To obtain a responsible position, where my capabilities and experience can be used to the best efforts, where I can make a real contribution to achieve the goals of a professionally managed organization. 15 years of experience as a Senior Piping Design Engineer including Front End Engineering, basic engineering, detail engineering & pre bid engineering and Tender’s engineering. Detail Engineering work experience includes preparation of Technical specification/Material Requisitions & detailed engineering of piping for upstream Oil & Gas, Flow lines and Power Industries. Experienced in piping engineering activities including design & Review of Plant Overall Layout, General arrangement drawings, piping and Equipment Layouts, 3D Modeling, Isometrics, pipe supports, Design & preparation of Calculations, BOQ, Data sheets, materials selection, Technical specification, Stress analysis & Etc…
JOB RESPONSIBILITIES:-
• Participation in meeting with the EPC contractor for resolving technical comments in order to finalize the design basis and detailed engineering drawings.
• Preparation of Technical Specification for pipes, fittings, valves, and specialties, piping and valve material selection & Data sheets.
• Preparation of piping design calculation such as pipe sizing/ wall thickness, insulation thickness, pipe line pressure drop, valve selection and pipe fittings as per ANSI, ASME, API and ASTM standards & pipe Trench, pipe sleeper & Rack loading calculations.
• Involving the Design and Development of overall Plot Plan as per client specification and requirement.
• Preparation of Bill of Materials Pipe & Fittings as per Pipe Routing.
• Bill of materials of Valve & insulation schedule preparation.
• Familiar with main stream, Condensate, HP/ LP By pass lines of steam turbine piping layouts.
• Design & Review of Heavy fuel oil (HFO), Light Diesel oil railway/truck unloading, storage, forwarding pump house internal piping, overall piping layout and tank farm piping layout as per API, ANSI, ASME codes standards and industry practices.
• Familiar with Design, checking & finalization of Equipment & Piping Layout and Isometrics, Pipe Trench & rack arrangement and Pipe support drawings, fabrication drawings for Steam lines & above 24” lines, water lines, condensate, fuel oil & instrument service air lines for BTG & BOP system and Diesel/ Gas Engine Based in the power projects.
• Checking of Equipment layout, piping isometric drawing in line with P&ID, piping layout and line list.
• I am familiar with 3D Model using software’s like Cadworx, Smart Plant 3D, Plant design system (PDS 2010), PDMS, Resolving clashes and optimizing the layout & isometrics, BOM, Line and Valve list extracted from the modeling software.
• 3D Modeling Review & resolve for clash deduction using Autodesk Naviswork Freedom & simulate and Smart plant review (SPR)
• Site verification, Design & checking of new well hook ups (On Plot) and Off Plot Flow line Routing layout, detailed layout, Hook up drawings, on plot isometrics and MTO preparation.
• Coordination with Client/Consultant and Attending meeting with Client/ Inter departments.
• Have exposure towards Piping PRE FEED study, FEED, Detail Engineering of coal, oil & gas based power projects at various EPC companies.
• Handled team more than 10 members from Engineers to designer, skilled with leadership, team management, problem solving, decision making, training & development of team, analytical & communication skills.
• Familiar with relevant IS codes & International codes (API, ANSI & ASME).
• Provide the technical support during the Project Execution phase, review & approval of Design change notice (DCN) submitted by EPC contractor and resolving the technical issues.
• Planning, initiating, executing and monitoring projects along with time, cost and quality parameters including technical (engineering) and techno commercial coordination with all stakeholders.
• Coordinating with external agencies for techno commercial negotiations, preparing tenders/contract documents, cost estimates, including invoicing, variation/deviation proposals, claims, etc. Design and Review of MEP engineering such as HVAC, Fire fighting, water supply & drainage system layout and shop drawings.
• Application Knowledge of industry standards and codes like ASME, API, NFPA, ISO, IS, BS, DEP, ASHRAE and NFPA etc., accepted design practices and quality standards.
• Preparation engineering project planning schedule with milestones by using MS project.
• Preparation of technical proposal for new piping related projects.
