M. MUTHUKUMAR
Contact: **** – ********/ Whatsapp +965-********
E Mail: ***********@*****.***
Seeking assignments as Project Engineer with an organization of repute preferably in Oil & Gas / Petrochemical Industry PROFILE SUMMARY
A dynamic professional with nearly 15+ years of experience in Piping Engineering Operations. Comprehensive experience in implementation of equipment & piping structures on processes and procedures to facilitate smooth functioning of overall operations along with enhancement of operational efficiency for the piping structures. Good exposure to International Codes like ASME, AWS, ASTM, etc. Possess sound knowledge of Equipment Layout, International piping standards and codes, piping P & ID, GA and Isometric drawings, Bill of Quantities, Piping Layout and Piping AFC Measurement.
Holds the distinction of handling new projects upto commissioning stage and carrying out inspection tests for determining the effectiveness of equipment. Proficient in selection and sizing of piping, preparation of piping layout, reviewing, estimations, isometric checking, standard and specification development, tendering and vendor development. An effective communicator with abilities in leading multi skilled motivated teams to achieving organizational goals and industry’s best practices AREAS OF EXPERTISE
Involved in all stages of piping inspection activities like fabrication, flange face and orientation, bolt torque, valve installation, orifice flange inspection, etc.
Managing erection & commissioning of various pipeline, plant piping, mechanical equipment & machines to facilitate smooth project progress
Carrying out inspection tests for determining the effectiveness of equipment
Driving and supporting the implementation of quality management systems for enhancing product & process quality, as well as for reducing costs
Implementing measures for achieving reduction in waste, and consumption levels for fuel & energy
Maintained a close interaction with the Engineering and Execution Dept. & suggested the required actions to be taken within target date
Ensuring that all Quality Control Procedures and specifications are relevant to the contractual requirements of production and are adhered to all the times
Preparing, monitoring and or carrying out regular welding audits, welding procedure qualifications, welder performance qualifications, preparation of weld maps and weld sequence for welding EMPLOYMENT DETAILS
Since Jan’12: Gulf Spic General Trading & Contracting Co., Kuwait as Project Engineer – Piping/ Materials Nov’08 – Apr’11: Mc Connell Dowell Sea Pte. Ltd., Singapore as Project Engineer Piping/ Contracts Engineer Key Result Areas
Effectively maintaining all the daily site progress, gradual monitoring and allocating the project materials, logistics routes and assigning
Gathering the project remarks from the Site Engineers and updating the same to the Site Project Manager
Monitoring and handling of various type of shutdown jobs; ensuring preparation of As Built Drawings
Accountable to plan activities for Piping Shop Fabrication and Field Erection
Oversaw the arrangement of Tools and Tackles and Equipment required for erection
Ensured deployment of supervision and manpower in job as per schedule
Facilitated welding checking and quality maintenance
Responsible for ensuring the implementation of HSE Policy and Quality Policy
Ensured that PTW (Permit to Work) System functioned as per procedure, wherever required PREVIOUS EXPERIENCE
Oct’07 – Oct’08: Mun Siong Engineering Pte. Ltd., Singapore as Project Engineer Piping Mar’06 – Oct’07: Fabrik Tech India Pvt. Ltd., India as Piping Engineer Jun’03 – Mar’06: Aster Teleservices Pvt. Ltd., India as Site Engineer TRAININGS ATTENDED
Attended various trainings based on:
o Heart and mind
o Storing of chemical in water or soft drink bottle materiel handling and safety on eye injury o Impact wrench operation/ Lifting activity / High speed cutter operation / material handling / hot work activity / harness safety and grinding operation o Working on height / safe use of safety harness / hot work safety /incident reporting / lifting appliances and operating of mobile crane
o Drug and Alcohol policy / lifting gear monthly audit / briefing of lifting operation RA (Crane operator)
/ Manual handling of material / NID and Knowing of work place safety and health act o Machine safety safe use of drill and grinding machine / safe uses of crane only operator o Noise induce deafness
o WSH Act, RA introduce training
EDUCATION
BE (Mechanical Engineering) from Madras University, Chennai, India (1999 2003) Other Courses
Oil/ Petrochemical Industry Safety Course for Supervisor
Building Construction Supervisors Safety Course
Piping course in Plant Designing and Detailed Engineering. IT SKILLS
Well versed with MS Project, MS Office, AutoCAD, Pro E 2000i and Internet Applications PERSONAL DETAILS
Date of Birth: 5th April, 1981
Permanent Address: No: 19/ 54, Thirunagar, Villivakkam, Chennai 600049, Tamil Nadu, India. Language Known: English and Tamil
Passport Details: J5777277( Date of Expiry: 13 06 2021). Driving license Details: Valid Kuwait Driving License. ANNEXURE
Client: KNPC
Platform: Piping/ Materials.( KNPC APPROVED ENGINEER) Period: Nov’18 – Till Date
Location: Kuwait
Team Size: 8 Engineers & 2 Trainees
Summary: KOC Molten Sulphur Handling Facilities at MAA Refinery . Client: KNPC
Platform: Piping
Period: Sep’15 – Oct’18
Location: Kuwait
Team Size: 4 Engineers & 2 Trainees
Summary: NAGRP
Client: KNPC
Platform: Piping
Period: Jan’14 – Aug’15
Location: Kuwait
Team Size: 8 Engineers & 2 Trainees
Summary: EPC for Revamp of MAA Burnery for Recovery & Smokeless Operation Client: KOC
Platform: Piping
Period: Jan’12 – Dec’13
Location: Kuwait
Team Size: 8 Engineers & 2 Trainees
Summary: Replacement of Hic Effected Vessels in SK GC's 3,4,7,8 & 21 Client: Foster Wheeler
Platform: Piping
Period: Oct’08 – Apr’11
Location: Singapore
Team Size: 12 Engineers & 20 Trainees
Summary: Singapore Parallel Train Project (SPT)
Client: SHELL
Platform: Piping
Period: Feb’08 – Oct’08
Location: Singapore
Team Size: 2 Engineers & 2 Trainees
Summary: Increase 500 CST Storage Capacity Double Hull Lighters Berthing at Wharf 1, 3, 10 Client: Foster Wheeler
Platform: Piping
Period: Oct’07 – Oct’08
Location: Singapore
Team Size: 10 Engineers & 20 Trainees
Summary: Bukum Refinery Modification Project (BRM)