Innovative. Talented. Mechanical Engineer with * year experience and Skilled in fabrication, machining, inspection, testing, scheduling, welding and erection with a strong understanding of engineering mechanics, principles, and materials since graduating with a Mechanical Engineering degree in 2017. A communicative, encouraging team player who presents ideas effectively and is able to assist others in the latest procedures, continuously aim at value addition and up gradation of skills in the technical sphere so that I can prove to be an asset to organization, take a challenging role and apply my technical and Project Management skills to give an efficient and effective solution that would help the organization to achieve the desired goals in the business and technology.
EXPERTISE
Familiar with fabrication, erection of structural steel and piping with AWS-D1.1 and ASME B 31.3 codes •
Mechanical erection like platform, spools, valve, supports. •
Preparation of Risk assessment for normal and heavy erection . •
Preparation of rigging Plan for heavy erection. •
Proper arrangement of resources
i) Manpower
ii) Equipment
iii) Material
Study and analyzing design of drawing through AUTOCAD
MAJOR CLIENTS WORKED WITH COURSES ATTENDED
Mectro Electro Mechanical Sollution, MEP Engineering
Calicut, India H2S Safety
JINDAL STEEL AND POWER PLANT, Orissa Rigging and signal person
India Work at height
ACME INTERNATIONAL GENERAL TRADING CO Heat stress
Autocad
B.Tech in Mechanical Engineering (NOC Applicable)
TKM COLLEGE OF ENGINEERING.KOLLAM.KERALA
UNDER KERALA UNIVERSITY
Industrial Training
Name of the company : AUTOKAST, CHERTHALA.
Department Visited :Production and Manufacturing Department.
Products and Services of the Company: Manufacturers of automobile products
Learning : Process involved in the FOUNDRY and CASTING
Project
Title : Casting of Tio2-Al alloy in different wt proportion
Description : Characterization And study of nano composites which effect
percentage on the mechanical properties like yield,tensile etc
WORK EXPERIENCE
ACME International General Trading& contracting co (MAY 2017 - )
PROJECT :- SHUTDOWN PIPING AT GC 07, 11,20,21,(on going)(BRAKISH&IMPROVEMENT OF ESDV)
CLIENT :- ACME INTERNATIONAL CO
ROLL :- PIPING ENGINEER
Construction of spools of (cs.ss.sdss.Cu Ni) for shutdown work at koc.
Effective coordination and proper planning for completion of the work.
Meeting with client and superior authorities for reporting the status of work.
Coordinate with Design. QC Dept. Hydrotest. Painting authorities for timely completion .
Preparing monthly invoice.
Daily progress update.
Modification of the drawing as per site requirement.
Monitor the proper execution of inspection, NDT, as per field quality plan.
Solve cases of non-conformity and propose also possible solution.
Coordinate with supervisor for proper welding inch production.
PROJECT :- KUWAIT STEEL PLANT. SHUHAIBA (MAY 2019-N0V 2019)
CLIENT :- CIMPROGETTI
ROLL :- SITE ENGINEER
Construction of hydraulic piping system.
Site mobilization
Manpower orientation.
Project execution.
Supervise the work with safety and maximum quality.
Construction of complete piping system in the lime plant(Fuel, Compressed Air, Process Air, Cooling Water, Hydraulic).
Change the layout as per site condition.
Material segregation .
Making day today plan for work.
Invoice preparation.
Structural erection like platform, skid etc.
Clearing the punch list as per client observation. Supervise the leak test (pneumatic, hydro )
Identify the leakage, Doing corrective action with no delay. Carry on flushing work under supervision.
Take part a role in Commissioning the plant.
PROJECT :- LFHOD.ABDALI (OCT 2018- APR 2019)
ROLL :- SITE ENGINEER ( PERMIT HOLDER)
CLIENT :- KUWAIT OIL COMPANY
CONTRACTOR :- PETROFAC
Site supervision
Understanding design thoroughly and maintain quality control procedures
To execute overall on plot piping fabrication and erection works include identification of materials. Coordination for the qualification of welders.
Inspection of site as per isometric. GAD. and P&ID.
Preparation of as built drawing and test pack.
Preparation mechanical punch list. Flange management and box up activities as per applicable codes, procedure and standards.
To assist pre commissioning and commissioning activities of piping system completed include flange joint leak test, air flushing, water flushing, nitrogen purging etc.
Implementing permit to work system.
Responsible for daily tool box meeting gives workers safety awareness.
Daily progress report follow up.
Proper arrangement of equipment and manpower based on site without delaying production daily basis.
Resolving technical queries co-ordination with client for site modification and getting approval as per standards and revised drawing also.
Responsible for line checking after hydro test to complete the post punch list to sign off the test packages before signing the completion of piping.
Ensure that all punch list item are resolved, client handover is satisfactorily concluded and that there is no prolongation of project.
PROJECT :- WATER MANAGEMENT AT GC 03.07 (Structural fabrication)(MAY 2018- 0CT 2018)
CLIENT :- KUWAIT OIL COMPANY
EPC :- ALGHANIM INTERNATIONAL
DUTIES:-
Provide update progress report to client
Procurement of all materials required for completing the job according to specification in drawing.
Direct meeting with client and company officials.
Conduct meeting supervisor and make necessary plan to complete work beyond time schedule and budget.
Provide necessary manpower and tools for work.
Make invoice and analyze cost control process.
Direct interaction with design department about revision in drawing, corrections etc.
Coordinating with Blasting, painting, galvanizing team.
Proper dispatching of finished work to site as per client priority.
Mectro Electro Mechanical Solution, NAS ERECTORS AND PVT LTD
Calicut, India (APR 2017-MAY 2017) Orissa, India (JUN 2017 – MAY 2018)
To design HVAC system as per the Structural assembly and erection work
requirements. Prepare daily weekly and monthly schedule in
To assist contractors and implement site with client to maintain time schedule
the same as the design. Preparation of method of statement.
Monitor the execution of the Preparation of quality control procedures
development efforts. Support company in the revision of checklists
Time management. Equipment pre-installation, assembly,alignment
Site mobilization and safety inspections as per specified ITP (Inspection Test
requirement arrangement. Plan)
Ability to communicate professionally Preparation of punch lists
and effectively with all level of staff Final box up of equipment
Co-generation and pipe design Organize and manage all resources and field
Supervising Plumbing installation activities to achieve an efficient and effective
with following safety protocols completion of the target within the agreed time
Producing Viable Estimates For and cost whilst paying due regard to safety and
Projects Costs. meeting quality requirements.
Co-coordinating with contractors, clients and
planning team for steel and others sections and
ensuring the materials supply just in time.
Maintain the customer delivery schedule
LANGUAGES
English
Hindi
Malayalam
KEY SKILLS AND ACHIEVEMENTS
• Management :
During my work life I have demonstrated managerial skills by assisting and motivating the staffs to stick to
correct times schedules. This helped me to finish the company project in time.
• Problem solving :
Quick in dealing the problems and by proper clarification solving the problems raised from worker side during
the assemble and erection process. These initiatives helped to improve the clients satisfaction.
• Team Building :
By good communication, sharing ideas and motivating my team members, I was able to build a good team for
many projects undertaken by our company.
• Communication :
Good presentation skills and written communication skills demonstrated through close the client interactions.
This is a true copy of my CV. Any further information regarding my testimonials, I will be highly obliged to present the same upon demand or at the time of interview. References can be furnished if required.
Place : Kuwait city THANSEEL CP
Date :05-07-2020.