• Review and approval of vendor drawings and documents. QA/QC Engineer: ISO 9001 -2015 certified internal auditor
• Conducting the Internal Quality Audits & Providing the necessary support to the External Auditors while conducting the Quality Audits of the assigned projects and ISO 9001 certification audits.
• Control, Monitoring and Maintaining the quality & Resolving quality related technical issues internal organization by using ERP system.
• Continuous follow up and Ensure the quality of project internal process and deliverables.
• Take corrective actions to close the non conformities if any observed during the Project Quality Audits.
• Preparation of QA / QC related documents, internal forms and Procedures.
• Project planning schedule and milestone monitoring on a regular basis for various projects and reporting to the concern Project Manager and department head.
• Monitoring all the outgoing all the deliverables (Drawings and documents) & incoming inputs.
• Continuous monitoring of project & proposal department and reporting to the General Manager.
CAREER SUMMARY
1. M/s. RITAJ ENGINEERS & CONSULTANTS, Al Khuwair, Muscat, Sultanate of Oman. Period of Employment: From January -2015 to Till Date. Designation : Senior Piping Engineer.
Responsibilities:
• Reporting to Head of the Department on day to day basis.
• Leading the project team and the project.
• Handled team more than 10 members from Engineers to designers.
• Preparation and planning of design deliverables by using Document control schedule.
• Providing the Technical guidance and support to discipline engineers.
• Providing Regular training and knowledge development seminar for my Team members.
• Attending the technical meetings with client / contractors/suppliers.
• Design and Review of all design drawings / documents prepared by designers / engineers.
• Preparation of design & Tender documents and tender evaluation.
• Monitoring the progress of the project and take necessary steps to expedite the project progress.
• Co ordination and Solving the inter discipline interface issues.
• Preparation of Input drawings / Hand sketches for designers.
• Preparation of Input documents for Engineers to prepare the piping deliverables.
• Preparation of Input FEED drawings/ documents / Hand sketches to other disciplines.
• Review and approval of technical check for all the piping deliverables.
• Review and approval of inter department check from other department.
• Preparation of project planning schedule in MS project.
• Updating and monitoring the Document Control Schedule (DCS) of the Project.
• Site visit whenever required.
POWER PROJECT’s:
1. M/s. Khasab Power Station, Musandam, Oman, 80 MW Diesel Generation Power Plant.
2. M/s. Masirah Power Station, Oman. 56 MW Diesel Generation Power plant. 3. M/s. Fershat Qatbeet New Power Station In Dhofar Governorate (Capacity 4x2 MW, 2x1 MW Diesel Generator)
4. M/s. Rehabilitation Of Hitam Power Station in Wusta Governorate (Capacity 4x500 KW Diesel Generator)
5. M/s. Upgrading of Andat Power Station (Capacity 2x500 KW Diesel Generator) 6. M/s. Upgrading Of Hijj Power Station In Alwusta Governrate, Sultanate Of Oman.
ROLE : Positioned as Piping Lead Engineer, performing the following activities
• Preparation of design basis report for piping, Valve & expansion Bellows specifications/ Data sheets.
• Preparation of bill of quantities for pipe and fittings, valves & Specialties..
• Design and Review of overall Plot plan, Equipment & piping Layouts.
• Design and Review Pipe Sizing, Pipe Thickness & insulation thickness Calculations, pipe rack/ trench loading calculations.
• Design and Review of inside Engine Hall Piping layout and engine access Plat forms
• Design and Review of general arrangement of Oil Storage Tank and water tanks.
• Design & Review of General Arrangement of Pipe rack/Pipe trench drawings.
• Design and Review of Pipe fabrication drawings piping Isometrics and support Drawings.
• Review of P&ID’s, flow diagrams, line and valve lists.
• Design and Review of Stress & flexibility analysis carried out by using CAESER II 2013 R1 version.
• Coordination with Client/Consultant and Attending meeting with Client/ Inter departments.
