR2.5 million for M/S HASAN JUMA BACKER TRADING & CONTRACTING CO. LLC, DOHA, QATAR.
Received Best Employee Award from M/S Hyundai Rotem Co.
Personal Details
Address: H No 96, Vardhappa Galli, Khasbag, Belgaum 590003
DOB: 10/12/1971
Passport No: K 6360261 valid upto 21/12/2022.
Qatar Driving License No 271******** valid up to 20th Aug 2019.
(Chandrashekhar V Hull)
Date :