Post Job Free

Resume

Sign in

Engineer Piping

Location:
Qibla, Kuwait City, Kuwait
Posted:
July 13, 2020

Contact this candidate

Resume:

M. MUTHUKUMAR

Contact: ************/ Whatsapp +965-********

E Mail: adekgx@r.postjobfree.com

Seeking assignments as Project Engineer with an organization of repute preferably in Oil & Gas / Petrochemical Industry PROFILE SUMMARY

A dynamic professional with nearly 15+ years of experience in Piping Engineering Operations. Comprehensive experience in implementation of equipment & piping structures on processes and procedures to facilitate smooth functioning of overall operations along with enhancement of operational efficiency for the piping structures. Good exposure to International Codes like ASME, AWS, ASTM, etc. Possess sound knowledge of Equipment Layout, International piping standards and codes, piping P & ID, GA and Isometric drawings, Bill of Quantities, Piping Layout and Piping AFC Measurement.

Holds the distinction of handling new projects upto commissioning stage and carrying out inspection tests for determining the effectiveness of equipment. Proficient in selection and sizing of piping, preparation of piping layout, reviewing, estimations, isometric checking, standard and specification development, tendering and vendor development. An effective communicator with abilities in leading multi skilled motivated teams to achieving organizational goals and industry’s best practices AREAS OF EXPERTISE

Involved in all stages of piping inspection activities like fabrication, flange face and orientation, bolt torque, valve installation, orifice flange inspection, etc.

Managing erection & commissioning of various pipeline, plant piping, mechanical equipment & machines to facilitate smooth project progress

Carrying out inspection tests for determining the effectiveness of equipment

Driving and supporting the implementation of quality management systems for enhancing product & process quality, as well as for reducing costs

Implementing measures for achieving reduction in waste, and consumption levels for fuel & energy

Maintained a close interaction with the Engineering and Execution Dept. & suggested the required actions to be taken within target date

Ensuring that all Quality Control Procedures and specifications are relevant to the contractual requirements of production and are adhered to all the times

Preparing, monitoring and or carrying out regular welding audits, welding procedure qualifications, welder performance qualifications, preparation of weld maps and weld sequence for welding EMPLOYMENT DETAILS

Since Jan’12: Gulf Spic General Trading & Contracting Co., Kuwait as Project Engineer – Piping/ Materials Nov’08 – Apr’11: Mc Connell Dowell Sea Pte. Ltd., Singapore as Project Engineer Piping/ Contracts Engineer Key Result Areas

Effectively maintaining all the daily site progress, gradual monitoring and allocating the project materials, logistics routes and assigning

Gathering the project remarks from the Site Engineers and updating the same to the Site Project Manager

Monitoring and handling of various type of shutdown jobs; ensuring preparation of As Built Drawings

Accountable to plan activities for Piping Shop Fabrication and Field Erection

Oversaw the arrangement of Tools and Tackles and Equipment required for erection

Ensured deployment of supervision and manpower in job as per schedule

Facilitated welding checking and quality maintenance

Responsible for ensuring the implementation of HSE Policy and Quality Policy

Ensured that PTW (Permit to Work) System functioned as per procedure, wherever required PREVIOUS EXPERIENCE

Oct’07 – Oct’08: Mun Siong Engineering Pte. Ltd., Singapore as Project Engineer Piping Mar’06 – Oct’07: Fabrik Tech India Pvt. Ltd., India as Piping Engineer Jun’03 – Mar’06: Aster Teleservices Pvt. Ltd., India as Site Engineer TRAININGS ATTENDED

Attended various trainings based on:

o Heart and mind

o Storing of chemical in water or soft drink bottle materiel handling and safety on eye injury o Impact wrench operation/ Lifting activity / High speed cutter operation / material handling / hot work activity / harness safety and grinding operation o Working on height / safe use of safety harness / hot work safety /incident reporting / lifting appliances and operating of mobile crane

o Drug and Alcohol policy / lifting gear monthly audit / briefing of lifting operation RA (Crane operator)

/ Manual handling of material / NID and Knowing of work place safety and health act o Machine safety safe use of drill and grinding machine / safe uses of crane only operator o Noise induce deafness

o WSH Act, RA introduce training

EDUCATION

BE (Mechanical Engineering) from Madras University, Chennai, India (1999 2003) Other Courses

Oil/ Petrochemical Industry Safety Course for Supervisor

Building Construction Supervisors Safety Course

Piping course in Plant Designing and Detailed Engineering. IT SKILLS

Well versed with MS Project, MS Office, AutoCAD, Pro E 2000i and Internet Applications PERSONAL DETAILS

Date of Birth: 5th April, 1981

Permanent Address: No: 19/ 54, Thirunagar, Villivakkam, Chennai 600049, Tamil Nadu, India. Language Known: English and Tamil

Passport Details: J5777277( Date of Expiry: 13 06 2021). Driving license Details: Valid Kuwait Driving License. ANNEXURE

Client: KNPC

Platform: Piping/ Materials.( KNPC APPROVED ENGINEER) Period: Nov’18 – Till Date

Location: Kuwait

Team Size: 8 Engineers & 2 Trainees

Summary: KOC Molten Sulphur Handling Facilities at MAA Refinery . Client: KNPC

Platform: Piping

Period: Sep’15 – Oct’18

Location: Kuwait

Team Size: 4 Engineers & 2 Trainees

Summary: NAGRP

Client: KNPC

Platform: Piping

Period: Jan’14 – Aug’15

Location: Kuwait

Team Size: 8 Engineers & 2 Trainees

Summary: EPC for Revamp of MAA Burnery for Recovery & Smokeless Operation Client: KOC

Platform: Piping

Period: Jan’12 – Dec’13

Location: Kuwait

Team Size: 8 Engineers & 2 Trainees

Summary: Replacement of Hic Effected Vessels in SK GC's 3,4,7,8 & 21 Client: Foster Wheeler

Platform: Piping

Period: Oct’08 – Apr’11

Location: Singapore

Team Size: 12 Engineers & 20 Trainees

Summary: Singapore Parallel Train Project (SPT)

Client: SHELL

Platform: Piping

Period: Feb’08 – Oct’08

Location: Singapore

Team Size: 2 Engineers & 2 Trainees

Summary: Increase 500 CST Storage Capacity Double Hull Lighters Berthing at Wharf 1, 3, 10 Client: Foster Wheeler

Platform: Piping

Period: Oct’07 – Oct’08

Location: Singapore

Team Size: 10 Engineers & 20 Trainees

Summary: Bukum Refinery Modification Project (BRM)



Contact this candidate