• Review the vendor drawings and make the technical comments / approval. PROJECT: Yibal Khuff Cogeneration Power Plant (1 GT + 1 ST) ROLE : Positioned as Piping Lead Engineer, performing the following activities
• Design & Review of Complete Piping (Main steam, LP steam, Gas lines) and pipe rack layout, Equipment Layout (Gas turbine building steam turbine building, BFP building, HRSG area), Plot plan
• Preparation of design basis report for piping, Valve & expansion Bellows specifications/ Data sheets.
• Preparation of bill of quantities for pipe and fittings, valves & Specialties..
• Design and Review of overall Plot plan, Equipment & piping Layouts.
• Design and Review Pipe Sizing, Pipe Thickness & insulation thickness Calculations, pipe rack/ trench loading calculations.
• Design and Review of Gas turbine & steam turbine area drawings.
• Design and Review of general arrangement of Air compressor and water tanks.
• Design & Review of General Arrangement of Pipe rack/Pipe trench drawings.
• Design and Review of Pipe fabrication drawings piping Isometrics and support Drawings.
• Review of P&ID’s, flow diagrams, line and valve lists.
• Design and Review of Stress & flexibility analysis carried out by using CAESER II 2013 R1 version.
• Review and approval of vendors drawing.
• Coordination with Client/Consultant and Attending meeting with Client/ Inter departments.
• Review the vendor drawings and make the technical comments / approval. POWER PROJECT : DALEEL Power Plant and Distribution (5 GT’s ) ROLE : Positioned as Piping Lead Engineer, performing the following activities
• Design & Review of Complete Piping plan drawing (Fuel oil, Rich fuel Gas system, cooling water, potable water & instrument and service Air) and pipe trench layout, General arrangement of (Gas turbine, Cooling tower area, water tanks fuel oil tank farm area, fuel oil unloading & transfers pump house, fire water tank and pump house), overall Plot plan
• Preparation of design basis report for piping, Valve & expansion Bellows specifications/ Data sheets. (for fuel gas system referring PDO standards)
• Preparation of bill of quantities for pipe and fittings, valves & Specialties..
• Design and Review of overall Plot plan, General arrangement & piping plans.
• Design and Review piping Trench loading calculations.
• Design & Review of General Arrangement of Pipe rack/Pipe trench drawings.
• Design and Review of Pipe fabrication drawings piping Isometrics and support Drawings.
• Review of PEFS, PFS, UFS, Line and valve lists.
• Design and Review of Stress & flexibility analysis carried out by using CAESER II 2013 R1 version.
• Review and approval of vendors / Sub contractor’s drawings & documents.
• Coordination with Client/Consultant and Attending meeting with Client/ Inter departments.
• Review the input vendor drawings and make the technical comments / approval. OIL & GAS PROJECT’s
PROJECT: FLOWLINE CONSTRUCTION FOR QARRAT AL MILLAH (QAMP) ROLE : Positioned as Piping Lead Engineer, performing the following activities Flow line (On / off plot) & Well Hook ups
• Design, Review and Approval of New well hook ups Flow line (Pipe line) Routing layout, isometrics and Manifold’s for QAMP oil field in QARRAT AL MILLAH area.
• Design, Review and Approval of MTO well hook up on pad and off plot work.
• Co ordination with RAY (EPC Contractor) for interference checking and resolving technical issues.
• Design, Review and Approval of Flow line routing Plan / Site verification from Burhan North to Burhan station (19 KM)
• Stress & flexibility analysis carried out by using CAESER II 2013 R1 version. Preparation of bill of quantities for pipe and fittings, valves, Supports & Specialties. PROJECT: TULEILAT, QHARIR & SADAD GATHERING STATIONS (ENGINEERING DESIGN MODIFICATION & AS-BUILT) PROJECT FOR PDO
ROLE : Positioned as Piping Lead & Project Engineer, performing the following activities
• Input collection and preparation of Engineering Project planning schedule in MS Project.
• Input collection from AIC team & PDO portal, preparation of weekly progress report based project progress and meeting with PDO.
• Overall project co ordination & Responsibility.
• Design and Review of Overall plot plan, Equipment location plan, site plan, Key plan
& General arrangement of piping layouts based site & Engineering requirement.
