Linguistic proficiency : English, Hindi, Tamil, Malayalam Linked In Profile : https://www.linkedin.com/in/mohamed-ali-30358965/ PROFILE

Experienced Senior Electrical Project Engineer with more than 5+ years of extensive experience in the field of Electrical Designs of Diesel Power Generation sets, Diesel Engines, Alternators (LV, MV), Substation Deigns (LV, MV, HV), Power Projects. Handling various Oil & Gas, Government and Private - Electrical, Instrument & Telecom Projects in UAE as per international standards with Clear understanding of Technical Drawings, Specifications.

WORK EXPERIENCE

SENIOR PROJECT ENGINEER-ELECTRICAL Dec 2017 - PRESENT Precision Industries

Dubai,

UAE.

Precision Industries is a UAE based Independent Generating Set manufacturer who extends as a manufacturer, installer and solution provider of diesel generating sets. PI is a certified Original Equipment Manufacturer (OEM) for major international brands such as Cummins, Perkins, Deutz, Kubota, Stamford, Mecc Alte, and Leroy Somer. Extending its supply all over UAE (Oil & Gas), Public Sectors, Africa, Oman, Pakistan etc. Brands Worked With

PROJECT ENGINEER-ELECTRICAL Oct 2014 - Dec 2017

ETA LLC. (PPD-Power Project division)

Abu Dhabi,

UAE.

ETA Power Projects Division (PPD) is an internationally renowned Engineering, Procurement

& Construction (EPC) contractor in the field of Sub-Station Design for HV, MV, LV Design Commissioning and Execution EHV Transmission, Distribution, Power Generation and Desalination projects.

Brands Worked With

MOHAMED ALI HAJA NAVAS

SENIOR PROJECT ENGINEER - ELECTRICAL

SOFTWARE PROFICIENCY

Windows, Microsoft Office Applications

Auto CAD- Version 2018

Lighting Sizing - Dialux, Relux

ALCAD, SAFT- Battery sizing Calculation

Engine Communication (CAN, Pandaros,Etc)

Knowledge of IEC and ISO standards.

Knowledge of ERP systems

Knowledge of ADCO, GASCO & TRANSCO specifications. PROJECT HANDLED

DIESEL POWER GENERATOR SET PROJECTS

Team Handled: 10 Pax under Direct Supervision

CLIENT : BORUGUE – PP5 Project

CONTRACTOR : TECHNIMONT INDIA

o Supply of 1250 kVA LV Emergency Diesel Generator Sets with set mounted Local and Remote Control Panel with Genset protection relay to Work as Backup and in Parallel with the switchgear Grid.

CLIENT : ADCO – BU HASA INTEGRATED FIELD DEVELOPMENT PROJECT CONTRACTOR : TECNICAS REUNIDAS UAE

o Supply of 3000 kVA MV (3.3kV) Emergency Diesel Generator Sets, With Remote Radiator and Exhaust Control (SCR) Systems, F&G Inergen Systems with set mounted Local and Remote Control Panel with protection relay to Work as Backup and in Parallel with the switchgear Grid.

CLIENT : ADCO – EPC FOR BU HASA INTEGRATED FIELD DEVELOPMENT PROJECT CONTRACTOR : TECNICAS REUNIDAS UAE

o Supply of 1000 kVA, 415V Emergency Diesel Generator Sets, With SCR Systems, F&G Inergen Systems with set mounted Local and Remote Control Panel with protection relay to Work as Backup and in Parallel with the switchgear Grid. CLIENT : ADCO – EPC FOR PROCESS CONTROL & POWER SYSTEMS UPGRADE/REPLACEMENT AT BAB CONTRACTOR : FORTUNE ENGINEERING & ENERGY SERVICES (FEES) o Supply of 800 kVA, 415V Emergency Diesel Generator Sets with set mounted Local and Remote Control Panel with protection relay to Work as Backup and in Parallel with the switchgear Grid.

CLIENT : SKEC (S K ENGINEERING & CONSTRUCTION COMPANY) - Korea o Supply of 1675 kVA MV Emergency Diesel Generator Sets – 2 units with Weather proof & acoustic Enclosure, heavy Duty

MOHAMED ALI HAJA NAVAS

SENIOR PROJECT ENGINEER - ELECTRICAL

DUBAI PROJECTS

DEWA - Supply of 2250 kVA, 415V Emergency Diesel Generator Sets Replacement of Exiting Diesel Generator set

DEWA - Supply of 550 kVA, 415V Emergency Diesel Generator Sets – Multiple Units / Configurations

DEWA - Supply of 825 kVA, 415V Emergency Diesel Generator Sets

ETISALAT – Supply of Dual Generator Sets 64 kVA, 32kVA, with Bulk Tank for continuous 24hr Operation

Supply of 2500 kVA MV Emergency Diesel Generator Sets – 6 units Open Type With Parallel Operation Feature

