PROFESSIONAL EXPERIENCE- 25 yrs
JOB OBJECTIVE
Seeking assignments in Project Management / Maintenance / Technical Operations with an organization of repute preferably in Power Plant / manufacturing unit/Food Industries/Paper Mill/Chemical Plant.
SPLIZATION/HVAC/ DG/ STEAM TURBINE / AHU/ BOILER / GAS TURBINE /INSTRUMATION /MECHNICAL
PROFILE SUMMARI
Well versed with system design, modification and development to suit different conditions of operations and abilities in troubleshooting of critical systems in power stations.
1.SAMTEL COLOR LTD
3 Nov 1990 – 10 DEC 1998
Joined samtel color ltd the first color tube project in India, having collaboration with Mitsubishi which is world neon owned manufacturers of picture tubes with a total project cost of 750 million. Getting opportunity to work from
Senior Tech. Assistant
Work Profile
Responsible to supply un interpreted utility services to production 24 hrs by upkeep & maintaining following utility machines
Diesel Generators – kirloskar & Cummins – 1000 KVA – 5 nos
Air conditioning plant – Voltas- 120 Tr – 5 nos
Air compressor – 600 CFM-7 nos with refrigerated air dryers.
Hydrogen, Nitrogen, Oxygen generator plant & LPG handling.
DI Plant, Softening Plant & hot water boiler,Cooling towers, ETP
Fire fighting system & LPG sprinkler system
GAS turbine 4 MW &5 MW
EGB boiler & FO fired boiler capacity – 40 TPH at 65 bar make - Thermax
2.Elect Tech Pvt Ltd, Ghaziabad
28 Dec 1998– 17 Feb 2001
Asst. Engineer –Projects Theraml power plant
Work Profile
Erection & commissioning of 225 *2 mw steam turbine power plant project which includes the following. 165 kg / cm2 steam pr. Coal fire boiler THERMAX
Instrumentation
Water flow meters, gas flow meters, DDC controller, pneumatic valve controller, water treatment plant, pH meter, conductivity meter, hardness control instruments.
Switch Gear
1.132 KV / 440 KV switchyard & metering, MV bus ducts, Transformer distribution system
2.315MVA - 400/220/33KV and 200/160 MVA - 220/132/33 KV Auto Transformer with loaded 33 KV tertiary winding. b) 50MVA/80MVA - 220/33KV, 20MVA / 31.5 MVA / 50 MVA - 132/33KV Power Transformer
3.Relay protection ABB, Siemens & L&T (spac-141C,140D,SIEMENS.7UT512,7SJ.7RW,)
4.Power & distribution transformer, earthing & lighting protection, illumination communication & DC system
4 11KV / 132 KV power plant gas turbine make HITACHI, 2*250 mw steam turbine make BHEL
3 – Sr. Manager ( Power Plant) Tata power 1300 MW THERMAL POWER PLANT (Trombay) Aug 2001 to 22 July 2012
The trombay thermal powerstation, located in mumbai, has an installed generation capacity of 1580 MW .Providing power to majority consumer in Mumbai
I currently have a position for an individual to work at Manager Level for Tata power plant. The correct applicant will be responsible for Power Plant operations including Production (Power Boiler, Recovery Boiler, Water Treatment and Turbines), Maintenance (Mechanical, Electrical, PSD, DCS, Instrument) and Technical Department. The correct applicant will have solid power plant experience with at least 5 or more years in a very senior manager or GM position.
Set department targets, ensure plans are developed to support these targets, review the progress and modify if necessary in order to achieve the budget target.
Responsible for safe and efficient operation of plant systems in accordance with plant procedures and rules, by developing and implementing procedures, system and methods to reduce risks to health and promote safety awareness to create a safe working environment for employees.
Assists in annual budgetary preparations; researches budget needs; compiles budget data; negotiates budget terms; and reviews budget on regular basis.
Develop an environment of continuous improvement with the goal of being world leaders
Assists in the development of policies, standards and procedures to ensure the mill is in compliance with environmental legislation and international standards
Responsible to conducting performance evaluations on personnel as required.
Develop team spirit within departments support each other in achieving sub goals.
Responsible to review organization, recruitment and training programs to ensure employee’s professional skills.
Develops quality strategies and initiative to consistently achieve the define standards to meet
Project management relating to change and improvements in the Central Utilities Plant
Maintenance Department: work planning and scheduling
Responsibilities
Engineering: project advice, asbestos management and building repairs
Outside contractors: project work, repair services and engineering
Expert in Operation and Maintenance of Central Utilities Plant systems
500 mw steam turbine BHEL, 255 KG/cm2 steam generation at temp 563 deg c,coal fire boiler capacity 360 TPH, compressed air, high pressure piping, high voltage electrical
11kv/400/ 123 kv/ 66 kv/33kv/11/.440 kv voltage transmissions line
225 mva transformers 11 kv / 400kv *2 Bhel make
production and distribution, large high horsepower prime movers and controls
Report on all Powerhouse activities, prepare monthly allocation and costing reports, update staff weekly on items of Company interest, liaise with Maintenance and Distillery Staff to coordinate work and operations schedules, meet with Union Representatives quarterly to review potential problems and resolve issues, ensuring monthly reports are on time, maintenance and operations schedules are met, weekly operating instructions and schedules are updated and promptly respond to Union issues
Highlights:
Dexterously handled PLC and SCADA modification for process improvements
Significantly contributed towards 1% reduction in breakdowns / downtime through effective mainte
4- K.R Pulp & Paper mill ( Shahjahanpur ) : Turnover 3000 Cr.