• Physical site verification of all the piping and mechanical related drawings / Documents & preparation of Red line mark up’s (RLMU).
• Design & Review of Emergency escape route, Safety & Live saving equipments layouts, Hazardous area classification drawings.
• Review and approval of all the sub contractors / Vendor drawings.
• Co ordination with EPC / Client/Consultant and Attending meeting with Client/ Inter departments.
• Review & Approval of Vendor drawings.
• Supporting & attending HAZOP session for all the stations.
• Final submission of drawings / documents and project close out. PROJECT: NIMR-E PLOYMER INJECTION STATION & DWD STATIONS (6 PHASES)
(ENGINEERING DESIGN MODIFICATION & AS-BUILT) PROJECT FOR PDO ROLE : Positioned as Piping Lead Engineer, performing the following activities
• Input collection and preparation of Engineering Project planning schedule in MS Project.
• Design and Review of Overall plot plan, Equipment location plan, site plan, Key plan
& General arrangement of piping layouts based site & Engineering requirement.
• Physical site verification of all the piping and mechanical related drawings / Documents & preparation of Red line mark up’s (RLMU).
• Review of Process Engineering flow scheme (PEFS), Process floe scheme (PFS), utility flow scheme (UFS), Spectacle Blind register, LO/LC registers, line list and valve list.
• Review and approval of all the sub contractors / Vendor drawings.
• Co ordination with EPC / Client/Consultant and Attending meeting with Client/ Inter departments.
• Review the vendor drawings and make the technical comments / approval.
• Supporting & attending HAZOP session for both the stations. PROJECT: HUBARA AND SAHMAH BOOSTER STATIONS (ENGINEERING DESIGN MODIFICATION & AS-BUILT) PROJECT FOR PDO
ROLE : Positioned as Piping Lead Engineer, performing the following activities
• Input collection and preparation of Engineering Project planning schedule in MS Project.
• Design and Review of Overall plot plan, equipment location plan, site plan, Key plan
& General arrangement of piping layouts based site & Engineering requirement.
• Physical site verification of all the piping and mechanical related drawings / Documents & preparation of Red line mark up’s (RLMU).
• Review of Process Engineering flow scheme (PEFS), Process floe scheme (PFS), utility flow scheme (UFS), Spectacle Blind register, LO/LC registers, line list and valve list.
• Design and Review of Stress & flexibility analysis carried out by using CAESER II 2013 R1 version.
• Review and approval of all the sub contractors / Vendor drawings.
• Co ordination with EPC / Client/Consultant and Attending meeting with Client/ Inter departments.
• Review the vendor drawings and make the technical comments / approval. PROJECT: AL-BURJ WATER INJECTION STATION (ENGINEERING DESIGN MODIFICATION & AS-BUILT) PROJECT FOR PDO
ROLE : Positioned as Piping Lead Engineer, performing the following activities
• Design and Review of Overall plot plan, equipment location plan, site plan, Key plan
& General arrangement of piping layouts based site & Engineering requirement.
• Physical site verification of all the piping related drawings.
• Review of P&ID’s, flow diagrams, line and valve lists.
• Design and Review of Stress & flexibility analysis carried out by using CAESER II 2013 R1 version.
• Review and approval of vendors drawing.
• Coordination with Client/Consultant and Attending meeting with Client/ Inter departments.
• Review the vendor drawings and make the technical comments / approval. PROJECT: PROCURMENT & CONSTRUCTION OF FLOWLINES, PETROGAS RIMA LLC. ROLE : Positioned as Sr.Piping Engineer, performing the following activities Flow line & Well Hook ups and Headers:
• Design, Review and Approval of New well hook ups Flow line (Pipe line) Routing layout, isometrics, Flow line replacement, MSV’s and new headers for PETRO GAS oil field in Rima.
• Design, Review and Approval of MTO well hook up on pad and off plot work.
• Co ordination with BOGS (EPC Contractor) for interference checking and resolving technical issues.