ABU DHABI PROJECTS

Trolley Mounted Genset – for Mobility Genset 125kVA for ADDC

Trolley Mounted Genset – for Mobility Genset 225kVA, ADDC

Hybrid Genset with Solar Powered Backup Diesel Generator for Traffic Systems

ETISALAT – Supply of Dual Generator Sets 64 kVA, 32kVA, with Bulk Tank for continuous 24hr Operation –Multiple Location

EPC SUBSTATIONT PROJECTS

Oil & Gas Substation Project 1:- GASCO-PGUR 5283

ASAB-0 SUBSTATION-0 (33kV/11kV 40/50MVA with STATCOM)

ASAB-1 SUBSTATION-0

ASAB-2 SUBSTATION-220

ASAB-3 SUBSTATION-9

Oil & Gas Substation Project 2:- GASCO-PGUR 5283 BUHASA SUBSTAITION-1(capacitor bank building 11Kv,5MVAr)

SKILL SUMMARY

Review of Manufacturer Design Documents in line with Specification, scope of work, Design documents, Order Copy and relevant standards then submit the same to client for Approval.

Selection of Compatible Diesel Generator sets based on the customer Requirement

Control Logic Preparation based on the Specification and Operation Philosophy Requirement.

Selection of Protection and Control Equipment’s and related Accessories.

Logic Preparation on Genset Controllers like Deepsea, CoMap, DEIF, Woodward

Preparation of Bill of Materials based on the project specification

Optimizing the BOM requirement to meet the customer Commercial limit.

Planning and Scheduling of the Project and Manufacturing Schedule to meet the Delivery and Execution on time

Execution and commissioning of Diesel Power Generator Sets.

Site execution and commissioning of equipment’s and other electrical works on Site MOHAMED ALI HAJA NAVAS

SENIOR PROJECT ENGINEER - ELECTRICAL

Involve in all designs of Primary and Secondary substation equipment’s like 33kV GIS, 11kV GIS, Auxiliary Transformers, Power Transformers, Capacitor Bank, SCMS,

Handling Designs of HV, MV Switchgear and its Primary & secondary equipment’s, Cable Sizing, DC Adequacy, CT/VT sizing calculation, Aux Transformer Designs, Power Transformer, SCMS, Telecom Designs

Implementing Project specifications and standards as per client requirement.

Reviewing Client Specification/scope and co-ordinate with manufacturer to get the correct Design.

Attended internal audit periodically on projects to make sure the quality requirement implementations

Co-ordinate with site engineers and preparing site red mark-up drawings with manufacturer for final scheme preparation to the site backup.

Liaising with drafting team in review and preparation of As-built Document preparation based on the site red mark-up drawings.

Co-ordinate with Manufacturer schemes & GA’s if any issues raises and receive the compliance statement against client / consultant comments.

Work closely with the Commissioning and Procurement Leads to assure project requirements across the design, procurement till construction and handover activities are clearly stated and systems are in place to verify compliance.

Involved in closure of SAFOP (Safety Operation Philosophy) Action points.

Worked Closed in preparation of Cable Schedule, Interconnection schedules, SLD, PSLD, Interconnection Schedule, electrical procedures, etc.

Project planning (EDDR/VDDR) Preparation and Updating Construction register, Pre commissioning and Commissioning Register based on the site progress. TRAININGS UNDERGONE

H2S awareness and escape training

First aid and Fire Fighting awareness.

Permit Originator, and PICWS (Person In charge of Work Site)– GASCO BUHASA

Handled, Witnessed and Authorized the Factory Acceptance Alternator FAT test

– Marelli Motori Spa - Italy

EXPERTISE FIELD

Diesel Generator Sets for Oil & Gas areas.

Engine Control Systems (CAN) for Perkins, Cummins, Volvo, MTU, Kubota

Control, Logic for Diesel Generator suitable for Oil & Gas areas.

Genset Controllers (Deepsea, CoMap, DEIF, Woodward)

Battery Sizing (NI-CAD)

Lighting Sizing Calculation

MOHAMED ALI HAJA NAVAS

SENIOR PROJECT ENGINEER - ELECTRICAL

EDUCATION

B.Tech EEE: Electrical and Electronics Engineering (First Class) 2010 – 2014 B.S. Abdur Rahman University

Chennai, Tamil Nadu, India.

MBA : Master of Business Administration Pursuing B.TECH - PROJECTS

ARMED COMBAT VEHICLE WITH MAGNETIC LAUNCHER AND HUMAN DETECTION USING PIC CONTROLLER

Aims to design and develop a reluctance launcher as an Electromagnetic Launch System using a DC power Supply. To launch projectile solely using Electromagnetic force. To use the vehicle in all situations for human surveillance. PERSONALITY

Driven to learn and apply new ideas.

Enthusiastic, creative, and willing to assume increased responsibility.

Unique ability to adapt quickly to challenges and changing environments.

Experienced in balancing priorities for short-term and long-term goals. DRIVING LICENSE ISSUED FROM:

United Arab Emirates

India,

I hereby declare all the above Indicated details True to my Knowledge MOHAMED ALI HAJA NAVAS.