Summary Background

I began my career in commercial team as a Cost & Benefit Surveyor in Oman which required weekly detailed measurement of all the labor trades of company like, bricklayers, painters, masons, carpenters, etc and the like, to quantify their daily & weekly progress and calculate into monetary values. This weekly information was also used for progress of the project and fed to the project team for delay records. That start provided me with excellent understanding of construction processes and materials.

Areas Of Expertise

Airport, Auditoriums, Villas

High Rise, Mixed Use, Hotel, Residential

Infrastructure & Roads

Renewable Energy, Solar

Power Stations, Substations

Measurements, Quantity Survey, Cost Control

Contract, FIDIC, SMM7, ISO 1200

Bid Processing, Tender, Contract Management

Variation, Cost Reporting, Claims

Oracle, AutoCAD, MS Office

Professional Experience

Manager QS-Civil July, 2018 Current

EGIS INDIA CONSULTING ENGINEERS Pune, Maharashtra

Value of Project: - INR 408,00,58,000/- USD 74,182,872/- (74 Million USD)

Type of Project: - Construction of New Integrated Terminal Building, Reconstruction of Old Terminal Building, Pune Airport Maharashtra India Total Development 92,000Sqm area

Description / Scope of Project: - PMC from Concept to Commissioning of NITB, Reconstruction of Old PTB, Modification of Existing expanded PTB, Design & Detail Engineering of Stuctural, Architectural, HVAC, MEP, BMS, CCTV, SAS, Roads, Passenger Moment System, Vertical & Horizontal Transport, BHS, Fire Fighting, FADS, PBB, Solar System, Media Planning & Interior, PA & Acoustic System, Substation, STP, WTP, RWH, Rain Water Harvesting, Landscaping, Value Engineering, BOQ Preparation, Detailed Project Report DPR, Rate Analysis, Estimation, Preparation of Tender, Clarification, Bid Processing, Cost Control, Contract Administration, Award of Contract, Certification of Bills till DLP total 45months from June 2017

Work Involvement:

Preparation of bid documents, comparative and justification statement, conducting pre-bid meetings and preparing replies to bidders queries, bid amendments, minutes and corrigendum to issue to contractors

Assisting in award of work, finalizing the Notice Inviting the Tender to invite bid from qualified contractors.

Updating Cost Reports, Preparing Cost Value Reconciliation report, Project Summary Report, anticipated cost reports.

Preparing and maintaining cash flow forecasts for making available cash for the project and providing report to client on requirement of cash on quarterly basis.

Preparing monthly progress report (MPR) of the executed works, variation orders for balance of cost, flow of cash & duration of the contract.

Preparing Material Reconciliation

Certification of Measurements and agreeing client and contractor s QS on changes in measurements, preparing payment recommendation, preparing Deviation items and analyzing the rates for variations.

Assistant Cost Manager November, 2016 February, 2018

APPLE CONSULTANCY SERVICES India

Value of Project: - INR 55,85,93,75,000/- USD 866,439,816/- (866 Million USD)

Type of Project: - Construction of Renewable Energy (SOLAR) Power Projects in Karnataka & Maharashtra from 100MW to 250MW including 11kv Substations and Power House.

Description / Scope of Project: - Cost Control & Quantity Surveying Works. Project Spread Across 2500Acres of Land includes construction of new PV Solar Energy production farm, Substation, Feeder Station, Distribution Station, Power House, WTP, OHWT, 50 Bore wells of 9 inch to 12-inch-wide dia, 2 Lane 34 km Bituminous Tar Road.

Work Involvement:

Verification Sub-Contractor Bill Certifications. Agreeing Sub-contractors for the measurement of changes on invoices.

Preparation and submission of Reports which is the comparison of Projects revenue with the project s cost to understand the Project s financial status.

Preparing Cost Reports, Material Inspection and its approval including preparation of reports

Monitor the variance in the contract with the help of field engineers and quantify them in terms of change order claims.

Quantity Surveyor June, 2015 October, 2016

ARABTEC CONSTRUCTION LLC BAHRAIN Bahrain

Value of Project: - BHD 382,900,000/- USD 1,190,470,909 (1.1 Billion USD)

Type of Project: - Bahrain International Airport Modernization Program Main Works

Project Description: - Demolition of Existing Terminal, Construction of New Passenger Terminal Building, Central Utility Complex, Interconnecting Corridor, Car Park, Landside and Air Side Infrastructure, BHS, VT System, PLB, PBB & ICT system.

• Responsible for Sourcing enquiries from suppliers and subcontractors and performing evaluation of quotations received and advising Manager on subcontractor selection matters.

• Preparation of Interim Payment Applications to Client and Preparing the certification of payments for subcontractors.

Preparing Commercial Reports Like Monthly Reports, VOWD (Value of work done), Monthly Payment statements

Quantity Surveyor June, 2014 March, 2015

ARABTEC CONSTRUCTION SAUDI ARABIA PVT LTD Al Hassa, Saudi Arabia

Value of Project: - SAR 5,277,088,178/- USD 1,584,728,151/- (1.58 Billion USD)

Type of Project: - 5000 Villas Residential plus Infrastructure having built up Area of approximately 1.6 million m and a total site area of around 6million m

Project Description: - Construction of G+1 5000 Villas, MEP, Furnishings, Substation, Street Lighting, 64km Roads, 9 masjids, UGT, Drinking & Irrigation water network, Underground Drainage, Ponds, Potable & Fire Water Works, STP 12000m3 for Saudi Arabian National Guard SANG

Work Involvement:

• Leading the team of 4 QS s while Responsible for Preparation of Interim Payment Applications (IPA) to Client and Subcontractors Interim Payment Certificates (IPC).

