CURRICULUM VITAE
NAME HAJI MUHAMMAD JAMALI
FATHER NAME MUHAMMAD BILAWAL JAMALI
NATIONALITY PAKISTANI
E –MAIL ******************@*****.***
DATE OF BIRTH 14th, APRIL 1966
MARITAL STATUS MARRIED
ADD IN AJMAN VILLA NO 1041 AJMAN NEAR SHAIKH AMMAR ROAD AJMAN UAE.
CONTACT NO . MOBILE .. 009**-**-*******/055*******.
WHATSAPPS NO 009****-*******
DRIVING LICENCE HOLDING VALID DRIVING LICENSE OF U.A.E.
TECHNICAL QUALIFICATION:
DESCRIPTION
CATEGORY
EXAMINING AUTHORITY
VALID DATE
COVERAGE
AIRCRAFT MAINTENANCE
ENGINEER’S LICENSE
( ICAO TYPE II )
AIRCRAFT MAINTENANCE
ENGINEER LICENSE
ICAO TYPE 11
‘X’ ELECTRICAL
ELECTRICAL.INST /FMS
AUTO PILOT
AIR PLANE.
RADIO/ RADAR
CIVIL AVIATION AUTHORITY
PAKISTAN
GENERAL CIVIL AUTHORITY
ABU DHABI ( U. A .E )
28JUNE. 2024
08-10-2027
B737-300
ELECTRICAL
INSTRUMENT/
FMS SYSTEM
A330-200/A340-300/A340-500/600
B777-200/300 classic.
B777-200LR
B777-300 ER.
A380-800 WITH
ENGINE GP7200 & TRENT 900
TECHNICAL COURSES:
DESCRIPTION
INSTITUTION NAME
DURATION
APPRENTICESHIP TRAINING
(AVIONICS)
P.I.A. TRAINING CENTRE, KARACHI,
PAKISTAN.
03 YEARS
(MAY 85 to 1988)
BASIC ELECTRICITY AND ELECTRONICS
P.I.A. TRAINING CENTRE, KARACHI,
PAKISTAN.
06 WEEKS
BASIC DIGITAL AND MICRO PROCESSOR
P.I.A. TRAINING CENTRE, KARACHI,
PAKISTAN.
03 WEEKS
B737-300 ELECTRICAL MAINTENANCE
P.I.A. TRAINING CENTRE, KARACHI,
PAKISTAN.
06 WEEKS
BASIC INSTRUMENTS / INS / IRS / GPWS
P.I.A. TRAINING CENTRE, KARACHI,
PAKISTAN.
08 WEEKS
B 737-300 INSTRUMENTS / FMS / GPWS
P.I.A. TRAINING CENTRE, KARACHI,
PAKISTAN.
05 WEEKS
B747-200 ELECTRICAL SYSTEM
PIA TRAINING CENTR E KARACHI
PAKISTAN
05 WEEKS
INTRODUCTION OF JAR 145
PIA TRAINING CENTRE KARACHI
PAKISTAN
02 DAYS
BASIC G PWS
P.I.A. TRAINING CENTRE, KARACHI,
PAKISTAN.
01 DAYS
AVIATION SECURITY
EMIATES AVIATION COLLEGE DUBAI
01DAY
MAS3000i PANASONIC SYSTEM
EMIRATES AVIATION COLLEGE DUBAI
01DAY
B777-200 AVIONICS RAMP & TRANSIT
HUMAN FACTOR & AIRCRAFT
MAINTENANCE
EMIRATES AVIATION COLLEGE DUBAI
EMIRATES AVIATION COLLEGE DUBAI
09DAYS
18-03-2009 & 19-03-2009
TWO DAYS
A330-200 AVIONICS COURSE
EMIRATES ENGG LEARNING ZONE ONLINE
ATTEND
STRESS MANAGEMENT FUNDAMENTAL OF EMPLOYES
EMIRATES ENGG LEARNING ZONE ONLINE
ATTEND
EK LINE MAINT PROCEDURE
EMIRATES AVIATION COLLEGE
ONE DAY
U A E AIR LEGISLATION
EMIRATES AVIATION COLLEGE DUBAI
06-04-09 TO 08-04-09
B 777-300 ER CONTINEOUS COURSE
EMIRATES ENGG ON LINE MY LEARNING ZONE
ATTEND
B 777-300 ER & 200 LR DIFFRENCE
EMIRATES ENGG ON LINE LEARNING ZONE
ATTEND
ACADEMIC QULIFICATION. i) BACHELOR DEGREE FROM SINDH UNIVERSITY OF PAK.
ii) HIGHER SECONDERY SCHOOL CERTIFICATE GOVT DEGREE
COLLEGE HYDERABAD SIND PAK
.
iii) SECONDERY SCHOOL CERTIFICATE GOVT HIGH SCHOOL
BAKHER JAMALI HYDERABAD PAK.