• Stress & flexibility analysis carried out by using CAESER II 2013 R1 version. Preparation of bill of quantities for pipe and fittings, valves, Supports & Specialties. PRE-BID ENGINEERING / TENDER PROPOSALS :
• Proposal drawing preparation and approval like flow schemes, Overall plot plan and initial General Arrangements
• Preparation of Equipment lists, Bill of quantities of Pipe & fittings, valves & Specialties for pre bid Engineering work.
• Preparation and Approval of CTR’s for Piping and Mechanical dept for new tenders for engineering work.
• Preparation of technical proposals, scope of work, project planning schedule and supporting documents for tender / new project proposals. ACCOMPLISHMENTS:
• Successfully handled design and engineering work for BOGS / PETROGAS : (Flow Line and Pipeline / Header Projects) of Flow lines and Well Hook ups Project (Production and Water Injection, Approx. 85 wells commissioned from Jan’15)
• MSV Oil Manifolds Extension Projects.
• 7 km Nuham to Tannum Header (CS + PE Lining) of design work.
• Successfully handled design and engineering work (Piping & Mechanical Dept) for Aljood / Global Chemicals / RAECO (Diesel Generation Power Plant Projects) of Khasab Power Station, Musandam, Oman, 80 MW Diesel Generation Power Plant.
• Masirah Power Station, Oman. 56 MW Diesel Generation Power Plant.
• Yibal Khuff Cogeneration Power Plant (1 GT + 1 ST)
• Al Burj Water Injection Station.
• Procurment & construction of flowlines, petrogas rima llc. 2. WORLEY PARSONS Ltd, Al Khobar, Kingdom of Saudi Arabia. Period of Employment : From January -2014 to December-2014 Designation : Senior Piping Engineer.
PROJECT: SAUDI ELECTRICITY COMPANY: PP13 & PP14, 2175 MW POWER PLANT ROLE : Positioned as Sr.Piping Engineer, performing the following activities
• Preparation of design basis report for piping, Valve & expansion Bellows specifications/ Data sheets.
• Design and Review Pipe Sizing, Pipe Thickness & insulation thickness Calculations, pipe rack/ trench loading calculations.
• Review the vendor drawings and make the technical comments / approval.
• Pipe Thickness and pipe Rack load calculation.
• Design & checking of General arrangement of Pipe rack & pipe sleeper planning.
• Preparation, Design & checking of 3D model using Plant Design System 2010(PDS Equipment and piping)
• Review & Approval of Equipment & piping Layouts, Isometrics and Support drawing.
• Preparation of P&ID using Smart plant P&ID.
• Preparation of bill of material for Valves and Pipe & Fittings.
• Co ordination with interdepartmental for interference checking and resolving clashes.
3. FICHTNER Consulting Engineers (India) Pvt Ltd, Chennai, Tamil Nadu, India Period of Employment: From September 2006 to January 2014 Designation : Piping Design Engineer.
PROJECT: 71MW & 21MW CATERPILLAR POWER GENERATION SYSTEMS PORT BUCHANAN
& TOKEDE PORT AT LIBERIA
ROLE : Positioned as Piping Lead Engineer, performing the following activities
• Preparation of design basis report for piping, Valve & expansion Bellows specifications/ Data sheets.
• Design and Review of overall Plot plan, Equipment & piping Layouts.
• Design and Review Pipe Sizing, Pipe Thickness & insulation thickness Calculations, pipe rack/ trench loading calculations.
• Review the vendor drawings and make the technical comments / approval.
• Development of Complete Piping (Thermal oil, HFO, DFO, Lube oil system) and pipe rack layout, Equipment Layout (Caterpillar Diesel generator power house building, Tank farm & Unloading pump house and Radiator cooler area), Plot plan using CADWORX PLANT 3D.
• 2D Layout and Isometric drawings extraction using CADWORX Plant 3D.
• Preparation of BOQ for pipes, fittings, valves, and specialties, piping and valve material selection.
• Pipe Thickness and pipe load calculation.
• Co ordination with interdepartmental for interference checking and resolving clashes.