Maintaining the Project risk register and identifying new risks for treatment / rescue.

Tracking of Insurance/ Performance Bond/Bank guarantees/ Other Contractual provisions with subcontractor.

Liaising with Finance teams for release of letter of credit, bill payments and timely delivery of materials.

Liaise with QC Department for the approved WIR s for monthly claims.

• Taking off quantities for infrastructure works like Drainage (100 to 1000mm u-PVC), Irrigation (15 to 250mm u-PVC) and Water & Fire Fighting (25 to 400mm u-PVC), Sewage (300 to 700mm GRP) pipe lines and Main & Branch Roads (25mtr & 35mtr) about 150km.

• Responsible for Preparation of Cost Value Reconciliation, Project Summary Report. Cost Summary Reports.

Quantity Surveyor - Contracts April, 2012 April, 2014

SAMSUNG C&T (INDIA) PVT LTD (Korean Company) Mumbai, India

Type of Project: - Mixed Use Development (Hotel & Residential High Rise Project) 2.75Acres

Value of Project: - INR 19,83,68,38,646/- USD 360,669,793/- (360 Million USD)

Project Description; - This project consisting of 2 high rise towers, located in Downtown Mumbai, India. The development total construction floor area is 418,506m2.

Tower A is 52 stories, 254-meter-high and consists of Office & Hotel spaces. 28 story Office space, 24 story 5* Hotel

Tower B is an 85 stories, 386-meter complex high and consists of Residence

Work Involvement:

Interface with engineering, construction, and client representatives with respect to contracting activities in creating special conditions and preparation of scope of work to be included in each package of project

Prepared and issued tender clarifications to the bidders, issuance of bid evaluation reports and review of submittals, preparing award recommendation and contract awards for works of HVAC, PLUMBING & FIREFIGHTING, FAÇADE, GRC, GRP and BLOCK WORK & PLASTERING

Preparing / developing RFP / RFQ for inviting proposal / Evaluate vendor s Quotation & Proposals as per project contracting standards, issuing tender package and coordinating pre-tender meeting & site visits for various packages such as Finishes, Infrastructure Works, Manpower, Equipment hire etc. Preparing comparative statement and assessment of the quotes / Proposal received

Assisting in the procurement delivery tracking, Preparing the tender reports for each work package and making recommendations to the Client.

Quantity Surveyor October, 2011 April, 2012

FAITHFUL GOULD SAUDI ARABIA Jeddah, Saudi Arabia

Type of Project: - KAIA Airport Jeddah

Value of Project: - SAR 26,401,000,000/- USD 7,040,266,666/-(USD 7 Billion)

Project Description; - State-of-the-art Air Traffic Control Tower over 135m high (In charge of this Section)

Passenger Terminal Building of 670,000 sq m floor area, a state-of-the-art facility spread over a spectacular twin crescent footprint

46 contact gates, 96 boarding bridges, including double deck A380 access

Internal Automated People Mover linking the passenger processors and the international hub

Work Involvement:

Measure, quantify and value the works in accordance with construction drawings.

Verifications of all invoices of the payments and variations for sub-contractor on site

Maintain the records of all sub-contractor s agreement and their payments

Monitor the variance in the contract with the help of field engineers and quantify them in terms of change order claims

Responsible for the Checking the materials on and off site and verified delivery and acceptance from the client s representative for payment approval

Cost & Benefit Surveyor January, 2009 September, 2010

CARILLION ALAWI LLC OMAN Muscat, Oman

Type of Project: - Auditorium & Parliament Projects

Cost of Project: - USD 202,800,000/-

Project Description: - ROYAL OPERA HOUSE in MUSCAT

Total Area of project 80,000 square meters Eight hectares (20 acres)

1,200-seat concert hall, 18,580 SM / 200,000 SF Concert hall area

Movable acoustic shell within the stage area

Adjustable proscenium elements to create alternative acoustic configurations

Work Involvement:

Allocating the allocation hours into activities performed

Preparation & Production of labor Productivity report for frame work

Preparation of weekly incentivisation report of labor of frame work activities on the basis of working strategies according to project execution plan

Agreeing measures with subcontractors or the client s quantity surveyor

Preparation of Monthly evaluation of works for Block works, Plastering, Rendering, Screed and Painting

Successfully maintained & prepared the list of day works in compliant with the standard instruction like RFI CVI & SM for monthly claims to client as part of an additional works submission and contra charge to subcontractor

Junior Engineer July, 2007 November, 2008

IMI SOFT INDIA PVT LTD Bangalore, India

Type of Project: - Telecom Services Projects

Checked the Detail of Reinforcement, Quality & Quantity of Concrete as per given in the drawing & schedule for various telecommunication towers

Checked the concrete thickness in foundation pad, chimney, Checking of Grade of concrete & Alignment of columns, Template fixing for installation of mobile Telecommunication towers & verification of Civil Works tests reports

Performed NDT Tests (Nondestructive test) to identify grade of concrete and reinforcement details & analyzing building stability

Drawn the drawing of existing building with physical dimensions & reinforcement details for design of telecommunication tower & to apply extra load over buildings

Checked and verified Excavation, Dimensions & material procured

Education

Diploma In Civil Engineering March, 2007

Government Polytechnic Gulbarga Gulbarga, India

Personal

Languages : English, Hindi, Urdu, Kannada, Arabic

Technical Skills : FIDIC, SMM7, IS1200,

Nationality : Indian

Marital Status : Married

Passport No & Details : L-7299791, 27-02-2024

DOB : 22-03-1983



Contact this candidate