PROFESSIONAL EXPERIENCE.
PREVIOUS JOB SERVED PAKISTAN INTERNATIONAL AIRLINE IN ENGINEERING
DEPARTMENT, SINCE 5TH MAY, 1988. TO 14TH DEC, 2003. AS A
SENIOR AIRCRAFT MAINTENANCE TECHNICIAN IN AVIONICS
SYSTEM ON FOLLOWING AIRCRAFTS
.
B727-200 WITH ENG JT3D.
B707-300 WITH ENG JT3D.
B737-300 WITH ENG CFM56-3B2.
B747-200 WITH ENG JT9D/CF6.-80C2\E2
PERSENT JOB SERVING EMIRATES AIRLINE ENGINEERING DEPARTMENT AS
A “AIRCRAFT MAINTENANCE ENGR” IN BASE MAINT.& LINE
MAINTENANCE OPERATIONS ENGINEERING FOLLOWINGS A/Cs.
.
A330-200 WITH ENG TRENT 700.
A340-300 WITH ENG CFM56-5C
A340-500 WITH ENG TRENT 500.
B777-200 WITH ENG TRENT 800.
B777-300 WITH ENG TRENT 800.
B777-300ER. WITH ENG GE90-115B.
B777-200LR WITH ENG GE 90-115 B
B737-800 WITH ENG CFM56-7
A380-800 WITH ENGINES GP7200 & TRENT 900.
AVIATION EXPERIENCE. i) 16YEARS EXPERIECNCE IN LINE MAINTENANCE IN PIAC WITH
PRACTICE OF CONSULTING ALL AIRCRAFTS RELATED MANUALS.
ii) SIXTEEN YEARS CURRENT EXPERIENCE IN EMIRATES
BASE & LINE OPERATION ENGINEERING.
NATURE OF WORK SCHEDULED,UNSCHEDULED WORK,INSPECTION, REPAIR,
MODIFICATIONS,REPLACEMENT OF COMPONENTS,TROUBLE
SHOOTING OF AVIONICS SYSTEM,REMOVAL & INTALLATIONS,
FLIGHT REPORTED DEFECTS,DEFECT UNDER CONTROL M.E.L,
1). CARRIED OUT ROUTINE MAINTENANCE WORK LIKE TRANSIT CHK, PRE FLIGHT
CHK, WEEKLY CHK, SERVICE CHK, A-CHK, ETC.
2). WORKING ON INFLIGHT ENTERTAINMENT SYSTEM OF PANASONIC MAS 2000 &
MAS 3000i.& ICE IFE SYSTM ON B777-200 /300 LR,ER. A 380-800
3) WORKING ON SCHEDULED MAINTENANCE TASKS AS WELL AS RECTIFICATION
OF FLIGHT REPORTED DEFECTS IN TECH LOG N CABIN
4) REMOVAL AND INSTALLATION OF VARIOUS SYSTEM COMPONENTS
(ELECTRICAL ENGINE ANDAIRFRAME SYSTEM, FLIGHT INSTRUMENTS ETC.)
5). CARRIED OUT DEACTIVATION AND ACTIVITATION OF SYSTEM AS PER MEL FOR
DISPATCH OF FLIGHT.
6) WORKED ON SEVERAL SYSTEMS OF AIRCRAFT e.g.; AIRCONDITIONING &
PRESSURIZATION, PNEUMATIC, FLIGHT CONTROLS,ANTISKID & BRAKES, FUEL,
HYDRAULIC, ANTI-ICE SYSTEMS ATA CHAPTERS etc.
7). REMOVAL AND INSTALLATION OF ENGINE AND APU COMPONENTS.
.
8). CARRIED OUT OPERATIONAL AND FUNCTIONAL CHECKS OF SYSTEM.
9).CURRENT MANDATORY MODIFICATIONS & INSPECTIONS.
.