• (9 months deputation at Kiel, Germany for engineering co ordination) PROJECT: 2400 MW RAS Al KHAIR AND DESALINATION PLANT (PHASE-1), KINGDOM OF SAUDI ARABIA
ROLE : Positioned as Piping Lead Engineer, performing the following activities
• Preparation of design basis report for piping, Valve & expansion Bellows specifications/ Data sheets.
• Design and Review Pipe Sizing, Pipe Thickness & insulation thickness Calculations, pipe rack/ trench loading calculations.
• Preparation of BOQ for pipes, fittings, valves, and specialties, piping and valve material selection.
• Review the vendor drawings and make the technical comments / approval.
• Design of Complete Piping (Main stream, LP steam, Gas lines etc.) and pipe rack layout, Equipment Layout (Gas turbine and steam turbine building), Plot plan using SMART PLANT 3D 2009.1.
• Review engineering for piping drawings of Shenguwa (Critical and composite piping layouts, pipe rack layouts, Large diameter Cooling water piping layouts, BFP piping layouts Etc, Isometrics and support drawings).
• Pipe Thickness and pipe load calculation.
• Co ordinating with inter department for interference checking and resolving clashes.
• (11 months deputation to Stuttgart, Germany for SP3D training and engineering coordination/ 6 months deputation on JINJU, Korea for engineering co ordination) PROJECT : 428 MW Al QATRANA ELECTRIC POWER COMPANY CCCP, JORDAN ROLE : Positioned as Piping Engineer, performing the following activities,
• Preparation of design basis report for piping, Valve & expansion Bellows specifications/ Data sheets.
• Design and Review Pipe Sizing, Pipe Thickness & insulation thickness Calculations, pipe rack/ trench loading calculations.
• Preparation of BOQ for pipes, fittings, valves, and specialties, piping and valve material selection.
• Review the vendor drawings and make the technical comments / approval.
• Design of Complete Piping (Main steam, LP steam, Gas lines) and pipe rack layout, Equipment Layout (Gas turbine building steam turbine building, BFP building, HRSG area), Plot plan using CADWORX Plant 3D.
• 2D Layout and Isometric drawings extraction using CADWORX Plant 3D.
• Pipe Thickness and pipe load calculation.
• Co ordination with inter department for interference checking and resolving clashes. PROJECT: 300MW COMBINED CYCLE, KERAWALAPITIYA, SRILANKA ROLE : Positioned as Piping Engineer, performing the following activities,
• Preparation of design basis report for piping, Valve & expansion Bellows specifications/ Data sheets.
• Design and Review Pipe Sizing, Pipe Thickness & insulation thickness Calculations, pipe rack/ trench loading calculations.
• Preparation of BOQ for pipes, fittings, valves, and specialties, piping and valve material selection.
• Review the vendor drawings and make the technical comments / approval.
• Development of Complete Piping(Main steam, LP steam, Fuel oil lines, Large diameter cooling water pipes) and pipe rack layout, Equipment Layout(Gas turbine building steam turbine building, BFP building, HRSG area, Tank farm, unloading and forwarding pump house) Plot plan using CADWORX Plant 3D.
• 2D Layout and Isometric drawings extraction using CADWORX Plant 3D.
• Co ordination with inter department for interference checking and resolving clashes Development of STG plant 3D model using CadWorX Plant 2009 (Won First prize from Intergraph USA).
• (8 months site deputation for Engineering co ordination at Srilanka) PROJECT : 225 MW BETA COMBINED CYCLE POWER PLANT, UTTARKHAND, INDIA ROLE : Positioned as Piping Engineer, performing the following activities,
• Preparation of design basis report for piping, Valve & expansion Bellows specifications/ Data sheets.
• Preparation of BOQ for pipes, fittings, valves, and specialties, piping and valve material selection.
• Review the vendor drawings and make the technical comments / approval.
• Design and Review of General arrangement, Equipment and Piping layouts.
• Design & checking of Pipe rack, Sleepers and pedestal loads calculations & drawings.
• Review of piping isometric drawings.
• Design & review of Pipe Supports detailed drawing.
• Plot plan using CADWORX Plant 3D.
• 2D Layout and Isometric drawings extraction using CADWORX Plant 3D.
