BALWANT SHARMA
Contact: 900******* (M), ~ E-Mail: **********@*****.***
Goal: Seeking assignments in operation as a Sr. shift Incharge in an organization of repute.
Synopsis:
Presently working with THERMAX LTD. as a Deck Engineer at J.K. CEMENT LTD. NIMBAHERA SITE 21 MW AFBC.
TPP operation Shift Incharge with over 10+ year of experience in Power Plant Operations and Maintenance.
Was Worked with Birla Cement Works, Chittorgarh in Power Division as Operation Shift Engineer.
Well equipped to handle a thermal power plant with a capacity of over 27 MW.
Operation and maintenance knowledge of AFBC,CFBC,PF & WHRS boiler and SNM,SIEMENCE,TRIVENI, BHEL & HANGZHOU STEAM Turbines.
DCS Honeywell (C- 300), ABB (AC – 800), Metso max-DNA 4.3.1, SIEMENS & PLC FLS Systems.
Efficiently handled turbines, pumps, heat exchangers etc.
Reducing downtime and enhancing operational effectiveness of various equipments through regular maintenance.
Skilled in managing installations, commissioning activities as well as maintenance of planned, preventive or predictive breakdown.
Energetic and quick learner with good communication and team management skills.
Manpower handling and ideas for modification in man & machine to increase plant efficiency.
Good knowledge about ISO, 5-S, fire &Industrial Safety.
Work Experience: 10 year approx.
Current Organization: Thermax Ltd., Pune (O&M)
Site: J.K. CEMENT LTD. NIMBAHERA Site.
Designation: Deck Engineer
Duration: Till Date
Temperature: 510 5o Celsius
Make: Thermax Ltd.
Working Platform: FLS SCHNEIDER (PLC Systems)
Turbine Type: Impulse Reaction Condenser Turbines
Turbo make: HANGZHOU STEAM TURBINE CO. LTD. CHINA
Specifications: 1X21 MW CPP, Boiler Type - AFBC, Capacity - 89 TPH,
Working Pressure – 84 kg/cm2, Temperature – 510 5o Celsius.
Job responsibilities: General Operations & Maintenance of Thermal Power Plant.
Organization: Birla Cement Works, Chittorgarh
Working period: since may-2013.
Designation: Shift Engineer (TPP)
Duration: 2 YEAR
Plant Capacity: 1X27 MW coal based Captive thermal Power Plant
Boiler Type: AFBC
Capacity: 2X65 TPH
Working Pressure: 85 kg/cm2
Temperature: 510o Celsius
Make: CVPL
Working Platform: SIEMENS Max - DNA (C-300) and DCS Systems
Turbine Type: Impulse Reaction Condenser Turbine
Turbo make: SIEMENS
Job responsibilities: General Operations & Maintenance of Thermal Power Plant.
Organization: SRSL GROUP LTD, (O&M)
Site: DUNGARPUR
Duration: 2.5 YEAR.
Designation: SHIFT INCHARGE
Specifications: 1X8 MW CPP, Boiler Type -AFBC, Capacity - 65 TPH,
Working Pressure–64 kg/cm2, Temperature – 490o Celsius.
Boiler Make: CVL Turbine Make: TRIVENI
Job responsibilities: General Operations & Maintenance of Thermal Power Plant.
Organization: Wartisila India Ltd., (O&M)
Site: Hindustan zinc Ltd. ZAWAR MINES
Duration: 1 YEAR
Designation: CONTROL ROOM ENGINEER
Specifications: 1X80 MW CPP, Boiler Type -PF, Capacity - 320 TPH,
Working Pressure–90kg/cm2, Temperature – 540o Celsius.
Boiler Make-THERMAX, Turbine Make- BHEL
Job responsibilities: General Operations & Maintenance of Thermal Power Plant.
Organization: Thermax Ltd., Pune (O&M)
Site: INDIA CEMENT BANSWARA,Site.(2.5YEAR)
Designation: Assitant Shift Incharge
Duration: 2.5 YEAR.
Temperature: 490o Celsius
Make: CVL India Ltd.
Working Platform: Honeywell (C-300 and DCS Systems
Turbine Type: Impulse Reaction Condenser Turbines
Turbo make: Semens
Specifications: 1X20 MW CPP, Boiler Type - CFBC, Capacity - 90 TPH,
Working Pressure – 85 kg/cm2, Temperature – 510o Celsius.
Job responsibilities: General Operations, Maintenance and Commissioning of Thermal Power Plant.
Key Deliverables:
Supervising and ensuring proper operations and maintenance work of 100% Pet Coke Fired AFBC Boilers, Fans, ID, FD, PA Fans Boiler & its auxiliaries.
Responsible for operations and troubleshooting of Turbine, Pumps, Compressors, Heat Exchangers and CHP & Ash Handling System.
Logging and maintaining operational record of the shifts, Daily Generation Report (DGR) for future reference.
Responsible for starting and shutting down of Safe Boiler (Hot & Cold).
Maintain strong safety mindset to assure the executed work reflects the technical requirements within company safety standards.
Highlights:
Attended Internal Safety Audit Training in 2011 at Thermax Ltd., Pune which is strictly following Occupational Health & Safety Management System (OHSAS)
Provided training and technical direction to a team of 20 Field Engineers and Jr. Field Engineers for performing operations and maintenance work on customer sites.
Took active part in accomplishment of AFBC Boiler tube replacement - In bed coils.
Certified Internal Safety Auditor for Thermax Ltd.
Industrial Training
Title: On Job Training.
Organization: Thermax Ltd., Pune (O&M).
Site: JK Cement, Nimbahera Site.
Duration: 10 Days.
Specifications: 1X22 MW CPP, Boiler Type - AFBC, Capacity - 90 TPH,
Working Pressure – 85 kg/cm2, Temperature – 510o Celsius.
Title: General Operations, Maintenance and Commissioning of Thermal Power Plant.
Organization: Thermax Ltd., Pune.
Location: Udaipur Training Centre.
Duration: 45 Days.
Description: Theoretical and practical training session on general operation, maintenance and commissioning of Thermal power plant at Udaipur Training Center, Thermax Ltd.
Academic Profile:
Diploma (Electrical & Power Plant Engineering) from B.T.E.R., JODHPUR in 2010. Secured 73 % marks.
H.S.C (RBSE) from Govt. sr. sec. School Mangalwar in 2007. Secured 64% marks.
S.S.C (RBSE) from Govt. sr. sec. School School Khodip in 2005. Secured72% marks.
Post diploma in fire and safety course P.T.U. Chandigarh.
Personal Info:
Name: Balwant Sharma
Fathers name: Ram Narayan Sharma
Sex: Male
Marital status: Married
Date of Birth: 8th june1990.
Permanent Address: Chittor road behind petrol pump mangalwar choraya - 312024, Rajasthan.
Language known: English and Hindi.
Permanent Address: Chittor road behind petrol pump mangalwar choraya - 312024, Rajasthan.
BALWANT SHARMA