10Aug 2012 to 10 May2016
Sr . Manager (Electrical Maintenance & Instrumentation/Power plant)
Kr paper manufacturing 300 ton/Day writing paper and 90 Ton/Day calendar Paper
Work Profile:
Pulpmill,Recovery Plant,Paper machine, Crystallization plant, Rewinder Section, Paper cutting Machine Upto 400KW A.c & D.c Drives SCADA System.
12 MW Steam Turbine Make Siemens (Extraction cum Condensing Turbine) Steam Pressure 65Kg/Cm2,Steam Temp. 540(Degree)Cent.
2 MW Back Pressure Turbine Makes Triveni. Steam Pressure 17kg/cm2
80Ton AFBC Coal Fired Cum Baggas Make CVL Boiler. Steam Pressure 70kg/cm2
Ash-Handling, Coal Handling,ESP System.
5- LS power & control Pvt limited GURUGRAM HRIYANA as
DGM a maintenance / Project
8 June2016 to 20 March 2020
Execution and preventive maintenance of electrical system, such as HV / LV power distribution system, E HV / HV / LV bus tie metal clad switch gear SF6 rated up to11KV /400 /132/ 6,600 V, substation type transformer rated 250 MVA 125 MVA, squired/ induction motor rated up to 2,400 KW, Duble bus tic system, and control/ monitoring system, PLC.
Execution and preventive maintenance, inspection related to Vacuum Circuit Breaker rated 6, 600 V, sf6 Circuit Breaker rated 400 kV, Control Panel, HV/ LV Cables, HI-Pot testing, Meggering, Protection System, Protective devices.
Attend trouble shooting jobs related to generator protection relay, induction motor protection relay, transformer protection relay, UPS, feeder protection relay, VCB. ACB., Sf6
Handle some modification works pertaining to electrical power plant generation and other power plant/ desalination auxiliaries. FD/ ID / PA / Coal handling/ ash handling / Esp/Boiler/ hvac
Witness and observe testing/ commissioning of electrical system such as "Bus tie type substation system, Ring main units, VCB, ACB, UPS/ Battery Charger including inverter,
transformer OLTC type rated 150 MVA, manual type 80MVA, 42MVA, 20MVA, Induction
Motor 3, 600KW, 2,400KW, and 1,700KW, HV/LV Power cables and protection system such as distance relay, thermal O/L relay, Instaneous/ Inverse time O/C relay, DIFFERENTIAL relay,
Directional/Back-up impedance relay, locked motor relay, negative sequence relay.
Prepare some modification drawing and material take off for electrical equipment control system prior for electrical system up gradation.
Log off deficiency noticed during inspection prior for submission to Electrical Maintenance Supervisor/ Engineer.
Knowledge on the type of permit and lock out tag, prior for isolation of equipment.
Attend some calibration works related for protection system such as generator, motor, transformer, VCB/ ACB relay.
Conduct "kick method test", "polarity test" and "second injection test" for current
Transformer, instrument transformer and potential/ voltage transformer.
Knowledge on how to use the testing and measuring equipment such as PROGRAMMA, ABB TYPE< MERLIN GERIN BREAKER TEST KIT< AVO BM-11 HV MEGGER AND HYPHOTHRONICS TEST KIT FOR WINDING RESISTANCE, measurement.
Duties and Responsibilities:
Implement preventative maintenance programs of electrical equipment, system and network in accordance with the establishment schedules and instruction from supervisor. Changes brushes; wiring and bulbs, cleans motor and lubricates moving parts; check tests substations calibrations, fuses, earth connections, insulations battery charge, UPS, etc., using testing equipment; and generally checks visually for damage, corrosion, loose connections, etc. Notes and reports any problem requiring repair work to supervisor.
Observes all safety and loss prevention procedures, exercise good housekeeping practices, keeping workshop and job sites clean and tidy. Obtained required work permits and exercises particular care and attention in ensuring that electrical equipment and system are isolated prior to repair.
Performed other similar or related duties such as reporting job completion and any problem encountered to supervisor, obtaining materials, special tools and spare parts from warehouse, suggesting possible minor design changes to eliminate repetitive faults, with contacted technicians in multi-craft work and working on afternoon
●EDUCATION
●Degree course in B.E (Electrical) from IIME DELHI in 1998 in first division
● Diploma in Electrical Engineering with first division in 1989 from MP Polytechnic Gorakhpur (UP)
● Passed high school with 2nd division in 1983 from Allahabad board
● Passed intermediate with 1st division in 1985 from Allahabad board
COMPUTER KNOWLEDGE
●Proficient with the use of windows, MS Office and Internet.
●Comfortable working in SAP & ERP.
PERSONAL DETAILS
●Date of Birth: 09 JUNE 1966
●Father's Name: Shri Ram Chandra Prasad
REFERENCES
●Notice Period: 31 days
●Salary drawn 65000 per month in Hand
● Expected Salary - As per current salary & post.