• Co ordination with inter department for interference checking and resolving clashes. PROJECT : KORPA WEST, 350 MW COMBINED CYCLE POWER PLANT AT NOIDA, NEW DELHI, INDIA.
ROLE : Positioned as Piping Engineer, performing the following activities,
• Preparation of design basis report for piping and Valve specifications.
• Preparation of BOQ for pipes, fittings, valves, and specialties, piping and valve material selection.
• Design and Review of General arrangement, Equipment and Piping layouts.
• Design & Review of Pipe rack, Sleepers and pedestal General arrangement drawings.
• Review of piping isometric drawings.
• Design & review of Pipe Supports detailed drawing.
• Review the vendor drawings and make the technical comments / approval.
• Co ordination with inter department for interference checking and resolving clashes. THERMAL POWER PLANT EXPERIENCE
a. 2 x 270 MW GVK Thermal Power Plant, Goindwal Sahib, Punjab, India. b. 2 x 300 MW Thermal Power Plant, Dhariwal, India. c. 2 x 660 MW Thermal Power Plant, Krishnapatnam, Andra Pradesh, India. d. 1x600 MW Kakathiya thermal power Plant, Telangana, India e. 1x600 MW Rayalaseema thermal power Plant, Kadapa, Andra pradesh, India ROLE : Positioned as Piping Engineer, Performing the following activities,
• Preparation of design basis report for piping & Valve specifications/ Data sheets.
• Preparation of BOQ for pipes, fittings, valves, and specialties, piping and valve material selection.
• Review the vendor drawings and make the technical comments / approval
• Design the complete balance of plant piping layout & checking of isometrics, pipe supports and General arrangement of Pipe rack /Pedestals layout.
• Design & review of Large diameter Cooling water piping and pump house.
• Preparation of bill of materials for pipe, fitting, valves, Specialties & pipe supports.
• Inter department coordination for interface checking. PROJECT : 2X300MW, Coal Based Thermal Power Plant, Dhariwal Infrastructure (P) Limited, Chandrapur, Maharashtra, India.
ROLE : Positioned as Piping Lead Engineer, performing the following activities
• Preparation of design basis report for piping, Valve & expansion Bellows specifications/ Data sheets.
• Design and Review Pipe Sizing, Pipe Thickness & insulation thickness Calculations, pipe rack/ trench loading calculations.
• Preparation of BOQ for pipes, fittings, valves, and specialties, piping and valve material selection.
• Review the vendor drawings and make the technical comments / approval.
• Design and Checking of Equipment Layout on Fuel oil tank farm area, Fuel oil pump house, Cooling water Pump house, Auxiliary cooling water pump house, Raw water pump house, Compressor house, Water treatment plant, Clarified water cum Fire water pump house, Ash handling compressor house, Ash water & Slurry pump house, General arrangement of Fuel oil storage tank & Water storage tank, General arrangement of pipe rack, General arrangement of pipe sleeper and General arrangement of trench.
• Design and Checking of Piping Layout on Raw water pump house, Clarified water pump house, DM Water tank area, CW Makeup water system, Condensate storage tank area, CW Blow down system, Effluent collection system, Main Plant Air Compressor area & Ash handling system Compressor Area, Overall pipe cum Cable rack, Effluent treatment plant & CMB area, Reservoir area, Admin Building and Fire station area, BTG Building (Auxiliary cooling water & utility piping only),CW system stand pipe arrangement, Inside TG Hall Auxiliary cooling water system, Ash water & Slurry pump house area, Potable water over head tank area, CMB Pump house area
• Design and checking of Isometric drawing and support for various systems.
• Preparation of specification, Bid Evaluation & Vendor Engineering for Piping supply, Fittings supply, Valves supply, Large size butterfly valve supply, Air release valve supply, Rubber expansion joints supply, LP Piping Erection, CW & ACW Piping supply, CW & ACW Piping Erection, Fuel oil storage tanks and Water storage tanks.
• Calculation for Pipe sizing & Pipe thickness, Pipe Sleeper loads, and Pipe rack loads.
• Preparation and